Progress
The Indian Army (Department Of Military Affairs) in Hisar, Haryana seeks procurement of multiple structural and fittings items including Horizontal Main Pole, Base Plate, Turn Buckle, Vertical Rope Main Pole, Top Horizontal Beam, Manila Rope, Connection Plate Nut and Bolt, and Charges. Estimated value is ₹4,00,000 with a total of 8 items in the BOQ. The scope covers Supply, Installation, Testing, Commissioning of goods, plus operator training and any required statutory clearances. An option clause allows up to 25% quantity variation at contracted rates, with delivery time calculated from the last delivery order date and extended periods capped by the original delivery window.
Product/service names and categories: Horizontal Main Pole, Base Plate, Turn Buckle, Vertical Rope Main Pole, Top Horizontal Beam, Manila Rope, Connection Plate Nut and Bolt, Charges
Quantities/capacities: not specified (N/A in BOQ)
Estimated value: ₹4,00,000
Experience requirements: not explicitly listed; refer to defense hardware procurement norms
Quality/standards: not specified in provided data
Delivery/installation: SITC, installation, testing, commissioning, operator training
Warranty/AMCs: not specified
Option-based quantity adjustments up to 25% during contract and currency
Scope includes SITC and operator training; potential statutory clearances
Delivery period rules hinge on last delivery order date with minimum 30-day extension
Not disclosed in data; bidders should verify in official tender documents
Delivery period linked to last date of original delivery order; extensions governed by option clause and minimum 30 days
Not specified in data; bidders must check final tender terms for LD provisions
Experience in supply, installation, testing and commissioning of hardware fittings for defense or large-scale procurement
Demonstrated capability to provide operator training and statutory clearances if required
Compliance with general government procurement norms and basic financial health
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BLUE THROAT LIMITED Under PMA | - | 06-10-2026 11:31:56 | |
| 2 | DHEERAJ FABRICATORS AND ENGINEERS Under PMA | - | 05-10-2026 21:57:27 | |
| 3 | Kovil Global Enterprises Under PMA | - | 08-10-2026 23:44:01 | |
| 4 | M/s DEVANSH TRADERS Under PMA | - | 05-10-2026 22:13:08 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | DHEERAJ FABRICATORS AND ENGINEERS(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Horizontal Main Pole,Base Plate,Turn Buckle,Vertical Rope Main Pole,Top Horizontal Beam,Manila Rope | |
| L2 | M/s DEVANSH TRADERS (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Horizontal Main Pole,Base Plate,Turn Buckle,Vertical Rope Main Pole,Top Horizontal Beam,Manila Rope | |
| L3 | BLUE THROAT LIMITED (MSE)( MSE Social Category:OBC ) Under PMA | Item Categories : Horizontal Main Pole,Base Plate,Turn Buckle,Vertical Rope Main Pole,Top Horizontal Beam,Manila Rope | |
| L4 | Kovil Global Enterprises (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Horizontal Main Pole,Base Plate,Turn Buckle,Vertical Rope Main Pole,Top Horizontal Beam,Manila Rope |
Quantity
169
Category
Horizontal Main Pole
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
6
Past Performance
20 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Horizontal Main Pole , Base Plate , Turn Buckle , Vertical Rope Main Pole , Top Horizontal Beam , Manila Rope , Connection Plate Nut and Bolt , Charges
Pre-Bid Date
30-09-2026 18:00:00
Pre-Bid Venue
TCP3, HISAR CANTT, HISAR, HARYANA-125006, CONTACT NUMBER- 9777704313, TIMING 09 HRS TO 10 HRS, IT IS A DEFENCE PROCUREMENT, YOU HAVE TO ATTEND PRE BID MEETING WITH PAST PERFORMANCE CERTIFICATE WITH COMPLETE DIAGRAM OF THIS PROCUREMENT
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Hisar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Hisar | Hisar | - | - | 3 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Horizontal Main Pole
12 Ft Height, 6 Inch Dia, 5 mm Thick
Base Plate
12x12 inch, 10 MS Plate with 4 Hole
Turn Buckle
12 inch Heavy Duty , 2000 Kg Cap
Vertical Rope Main Pole
100mm Dia MS Pipe ,Heavy Duty 6 Mtr 20 Ft
Top Horizontal Beam
100x100 mm Sq Pipe 4M L & 5M Thick
Manila Rope
35 mm Dia, 5 Srand, Twisted, ISI Marked
Connection Plate Nut and Bolt
Required Size
Charges
Labour, Welding & Painting
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Horizontal Main Pole | 12 Ft Height, 6 Inch Dia, 5 mm Thick | 3 | pieces | bcskylancer | 15 | |
| 2 | Base Plate | 12x12 inch, 10 MS Plate with 4 Hole | 3 | pieces | bcskylancer | 16 | |
| 3 | Turn Buckle | 12 inch Heavy Duty , 2000 Kg Cap | 2 | pieces | bcskylancer | 17 | |
| 4 | Vertical Rope Main Pole | 100mm Dia MS Pipe ,Heavy Duty 6 Mtr 20 Ft | 3 | pieces | bcskylancer | 18 | |
| 5 | Top Horizontal Beam | 100x100 mm Sq Pipe 4M L & 5M Thick | 1 | pieces | bcskylancer | 19 | |
| 6 | Manila Rope | 35 mm Dia, 5 Srand, Twisted, ISI Marked | 100 | pieces | bcskylancer | 20 | |
| 7 | Connection Plate Nut and Bolt | Required Size | 50 | pieces | bcskylancer | 21 | |
| 8 | Charges | Labour, Welding & Painting | 7 | days | bcskylancer | 22 |
Extended Deadline
09-Oct-2026, 3:30 am
Opening Date
10-Oct-2026, 3:30 am
GST registration certificate
PAN card
Experience certificates (similar supply of hardware fittings for defense/macrocivil projects)
Financial statements (last 2-3 years or as required by terms)
EMD/Security deposit documentation (if specified elsewhere in terms)
Technical bid documents and compliance statements
OEM authorizations or dealership certificates (if any OEM constraints exist)
Key insights about HARYANA tender market
Bidders should submit GST, PAN, financials, experience certificates, EMD (if required), OEM authorizations, and technical compliance documents. Ensure SITC scope covering supply, installation, testing, commissioning, and operator training. Verify 25% quantity option and delivery terms tied to last delivery order date. Prepare a detailed bill of quantities even if BOQ items show N/A.
Eligible bidders must demonstrate experience in defense hardware supply or similar large-scale projects, provide financial statements, and possess GST and PAN. Submit OEM authorizations if required and ensure ability to deliver SITC services including training. Compliance with delivery extension rules and option clause is essential.
Required documents include GST certificate, PAN, experience certificates, financial statements, EMD documentation, technical bid documents, and OEM authorizations. Prepare compliance statements for each of the 8 BOQ items and confirm installation and training capabilities within the scope.
The tender data lists product categories (poles, ropes, beams) but provides no explicit technical standards. Bidders should rely on standard defense hardware specifications, ensure SITC capability, and verify any OEM or BIS/ISI or ISO requirements via the official terms while aligning with the 8-item scope.
Delivery period begins from the last date of the original delivery order. If quantities increase up to 25%, the extension is calculated as (Additional quantity / Original quantity) × Original delivery period, minimum 30 days, with potential extension to the original delivery period as per option rules.
Exact payment terms and penalties are not specified in the data. Bidders should expect standard government terms: milestone-based payments after SITC, with possible performance penalties as per final contract. Confirm LD provisions and payment schedule in the official tender documents.
The BOQ lists 8 items in total, but all items show N/A for quantity and unit. Bidders should seek clarification on exact item quantities and unit measurements in the formal tender addenda and submit flexible pricing accordingly.
Scope includes Supply, Installation, Testing, Commissioning of goods, plus Training of operators and providing necessary statutory clearances, if any. Prepare a comprehensive SITC plan and capability statement to demonstrate readiness for end-to-end execution.