Organization: Muzaffarpur District Panchayats, Department Of Panchayati Raj, Muzaffarpur, Bihar. Product/Service: RO plant with Genset and trolley, including warranty on spare parts and entire items. Quantity/Value: quantity adjustment up to 25% of bid/contracted quantity; no BOQ items listed. Location: Muzaffarpur district, Bihar. Context: procurement involves installation and commissioning with design drawings, subject to approval. Differentiator: option clause enabling bid quantity variation during contract lifecycle; emphasis on detailed design drawings approved before fabrication.
Product category: RO plant with Genset and trolley
Warranty: on spare parts and on whole items
Delivery period: baseline, with option-based extension using formula (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Pre-dispatch inspection: buyer-initiated, charges borne by buyer or external agency
Submission of Detailed Design Drawings within 7 days of award; approval or modification required within 7 days
25% quantity variation right during contract placement and currency
7-day window for submission and 7-day for Buyer’s approval or modification list
Pre-dispatch inspection conducted at Seller premises; costs borne by Buyer
Not explicitly stated; inspection charges and external testing fees are borne by Buyer; delivery extensions possible without LD during drawings approval periods
Delivery period adjusted per option clause; minimum 30 days; start from last date of original delivery order; extended period for increased quantity
Not specified in provided data; LD terms to be inferred from standard contract terms and option clause
Not under liquidation, court receivership, or bankruptcy with undertaking
Experience in supplying/installs of RO plants with electrical gensets
Financial capacity to handle contract with potential 25% quantity variation
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
110 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
OEM Avg. Turnover
10
Past Performance
80 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Muzaffarpur
Delivery Pincodes
843113
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shashi Bhushan Kumar | 843113,LADAURA,KUDHANI,MU ZAFFARPUR | Muzaffarpur | Bihar | 843113 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates demonstrating prior similar supply/installation
Financial statements and solvency undertaking
EMD/Security deposit documentation (if applicable in referenced terms)
Technical bid documents and OEM authorizations (if required)
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 12, 18, 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 1, 2, 3, 4, 5 Or higher |
Key insights about BIHAR tender market
Bidders should submit GST, PAN, experience certificates, and financials, plus OEM authorizations if required. Provide Detailed Design Drawings within 7 days of award and obtain Buyer approval within 7 days. Ensure warranty on spare parts and whole items; pre-dispatch inspection is Buyer-funded.
Required documents include GST certificate, PAN card, experience certificates for similar RO/genset projects, financial statements, EMD documentation if applicable, technical bid, and OEM authorizations. All documents must align with T&C requirements and be ready at bid submission.
Key requirements include RO plant with Genset and trolley, warranty on spare parts and whole unit, pre-dispatch inspection by Buyer, and Detailed Design Drawings submitted within 7 days of award with 7-day approval cycle.
Delivery period can extend based on the option clause up to 25% quantity changes, with a minimum extension rule of 30 days if required; delivery begins after approval of drawings and order placement date.
Specific LD terms are not stated; however, the contract allows delivery extensions for approved drawings and option-based quantity changes. Bidders should prepare for potential schedule adjustments and ensure timely drawing approvals to minimize risk.
Warranty covers both spare parts and the entire RO plant with Genset and trolley. Ensure documentation confirms coverage duration and scope, including after-sales service and replacement policy for failed components.
Buyer bears the charges for pre-dispatch inspection by Buyer/Consignee or External Inspection Agency; Seller provides in-house testing facilities free of cost; external lab charges fall under Buyer responsibility.
Successful Bidder must submit Detailed Design Drawings within 7 days of award; Buyer will approve or provide modification list within 7 days; modifications must be incorporated prior to fabrication; delays shift delivery without LD.