TenderDekho Logo
Closed GEM

Jammu & Kashmir State Power Development Corporation Digital Multimeter & Layer 2 Access Switch Tender Udhampur 2026 – IS/Standard & OEM Warranty

Bid Publish Date

24-Feb-2026, 4:47 pm

Bid End Date

14-Mar-2026, 5:00 pm

Generate Docs

Progress

Issue24-Feb-2026, 4:47 pm
Corrigendum11-Mar-2026
AwardPending

Tender Overview

Organization: Jammu and Kashmir State Power Development Corporation, under the Power Development Department, invites bids for Digital Multimeter and Layer 2 Access Switch (V2) in UDHAMPUR, JAMMU & KASHMIR. The procurement targets precise measurement instruments and network switch hardware, with a potentially variable quantity up to 25% and a mixed delivery window starting from the original delivery order. The tender emphasizes on-site OEM warranty and equipment capable of multi-gigabit performance, with a focus on reliability in power infrastructure projects. The lack of BOQ items suggests a scoped, specification-driven purchase rather than a fixed list of SKUs. This opportunity requires bidders to align with the option clause and delivery flexibility embedded in the contract terms.

Key Specifications

  • Digital Multimeter with DC/AC voltage and current ranges and resolutions as listed

  • Layer 2 Access Switch with Number of 1G Copper Ports, Multi-Gigabit Support, and Redundant Power supply from day one

  • On Site OEM Warranty and standard safety rating

  • Continuity test and Diode test functionality

  • Display type and count (Digits) for meters

  • Temperature measurement capabilities and accuracy

  • Capacitance and frequency measurement capabilities with specified ranges

Terms & Conditions

  • Option clause allows up to 25% quantity variation and corresponding delivery extension

  • On-site OEM warranty is expected; delivery timing follows original and extended periods

  • EMD and payment terms require explicit disclosure during bid submission

Important Clauses

Payment Terms

Payment terms are not specified in the available data; bidders must seek confirmation during bid clarifications and ensure alignment with contract standards.

Delivery Schedule

Delivery quantity may be increased/decreased up to 25% at contract placement and during currency; additional time calculated as (increased quantity/original quantity) × original delivery period with a minimum 30 days.

Penalties/Liquidated Damages

Penalties or LD provisions are not explicitly detailed in the provided terms; bidders should verify during final tender documentation and ensure compliance with delivery obligations.

Bidder Eligibility

  • Proven experience in supplying Digital Multimeters or Layer 2 Switches to government entities

  • Valid GST registration and PAN card

  • OEM authorization for the specified equipment and compliance with safety standards

Tender Data

Bid Details

Quantity

2

Category

Digital Multimeter

Bid Type

Single Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Requirements

Past Performance

60 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Digital Multimeter (Q3) , Layer 2 Access Switch (V2) (Q2)

Authority Records

POWER DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9039099.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Corrigendum Updates

1 Update
#1

Update

11-Mar-2026

Extended Deadline

14-Mar-2026, 11:30 am

Opening Date

14-Mar-2026, 12:00 pm

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar Digital Multimeter or Layer 2 Switch deployments

4

Financial statements (audited if available)

5

EMD submission proof (amount not disclosed in tender text)

6

Technical bid documents demonstrating compliance with stated measurements and features

7

OEM authorization letters for the specified equipment

8

Quality/certification documents relevant to safety and compliance

Technical Specifications 2 Items

Item #1 Details

View Catalog
Category Specification Requirement
MEASUREMENTS DC Voltage Range 600.0
MEASUREMENTS DC Voltage Accuracy 0.5
MEASUREMENTS DC Voltage resolution 0.1
MEASUREMENTS AC Voltage Range 600.0
MEASUREMENTS AC Voltage Accuracy 1.0
MEASUREMENTS AC Voltage resolution 0.001
MEASUREMENTS DC Current Range 10.0
MEASUREMENTS DC Current Accuracy 1.0
MEASUREMENTS DC Current resolution 0.001
MEASUREMENTS AC Current Range 10.0
MEASUREMENTS AC Current Accuracy 1.5
MEASUREMENTS AC Current resolution 0.001
MEASUREMENTS Resistance Range 40.0
MEASUREMENTS Resistance Accuracy 1.0
MEASUREMENTS Resistance resolution 0.1
MEASUREMENTS Capacitance Range ( Micro farad ) .01 to 1000
MEASUREMENTS Capacitance Accuracy ( % ) 2.5
MEASUREMENTS Capacitance resolution ( nF ) 1
MEASUREMENTS Frequency Range ( KHz ) 50
MEASUREMENTS Frequency Accuracy ( % ) 0.1
MEASUREMENTS Frequency resolution ( Hz ) 0.01
MEASUREMENTS Temperature Range ( Degree C ) NA
MEASUREMENTS Temperature Accuracy ( % ) NA
MEASUREMENTS Temperature resolution ( Degree C ) NA
FEATURES Type Hand Held
FEATURES Display (Digits) 3.5
FEATURES Measurement Type True RMS
FEATURES Counts 6000, 50000, 10000, 20000, 30000, 40000, 60000, 70000, 80000, 90000, 100000, 200000, 20000000 Or higher
OTHER FEATURES Continuity test and Diode test Available
SAFETY Safety Rating Category III 600 V of IEC 61010.
WARRANTY Warranty 3.0

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Digital Multimeter tender in Udhampur Jammu 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD proof, and OEM authorizations. Ensure compliance with DC/AC range and resistance specifications and include on-site OEM warranty documentation. Clarify delivery terms for the option clause and confirm any required safety certifications before submission.

What documents are required for Layer 2 Switch procurement in JK?

Required documents include GST certificate, PAN, recent experience certificates for similar network devices, financial statements, OEM authorization for the Layer 2 Switch, and technical bid detailing multi-gigabit support, number of ports, and redundant power supply capabilities.

What are the technical specifications for voltage and current ranges covered?

The tender specifies DC and AC voltage range and accuracy, DC/AC current range and accuracy, as well as resolution for voltage, current, and resistance, with additional capacitance, frequency, and temperature measurement details to be provided by the bidder in the technical bid.

What is the delivery extension policy for quantity variations?

The buyer allows up to 25% quantity variation at contract placement and during currency. The additional delivery time is calculated by (increased quantity/original quantity) times the original delivery period, with a minimum of 30 days.

Are on-site OEM warranty requirements specified in the tender?

Yes, the tender requires an on-site OEM warranty for the equipment, signaling post-installation support and service terms. Bidders should attach the OEM warranty terms and service level commitments in the technical bid.

What is the expected scope for Multi-Gigabit Switch features?

The specification calls for a Layer 2 Switch with Multi-Gigabit support and a defined number of 1G copper ports, plus a redundant power supply from day one and on-site warranty. Provide exact port counts and redundancy details in the bid.

How to verify safety ratings and compliance for equipment?

Bidders must provide documentation proving safety ratings and compliance with relevant standards, including OEM certificates and any BIS/ISI or ISO certifications if applicable, and include these in the technical bid along with installation and maintenance plans.

What is the role of the option clause in delivery planning?

The option clause permits quantity adjustments up to 25% during contract execution, and delivery timelines adjust according to the calculation formula. Bidders should plan inventory, logistics, and FDP criteria to accommodate potential changes.