Layer 2 Access Switch (V2)
Central Railway
MUMBAI, MAHARASHTRA
Bid Publish Date
23-Nov-2025, 4:38 pm
Bid End Date
08-Dec-2025, 5:00 pm
Location
Progress
Quantity
55
Category
Layer 2 Access Switch (V2)
Bid Type
Two Packet Bid
Centre For Development Of Advanced Computing (CDAC), under the Department Of Electronics And Information Technology, invites bids for a Layer 2 Access Switch (V2) with on-site OEM warranty, redundant power supply from day one, and multi-gigabit support. The scope covers supply, installation, testing and commissioning of the goods. The bid requires a data sheet upload and OEM authorization, with service center presence in the consignee state or establishment within 30 days of award. The award includes possible quantity variations up to 25% and adherence to all ATC terms. Location and exact estimated value are not disclosed in the available data.
Layer 2 Access Switch (V2) with on-site OEM warranty
Minimum requirement: Redundant power supply from day one
Multi-Gigabit support with a specified number of 1G copper ports (exact quantity not provided)
On-site warranty for the deployed equipment (5 years mentioned in terms)
Data Sheet must be uploaded and match offered product specifications
OEM authorization required for non-manufacturer bidders
Dedicated service centers in consignee state or establishment within 30 days
Qty variation up to 25% at both order placement and during currency, at contracted rates
Data Sheet matching and OEM authorization mandatory for bid validity
5-year warranty from final acceptance; on-site if applicable
Functional service center availability in state of consignee or proof of establishment within 30 days
Delivery, installation, testing and commissioning included in scope
Payment terms not explicitly disclosed; vendors should verify ATC for supplier-friendly terms and ensure compliance with delivery and acceptance milestones
Delivery period linked to original order; option clause allows quantity adjustments with prorated time extension and minimum 30 days
Penalties and LD terms not detailed in provided data; bidders should consult ATC document for LD percentages and timelines
Experience in supplying and deploying Layer 2 network switches or similar networking equipment
Demonstrated OEM authorization or official distributor status with OEM details
Ability to establish or show existing service centers within the State of the consignee within 30 days
Central Railway
MUMBAI, MAHARASHTRA
West Central Railway
KOTA, RAJASTHAN
Southern Railway
East Coast Railway
VISAKHAPATNAM, ANDHRA PRADESH
Nhpc Limited
JALPAIGURI, WEST BENGAL
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Specification | Type of Switch | Managed |
| Specification | Technology | PoE, PoE+ |
| Specification | Number of 1G Copper Ports | 48 |
| Specification | Multi-Gigabit Support | No |
| Specification | Redundant Power supply ( from day one) | Available |
| Specification | On Site OEM Warranty | 5 Year |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar Layer 2 switch deployments
Financial statements / turnover evidence
EMD document (not disclosed in tender data, bidders should confirm)
Data Sheet of the offered switch
Manufacturer Authorization on OEM letterhead with complete contact details
Proof of Functional Service Centre or plan to establish within 30 days of award
Certificates/ATCs as specified in bid document
Key insights about KERALA tender market
Bidders should submit Data Sheet, Manufacturer Authorization, GST, PAN, and financials, plus proof of OEM support. Ensure 5-year on-site warranty and redundant power supply are clearly specified. Complete installation, testing and commissioning are included; comply with option clause for quantity adjustments up to 25%.
Required documents include GST registration, PAN, data sheet of offered switch, OEM authorization, experience certificates for similar deployments, financial statements, and proof of functional service center or plan to establish within 30 days of award.
The switch must provide Layer 2 functionality with multi-gigabit support, include a dual on-site power supply from day one, and offer a 5-year warranty from final acceptance. Upload a data sheet that matches offered features and ensure 1G copper ports quantity is specified.
Bidders must provide a 5-year warranty from the date of final acceptance. On-site warranty arrangements apply where applicable, and service centers must be established or verified within 30 days of award.
The purchaser may increase/decrease quantity by up to 25% at contract placement and during currency. Delivery time adjusts proportionally using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidder or OEM must have a dedicated toll-free support line and an Escalation Matrix. Functional service centers must exist in the consignee state or be established within 30 days; payment is contingent on submitting evidence of the center's operation.
Submit the Data Sheet that exactly matches the offered switch specifications and include Manufacturer Authorization with complete contact details (name, designation, address, email, phone). Data Sheet mismatch may lead to rejection per bid conditions.
Northern Railway
📍 MORADABAD, UTTAR PRADESH
Armoured Vehicles Nigam Limited
📍 JABALPUR, MADHYA PRADESH
Bihar State Police - A Voyage Of Excellence
📍 PATNA, BIHAR
Access all tender documents at no cost
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS