TIMING DEVICE PISTON,CROSS DISC,DRIVE SHAFT,SERVICE KIT,SEAL OIL ROTARY PUMP
Indian Army
LEH, JAMMU & KASHMIR
Bid Publish Date
31-Oct-2025, 8:16 pm
Bid End Date
10-Nov-2025, 9:00 pm
Location
Progress
Quantity
9
Category
DIFFERENTIAL GEAR KIT
Bid Type
Single Packet Bid
The Indian Army, Department Of Military Affairs, seeks supply of differential gear kit, synchronising cone, carbon lining variants, distributor head, oil seal, vane pump, solenoid switch, shaft drive and timing device piston for delivery in Lalitpur, Uttar Pradesh. The procurement encompasses 9 BOQ items with unspecified quantities, and an estimated value not disclosed. Special terms include an option to increase or decrease quantity by up to 25% during contract and extended periods, with delivery calculations anchored to the original order. An advance approval process for samples is required within 5 days of contract award, with revisions possible if the sample deviates from contract specs. This purchase emphasizes conformity to buyer-approved samples and the potential for revised delivery timelines if buyer approval is delayed. Unique clauses reflect project-wide quantity flexibility and a structured sample-based start to bulk manufacture.
Differential gear kit and related components as listed in BOQ
Advance sample submission within 5 days; approval or modification per buyer
Quantity flexibility up to 25% during and after contract
Delivery period adjustments based on original schedule with minimum 30 days
Bulk manufacturing post-sample approval with no LD if delay caused by buyer
9 items in BOQ with unspecified quantities and units
Option to modify order quantity by up to 25% during contract
Advance sample approval required within 5 days post-award
Delivery period may be adjusted if there is buyer approval delay
Not specified; bidders should anticipate standard government terms and potential milestone-based payments
Delivery starts after contract award and original delivery order; option quantity extensions apply with 30+ days minimum
Not explicitly defined; contract likely includes LD based on delivery delays and non-conformance per buyer terms
Experience in supplying mechanical components to government/armed forces
Ability to provide OEM authorizations for gear and pump components
Financial stability demonstrated by annual turnover and financial statements
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
KATHUA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | DIFFERENTIAL GEAR KIT | DIFFERENTIAL GEAR KIT | 1 | pieces | rajeshwar1985 | 15 |
| 2 | SYNCHRONISING CONE | SYNCHRONISING CONE | 1 | pieces | rajeshwar1985 | 15 |
| 3 | SYNCHRORING 1or2or3 CARBON LINING | SYNCHRORING 1or2or3 CARBON LINING | 1 | pieces | rajeshwar1985 | 15 |
| 4 | DISTRIBUTOR HEAD | DISTRIBUTOR HEAD | 1 | pieces | rajeshwar1985 | 15 |
| 5 | OIL SEAL | OIL SEAL | 1 | pieces | rajeshwar1985 | 15 |
| 6 | VANE PUMP | VANE PUMP | 1 | pieces | rajeshwar1985 | 15 |
| 7 | SOLENOID SWITCH | SOLENOID SWITCH | 1 | pieces | rajeshwar1985 | 15 |
| 8 | SHAFT DRIVE | SHAFT DRIVE | 1 | pieces | rajeshwar1985 | 15 |
| 9 | TIMING DEVICE PISTON | TIMING DEVICE PISTON | 1 | pieces | rajeshwar1985 | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar supply
Financial statements (last 2-3 years)
EMD/security deposit document
Technical bid documents showing product categories
OEM authorization letter (if bidding on OEM products)
Any required compliance certificates for mechanical components
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M/S KARTIK SALES CORPORATION(MSE)( MSE Social Category:General ) Under PMA | ₹34,381 | Item Categories : DIFFERENTIAL GEAR KIT,SYNCHRONISING CONE,SYNCHRORING 1or2or3 CARBON LINING,DISTRIBUTOR HEAD,OIL SEA |
| L2 | M/S M. K. ENTERPRISES Under PMA | ₹35,201 | Item Categories : DIFFERENTIAL GEAR KIT,SYNCHRONISING CONE,SYNCHRORING 1or2or3 CARBON LINING,DISTRIBUTOR HEAD,OIL SEA |
| L3 | PITAMBRA TRADERS (MSE)( MSE Social Category:General ) Under PMA | ₹35,991 | Item Categories : DIFFERENTIAL GEAR KIT,SYNCHRONISING CONE,SYNCHRORING 1or2or3 CARBON LINING,DISTRIBUTOR HEAD,OIL SEA |
Key insights about UTTAR PRADESH tender market
Bidders should prepare GST and PAN, experience proofs for similar gear components, financial statements, EMD documents, OEM authorizations if required, and technical bids detailing the differential kit, synchronising cones, carbon lining variants, and other items. Ensure sample submission within 5 days of award and readiness to modify per buyer approvals.
Submit GST certificate, PAN, 2-3 years of financials, experience certificates for similar mechanical components, EMD deposit proof, OEM authorization letter (if OEM products), and technical compliance documents showing product categories including differential gear kit and vane pump.
Delivery can scale by up to 25% of bid quantity during contract and currency periods. Delivery starts from the last date of the original delivery order, with the option to extend time using a defined formula, minimum 30 days, and possible extensions for extended periods.
Within 5 days of award, submit one advance sample. The buyer will approve or specify modifications within 5 days. If delayed, the delivery period may be refixed without LD for the delay period; major deviations may trigger fresh samples or contract termination.
No explicit brand requirements are stated; bidders must rely on OEM authorizations when applicable and ensure conformity to the buyer-approved sample framework and contract specifications.
Specific standards are not listed in the data. Prepare to demonstrate compliance with the contract’s sample approval framework, and include any applicable mechanical component certifications and quality assurances per bidder’s technical bid.
If the buyer delays approval, the delivery period is refixed according to the extended time rules, with no liquidated damages for the period of delay, and bulk supply proceeds per approved sample once provided.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS