Extension Cord,Cycle Pressure Pump,First Aid Box,Notice Board size 3 x 2 ft,Water Bottle,Garden Khu
Indian Army
HISAR, HARYANA
Bid Publish Date
19-Feb-2026, 11:46 am
Bid End Date
02-Mar-2026, 12:00 pm
Location
Progress
Quantity
348
Category
Heating Box
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids under the Government E-Market (GEM) portal for a broad mix of 22 items spanning heating boxes, satchels for RCP, tea thermoses, flexible wires (1.5 mm), bed switches, extension cords, PVC piping, red flags, DTL pipes/elbows, head torches, dashboard cameras, bed sheets, digital weighing machines, double beds blankets, hair cutting machines/dryers, mitton/beetal telephone sets, and harnesses. The scope covers Supply, Installation, Testing and Commissioning (SITC) of goods. The estimated value and EMD are not disclosed. Core tender attributes include a mandatory option clause allowing up to 25% quantity increase/decrease at contracted rates and a delivery framework starting from the original order’s last delivery date. This setup emphasizes scalable procurement with flexible timelines while maintaining formal SITC responsibilities.
Product/service names: heating box, satchel for RCP, tea thermos, flexible 1.5 mm wire, bed switch, extension cord, plastic pipe (DTL PVC), red flag 3x2, DTL pipe 10 inch, DTL elbow 4 inch, head torch, dashboard camera, bed sheet, digital weighing machine, double bed blanket, hair cutting machine, hair dryer, mitton, Beetal telephone set, harness
Quantities: 22 items in BOQ; exact quantities not specified in data
Estimated value: Not disclosed in tender data
Delivery: SITC scope; delivery period governed by option clause and original order last delivery date
Standards/quality: Not explicitly specified; bidders should confirm compliance requirements during bid submission
Delivery terms: 30+ day minimum extension, formula-based calculation for increased time
25% quantity variation clause at contract rates
Supply, Installation, Testing and Commissioning (SITC) included in scope
Formula-based delivery extensions with minimum 30 days
Not disclosed; bidder must confirm payment terms with GEM portal guidelines and Department of Military Affairs policies
Delivery window tied to original last delivery date; option-driven extensions calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified; bidders should seek clarity on LDs or performance bonds during bid submission
Demonstrated SITC experience for government/military-grade equipment
Financial capacity to absorb SITC costs and potential 25% quantity variation
Ability to deliver 22-item mixed-category procurement with installation and commissioning
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
HISAR, HARYANA
Indian Army
SOLAN, HIMACHAL PRADESH
Indian Army
AMBALA, HARYANA
Indian Army
RAJAURI, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Heating Box | Heating Box | 2 | pieces | tomar@15fdregt | 15 |
| 2 | Satchel for RCP | Satchel for RCP | 4 | pieces | tomar@15fdregt | 15 |
| 3 | Tea Thermos | Tea Thermos | 2 | pieces | tomar@15fdregt | 15 |
| 4 | Flexible Wire | Flexible Wire | 4 | roll | tomar@15fdregt | 15 |
| 5 | 1.5 mm Wire | 1.5 mm Wire | 8 | roll | tomar@15fdregt | 15 |
| 6 | Bed Switch | Bed Switch | 78 | pieces | tomar@15fdregt | 15 |
| 7 | Holder | Holder | 60 | pieces | tomar@15fdregt | 15 |
| 8 | Extension Cord | Extension Cord | 6 | pieces | tomar@15fdregt | 15 |
| 9 | Plastic Pipe | Plastic Pipe | 80 | pieces | tomar@15fdregt | 15 |
| 10 | Red Flag 3x2 | Red Flag 3x2 | 30 | pieces | tomar@15fdregt | 15 |
| 11 | DTL Pipe 10 inch PVC | DTL Pipe 10 inch PVC | 16 | pieces | tomar@15fdregt | 15 |
| 12 | DTL Elbow 4 inch | DTL Elbow 4 inch | 12 | pieces | tomar@15fdregt | 15 |
| 13 | Head Torch | Head Torch | 6 | pieces | tomar@15fdregt | 15 |
| 14 | Dash Board Camera | Dash Board Camera | 10 | pieces | tomar@15fdregt | 15 |
| 15 | Bed Sheet | Bed Sheet | 6 | pieces | tomar@15fdregt | 15 |
| 16 | Digital Weighing Machine | Digital Weighing Machine | 1 | pieces | tomar@15fdregt | 15 |
| 17 | Blanket Double Bed | Blanket Double Bed | 1 | pieces | tomar@15fdregt | 15 |
| 18 | Hair Cutting Machine | Hair Cutting Machine | 2 | pieces | tomar@15fdregt | 15 |
| 19 | Hair Dryer | Hair Dryer | 1 | pieces | tomar@15fdregt | 15 |
| 20 | Mitton | Mitton | 4 | pair | tomar@15fdregt | 15 |
| 21 | Beetal Telephone Set | Beetal Telephone Set | 10 | pieces | tomar@15fdregt | 15 |
| 22 | Harnes | Harnes | 5 | pieces | tomar@15fdregt | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent account number (PAN) card
Experience certificates for similar SITC projects
Financial statements / turnover evidence
EMD deposit proof (amount not specified; confirm in tender)
Technical bid documents demonstrating SITC capability
OEM authorization letters (where applicable for specific items)
Any bid-specific forms or declarations required by GEM portal
Key insights about UTTARAKHAND tender market
Bidders must register on the GEM portal, upload GST, PAN, experience certificates and financials, submit OEM authorizations where required, and provide SITC capability. Ensure compliance with the 25% quantity variation clause and confirm delivery extensions as per original order timelines.
Submit GST certificate, PAN card, experience certificates for SITC, financial statements, EMD proof, technical bid, OEM authorizations, and any bid-specific declarations. Ensure all documents align with the Terms and Conditions and are uploaded on the GEM portal during bid submission.
Delivery is SITC-focused with extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. The Purchaser may extend the delivery duration to accommodate up to 25% quantity changes at contracted rates.
The Purchaser may modify order quantity by up to 25% at contracted rates at the time of contract placement and during contract currency, with extensions governed by the defined formula and minimum 30-day extension threshold.
Explicit standards are not listed in the data; bidders should confirm ISI/ISO or military-grade certifications during submission and provide OEM authorizations for specific items where applicable.
Date not specified in the extracted data; bidders must monitor GEM portal for submission deadlines and ensure all 22 item SITC documentation, including installation and commissioning plans, is ready for upload.
Scope includes Supply, Installation, Testing and Commissioning (SITC) of all 22 listed items; the bid must cover all costs associated with SITC within the quoted contract rates; verify exact list with the tender pack.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS