Bid Publish Date
11-Sep-2026, 6:14 pm
Bid End Date
22-Sep-2026, 7:00 pm
Value
₹2,34,055
Location
Progress
Northern Coalfields Limited invites bids for a bundle of cable assemblies and related components, including STOP CABLE, CLUTCH CABLE ASLY, ACCELERATOR CABLE, CUT OFF CABLE, GEAR CHANGE CABLE, SELF STARTER, ALTERNATOR, HYDRAULIC PUMP COMPLETE, and CONTROL VALVE, in Sonbhadra, Uttar Pradesh. The project shows an estimated value of ₹234,055.36 with a potential 25% quantity variation under the option clause. The scope centers on supply of multiple cable assemblies and related equipment as part of Coal India Limited procurement. The tender leverages GEM guidelines and CIL 2020 manual as the baseline terms. A key differentiator is the explicit quantity variation right during contract execution, enabling flexibility to adjust demand while maintaining contracted rates.
Product category: electrical cable assemblies and related components
Estimated contract value: ₹234,055.36
Quantity variation: ±25% during contract period
Delivery terms aligned to original delivery order date with extension as per option clause
Compliance: GEM guidelines and Coal India Limited Purchase Manual 2020
No explicit standards or brand specifications provided in tender data
Option clause allows ±25% quantity variation and corresponding delivery adjustments
Delivery schedule based on last date of original order; extended period rules apply
All bidders must upload required certificates under ATC to avoid rejection
Not specified in data; bidders must refer to GEM guidelines and ATC for payment terms
Delivery commences from last date of original delivery order; option-driven extensions apply with minimum 30 days if increased quantity
Not specified in data; refer to GEM guidelines and CIL Purchase Manual for LD provisions
Eligibility aligned with GEM guidelines and CIL Purchase Manual 2020
Evidence of financial stability and prior experience in similar cable assemblies supply
Submission of all required documents as per ATC and tender terms
Quantity
10
Category
STOP CABLE
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
STOP CABLE , CLUTCH CABLE ASSLY. , ACCELERATOR CABLE ASSY , CUT OFF CABLE , GEAR CHANGE CABLE , SELF STARTER , ALTERNATOR , HYDRAULIC PUMP COMPLETE , CONTROL VALVE
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
5
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231220
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Priyam Kumar Singh | 231220,REGIONAL STORES, KRISHNASHILA PROJECT, NCL, PO - BINA DISTT - SONEBHADRA U.P. | Sonbhadra | Uttar Pradesh | 231220 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
STOP CABLE
STOP CABLE
CLUTCH CABLE ASSLY.
CLUTCH CABLE ASSLY.
ACCELERATOR CABLE ASSY
ACCELERATOR CABLE ASSY
CUT OFF CABLE
CUT OFF CABLE
GEAR CHANGE CABLE
GEAR CHANGE CABLE
SELF STARTER
SELF STARTER
ALTERNATOR
ALTERNATOR
HYDRAULIC PUMP COMPLETE
HYDRAULIC PUMP COMPLETE
CONTROL VALVE
CONTROL VALVE
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | STOP CABLE | STOP CABLE | 1 | pieces | ksl_mm | 90 | |
| 2 | CLUTCH CABLE ASSLY. | CLUTCH CABLE ASSLY. | 1 | pieces | ksl_mm | 90 | |
| 3 | ACCELERATOR CABLE ASSY | ACCELERATOR CABLE ASSY | 1 | pieces | ksl_mm | 90 | |
| 4 | CUT OFF CABLE | CUT OFF CABLE | 1 | pieces | ksl_mm | 90 | |
| 5 | GEAR CHANGE CABLE | GEAR CHANGE CABLE | 2 | pieces | ksl_mm | 90 | |
| 6 | SELF STARTER | SELF STARTER | 1 | pieces | ksl_mm | 90 | |
| 7 | ALTERNATOR | ALTERNATOR | 1 | pieces | ksl_mm | 90 | |
| 8 | HYDRAULIC PUMP COMPLETE | HYDRAULIC PUMP COMPLETE | 1 | pieces | ksl_mm | 90 | |
| 9 | CONTROL VALVE | CONTROL VALVE | 1 | pieces | ksl_mm | 90 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply contracts
Financial statements or bank statements showing financial stability
EMD/Security deposit document (as applicable per GEM guidelines)
Technical bid document or technical compliance certificates (if available)
OEM authorization or dealership/agency certificates (if required by ATC)
Any certificates uploaded per Buyer Added Terms and Conditions (ATC)
Key insights about UTTAR PRADESH tender market
Bidders must register with GEM, upload all ATC-required certificates, and submit a technical bid for the 9-item cable bundle. Ensure adherence to CIL Purchase Manual 2020, and provide evidence of prior similar supply experience and financial stability. The bid also allows a ±25% quantity variation with corresponding delivery implications.
Required documents include GST registration, PAN, experience certificates for similar supplies, financial statements, EMD/Security deposit as applicable, technical compliance certificates, and OEM authorizations if required by ATC. Upload all certificates to avoid rejection per ATC clauses.
Estimated value is ₹234,055.36. Bidders should anticipate a ±25% quantity variation during contract execution, with delivery time adjustments calculated as specified in the option clause, minimum 30 days for increased quantity, and extension rules tied to original delivery period.
Delivery starts after the last date of the original delivery order, with potential extensions under the option clause. If quantity increases, additional time is computed as (Increased quantity ÷ Original quantity) × Original delivery period, subject to a minimum 30 days.
No explicit standards or OEM brands are listed in the data provided. Bidders should monitor ATC for any added standards in the final tender documents and ensure compliance with GEM guidelines and CIL Purchase Manual 2020.
Bid submissions should include GST registration, PAN, and relevant certifications as per ATC. Ensure certified copies of experience in cable assemblies and any required OEM authorizations are provided to meet eligibility and avoid rejection under the ATC.
Payment terms are governed by GEM guidelines and ATC specifics. While the data does not state exact terms, bidders should prepare for typical government norms (milestones linked to delivery and testing) and verify exact terms in the ATC section of the tender.
Assess eligibility by ensuring compliance with GEM guidelines, submitting all required documents under ATC, and showing prior experience in similar cable assemblies supply. Verify EMD requirements and delivery capability in line with the option clause and 2020 CIL guidelines.