New DG Set 750 KVA,XLPE cable,Excavation,Return Filling,Removing Excavated Material,Dry Sand,Precas
Indian Army
RAIGAD, MAHARASHTRA
Progress
RAQuantity
242
Category
M and L for shifting of 250 KVA DG set
Bid Type
Two Packet Bid
A tender has been published for Indian Army M and L for shifting of 250 KVA DG set, M and L earthing complete as per electrical plate No 3, DG Set foundation, Disconnecting of fuel tank, Supply Laying Jointing testing and commissioning LT under ground cable, Excavation in trenches, Returning filling in including spreading, Removing of excavated material, M and L Sand cushioning to PVC under, Supply and fixing galvanized steel tubing light, M and L Bricks for protection, M and L for boring of existing road in JAIPUR, RAJASTHAN. Quantity: 242 by. Submission Deadline: 08-07-2025 11: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
M and L for shifting of 250 KVA DG set , M and L earthing complete as per electrical plate No 3 , DG Set foundation , Disconnecting of fuel tank , Supply Laying Jointing testing and commissioning LT under ground cable , Excavation in trenches , Returning filling in including spreading , Removing of excavated material , M and L Sand cushioning to PVC under , Supply and fixing galvanized steel tubing light , M and L Bricks for protection , M and L for boring of existing road
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
RAIGAD, MAHARASHTRA
Indian Army
Indian Army
Aligarh Muslim University (amu)
ALIGARH, UTTAR PRADESH
Bharat Sanchar Nigam Limited (Govt of India Enterprise)
SANGAREDDY, TELANGANA
Tender Results
Loading results...
M and L for shifting of 250 KVA DG set
Details oblique description of work held in Specification with general condition
M and L earthing complete as per electrical plate No 3
Details oblique description of work held in Specification with general condition
DG Set foundation
Details oblique description of work held in Specification with general condition
Disconnecting of fuel tank
Details oblique description of work held in Specification with general condition
Supply Laying Jointing testing and commissioning LT under ground cable
Details oblique description of work held in Specification with general condition
Excavation in trenches
Details oblique description of work held in Specification with general condition
Returning filling in including spreading
Details oblique description of work held in Specification with general condition
Removing of excavated material
Details oblique description of work held in Specification with general condition
M and L Sand cushioning to PVC under
Details oblique description of work held in Specification with general condition
Supply and fixing galvanized steel tubing light
Details oblique description of work held in Specification with general condition
M and L Bricks for protection
Details oblique description of work held in Specification with general condition
M and L for boring of existing road
Details oblique description of work held in Specification with general condition
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | M and L for shifting of 250 KVA DG set | Details oblique description of work held in Specification with general condition | 2 | each | [email protected] | 30 | |
| 2 | M and L earthing complete as per electrical plate No 3 | Details oblique description of work held in Specification with general condition | 12 | each | [email protected] | 30 | |
| 3 | DG Set foundation | Details oblique description of work held in Specification with general condition | 1 | each | [email protected] | 30 | |
| 4 | Disconnecting of fuel tank | Details oblique description of work held in Specification with general condition | 2 | each | [email protected] | 30 | |
| 5 | Supply Laying Jointing testing and commissioning LT under ground cable | Details oblique description of work held in Specification with general condition | 130 | rm | [email protected] | 30 | |
| 6 | Excavation in trenches | Details oblique description of work held in Specification with general condition | 30 | cum | [email protected] | 30 | |
| 7 | Returning filling in including spreading | Details oblique description of work held in Specification with general condition | 20 | cum | [email protected] | 30 | |
| 8 | Removing of excavated material | Details oblique description of work held in Specification with general condition | 10 | cum | [email protected] | 30 | |
| 9 | M and L Sand cushioning to PVC under | Details oblique description of work held in Specification with general condition | 10 | cum | [email protected] | 30 | |
| 10 | Supply and fixing galvanized steel tubing light | Details oblique description of work held in Specification with general condition | 12 | rm | [email protected] | 30 | |
| 11 | M and L Bricks for protection | Details oblique description of work held in Specification with general condition | 1 | per 1000 | [email protected] | 30 | |
| 12 | M and L for boring of existing road | Details oblique description of work held in Specification with general condition | 12 | rm | [email protected] | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
11-Jul-2025, 8:00 pm
End
12-Jul-2025, 8:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Komal Trading Company Under PMA | - | 07-07-2025 17:15:51 | |
| 2 | NEXT STEP LIGHTS INDIA PRIVATE LIMITED Under PMA | - | 05-07-2025 22:18:07 | |
| 3 | RACHNA ENTERPRISES Under PMA | - | 05-07-2025 07:37:49 | |
| 4 | swati enterprises Under PMA | - | 05-07-2025 09:01:24 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Komal Trading Company(MII) Under PMA | Item Categories : M and L for shifting of 250 KVA DG set,M and L earthing complete as per electrical plate No 3,DG Se | |
| L2 | RACHNA ENTERPRISES (MSE,MII)( MSE Social Category:ST ) Under PMA | Item Categories : M and L for shifting of 250 KVA DG set,M and L earthing complete as per electrical plate No 3,DG Se | |
| L3 | swati enterprises (MSE,MII)( MSE Social Category:ST ) Under PMA | Item Categories : M and L for shifting of 250 KVA DG set,M and L earthing complete as per electrical plate No 3,DG Se |
Key insights about RAJASTHAN tender market
The eligibility requirements for participation include the need for bidders to be registered entities with demonstrated capacity in executing similar projects. They should fulfill the specified technical and financial criteria outlined in the tender documentation to ensure compliance and capability to complete the work.
Participants must possess appropriate certificates, including technical compliance certifications and possibly ISO certifications related to quality management. Financial documentation showing past project experience will also be necessary.
The registration process involves registering as a bidder through the designated tender platform. Bidders must provide necessary details regarding their business, including compliance documents and financial records as outlined in the tender instructions.
Accepted document formats for submission typically include PDF and Word documents as detailed in the tender guidelines. Bidders should ensure that all documents are properly formatted and meet submission requirements to facilitate a smooth evaluation process.
The financial proposals will be assessed based on overall cost competitiveness, alignment with budget expectations, and adherence to local regulations regarding pricing. The evaluation will primarily consider the most advantageous bid for the government while maintaining quality expectations.
Indian Army
📍 DARJEELING, WEST BENGAL
Indian Army
📍 CHANDIGARH, CHANDIGARH
Indian Army
📍 CHANDIGARH, CHANDIGARH
Directorate General Of Lighthouses And Lightships
HLL Lifecare Limited
📍 GHAZIABAD, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS