TenderDekho Logo
Closed GEM

Jammu and Kashmir Tourism Development Corporation Split AC Procurement Srinagar IS 1391 Part-2 BIS 2025 Tender

Bid Publish Date

15-Dec-2025, 11:10 am

Bid End Date

27-Dec-2025, 12:00 pm

EMD

₹37,000

Progress

Issue15-Dec-2025, 11:10 am
Technical26-12-2025 12:28:25
Financial
AwardCompleted

Key Highlights

  • • BIS certification requirement: IS 1391 Part-2 for OEM and product compliance
  • • Mandatory hot & cold functionality for AC units
  • • Free standard installation, testing & commissioning included
  • • Minimum 5-year compressor warranty and copper condenser coil mandate

Tender Overview

The Jammu and Kashmir Tourism Development Corporation invites bids for wall-mount split air conditioners, including green AC units, to be installed at locations in SRINAGAR, JAMMU & KASHMIR. The procurement requires BIS certification (IS 1391 Part-2), hot & cold functionality, free standard installation and testing, and a minimum compressor warranty of 5 years. The OEM must provide copper condenser coils and an OEM authorization certificate. An EMD of ₹37,000 is specified, with delivery within the permissible frame and service support obligations. A dedicated service center presence in-state is required, with establishment within 30 days of award if not existing, and escalation matrices for service support. Quantity adjustments up to 25% are permitted at contract, at contracted rates.

Technical Specifications & Requirements

  • Product category: Split air conditioner including Green AC, wall-mount type (V2) Q2.
  • Standards and certifications: BIS IS 1391 Part-2; ISI marked equipment as applicable; OEM authorization.
  • Functional requirements: Hot & Cold functionality; two free preventive maintenance visits per year; new & unused packaging units.
  • Key components: Copper condenser coil mandatory; compressor warranty minimum 5 years.
  • Installation and service: Free standard installation, testing & commissioning; dedicated toll-free service support; EO/Service escalation matrix required.
  • Delivery and warranty: Delivery within the specified frame; state service centers or establishment within 30 days; warranty terms and AMC details to be provided by OEM.

Terms, Conditions & Eligibility

  • EMD: ₹37,000 (as per tender terms).
  • Delivery terms: Delivery within the time frame; option to extend up to 25% quantity with same rates; extended delivery time formula with minimum 30 days.
  • Service & support: Dedicated/toll-free service; functional service center in-state; post-award establishment within 30 days with documentary evidence.
  • Warranty & penalties: 5-year compressor warranty; two free PM services per year; penalties/accessories as per ATC; LD provisions as applicable.
  • Documentation: OEM authorization, BIS certificate, installation proof, service escalation matrix, and proof of service center capability.
  • Quality/packaging: Items must be new and unused, original packaging; on-site/ carry-in warranty as applicable.
  • Payment terms: Payment and release conditions tied to service center documentation and compliance with installation and commissioning.

Key Specifications

  • Product: Split air conditioner (Green AC), wall-mount type, V2 (Q2)

  • EMD: ₹37,000

  • Standards: BIS IS 1391 Part-2; ISI compliant as applicable

  • Warranty: Compressor warranty ≥ 5 years

  • Condenser: Copper coil mandatory

  • Installation: Free standard installation, testing & commissioning

  • Maintenance: Two free preventive maintenance visits per year

  • Service: OEM authorized with dedicated service center in-state

Terms & Conditions

  • Quantity may increase/decrease by up to 25% of bid quantity during contract and currency, at same rates

  • Delivery timeline: from last date of original delivery order; minimum 30 days for any extended period

  • OEM must provide valid BIS certification and OEM authorization; service centers established within 30 days

Important Clauses

Payment Terms

Payment terms aligned to delivery, installation completion, and service verification; verify with procurement for release post-mandatory installation.

Delivery Schedule

Delivery period begins after original delivery order; option quantities may extend delivery time as per formula; minimum 30 days.

Penalties/Liquidated Damages

Penalties apply for late delivery, non-conformance, or failure to establish state service centers within 30 days; LD as per contract terms.

Bidder Eligibility

  • Experience in supplying/setting up split air conditioners with ISI/BIS standards

  • Demonstrated service network in Jammu & Kashmir with in-state center

  • Financial capacity to cover EMD and installation commitments

Advertisement

Technical Results

S.No Seller Item Date Status
1
ORIGIN SOLUTIONS   Under PMA
Make : LG Model : TS-H19VNXE or Equivalent26-12-2025 12:28:25

Financial Results

Rank Seller Price Item
L1
ORIGIN SOLUTIONS   Under PMA
Item Categories : Split Air Conditioner Including Green AC, Wall Mount Type (V2)

Tender Data

Bid Details

Quantity

25

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Requirements

Min. Avg. Annual Turnover

6

OEM Avg. Turnover

36

Past Performance

20 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)

Authority Records

TOURISM DEPARTMENTJAMMU AND KASHMIR TOURISM DEVELOPMENT CORPORATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8679694.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar AC supply/installation

4

Financial statements for past 2-3 years

5

EMD submission proof (₹37,000) via DD/online

6

Technical bid documents and compliance certificates

7

OEM authorization certificate

8

BIS certification (IS 1391 Part-2) and ISI certifications (if applicable)

9

Proof of existing or proposed service center in-state

10

Escalation matrix for service support

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Srinagar split AC tender with BIS IS 1391 Part-2 compliance?

Bidders must submit GST, PAN, experience certificates, financials, EMD ₹37,000, OEM authorization, BIS IS 1391 Part-2 certification, and installation proof. Ensure copper coil and 5-year compressor warranty, plus two annual PM visits. Include service escalation matrix and in-state service center proof.

What documents are required for JK Tourism split AC procurement in 2025?

Required documents include GST certificate, PAN, 2-3 years financials, experience certificates for similar AC projects, EMD proof of ₹37,000, OEM authorization, BIS IS 1391 Part-2, installation proof, and a service center establishment plan in Jammu & Kashmir.

What are the technical specifications for BIS certified wall mount AC units?

Units must be BIS IS 1391 Part-2 compliant, support hot and cold functionality, contain copper condenser coils, and come with a compressor warranty of at least 5 years. OEM authorization and new packaging are mandatory, with free standard installation and testing.

When is delivery required for the JK AC tender with option quantities?

Delivery is as per original delivery order, with option quantities up to 25% at contracted rates. If extended, the extra time uses a formula (additional quantity/original quantity)×original delivery period, minimum 30 days, and may extend to the original delivery period.

What is the warranty and maintenance expectation for AC units?

Compressor warranty must be at least 5 years. Bid includes two free preventive maintenance visits per year. OEM must provide maintenance support; service centers must be functional in-state, with escalation matrices available.

What validation is required for service centers in Jammu & Kashmir?

Bidder must have a functional in-state service center; if absent at bidding, establish one within 30 days of award and provide documentary evidence for payment release tied to center establishment.

What are the installation commitments included in the bid?

Free standard installation, testing and commissioning are mandatory. The bidder must provide an installation proof and ensure site readiness, with a dedicated toll-free service line for post-install support.