TenderDekho Logo
Active GEM

Procurement Opportunity: 12 U Rack,12 port NW,8 port NW,POE switch,media,patch cards,power JB,Control JB,Wifi router,6C SC O in KHORDHA, ODISHA

Bid Publish Date

24-Jul-2026, 3:58 pm

Bid End Date

14-Aug-2026, 4:00 pm

Progress

Issue24-Jul-2026, 3:58 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3360

Category

12 U Rack

Bid Type

Two Packet Bid

Categories 37

Public procurement opportunity for Bharat Petroleum Corporation Ltd 12 U Rack, 12 port NW, 8 port NW, POE switch, media, patch cards, power JB, Control JB, Wifi router, 6C SC OFC, 3C Cable, 42 U Rack, 24 port switch, PDP pannel, P10 display, Battery, battery stand, glands, UPS KVA, CAT cable in KHORDHA, ODISHA. Quantity: 3360 issued by. Submission Deadline: 14-08-2026 16: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

12 U Rack , 12 port NW , 8 port NW , POE switch , media , patch cards , power JB , Control JB , Wifi router , 6C SC OFC , 3C Cable , 42 U Rack , 24 port switch , PDP pannel , P10 display , Battery , battery stand , glands , UPS KVA , CAT cable

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Khordha

Delivery Pincodes

752057

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pankaj Kumar Verma752057,33 Industrial Estate , PO- Khurda, Pin- 752057KhordhaOdisha7520571180-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9657385.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

12 U Rack

Supply and installation of 12U Rack

1 ea Delivery: 180 days
#2

12 port NW

Supply and Installation of 12 Port Managed N/W Switch

1 ea Delivery: 180 days
#3

8 port NW

Supply and Installation of 8 Port Managed N/W Switch

3 ea Delivery: 180 days
#4

POE switch

4+2 POE Switch for power up the IP camera

2 ea Delivery: 180 days
#5

media

Supply and Installation of Gigabite Media Convertor

10 ea Delivery: 180 days
#6

patch cards

Supply and Installation of Patch Cards

90 ea Delivery: 180 days
#7

power JB

Supply and Installation of Power JB

3 ea Delivery: 180 days
#8

Control JB

Supply and installation of Control JB

3 ea Delivery: 180 days
#9

Wifi router

Supply and Installation of Long range WiFi Router

1 ea Delivery: 180 days
#10

6C SC OFC

Supply and Installation of 6C SC OFC Cable

1,250 mtr Delivery: 180 days
#11

3C Cable

Supply and Laying of 3C 2.5 Sqmm Armoured Cable

1,460 mtr Delivery: 180 days
#12

42 U Rack

Supply and installation of 42 U Rack

1 ea Delivery: 180 days
#13

24 port switch

Supply and installation of 24 Port Managed Switch

1 ea Delivery: 180 days
#14

PDP pannel

Supply and installation of PDP Pannel

1 ea Delivery: 180 days
#15

P10 display

Supply and installation of P10 Display unit with 2 feet 6Inch for Driver information purpose

4 ea Delivery: 180 days
#16

Battery

Supply and installation of SMF Battery 26 Ah

16 ea Delivery: 180 days
#17

battery stand

Supply and installation of Battery Stand and Interlinks

1 ea Delivery: 180 days
#18

glands

FLP & NON FLP Glands

1 set Delivery: 180 days
#19

UPS KVA

Supply and installation of 6KVA UPS 1 Phase In 1 Phase Out

1 ea Delivery: 180 days
#20

CAT cable

Supply and Laying of CAT 6 Cable at plant

510 mtr Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer