TenderDekho Logo
Closed GEM

Procurement Opportunity: Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables alo in KOLLAM, KERALA

Bid Publish Date

19-Mar-2026, 3:48 pm

Bid End Date

15-Apr-2026, 11:00 am

EMD

₹11,368

Value

₹5,68,390

Generate Docs

Progress

Issue19-Mar-2026, 3:48 pm
Corrigendum08-Apr-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2390

Category

Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required

Bid Type

Two Packet Bid

Categories 23

Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories, Dismantling of VLRA Power Plant including disconecting power cables with all accessories, Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required, Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required, Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required, Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available, Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available, Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available, Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge, Loading and unloading charges in KOLLAM, KERALA. Quantity: 2390. Submission Deadline: 15-04-2026 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories , Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories , Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories , Dismantling of VLRA Power Plant including disconecting power cables with all accessories , Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required , Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required , Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required , Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available , Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available , Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available , Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available , Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available , Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge , Loading and unloading charges

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENTBHARAT SANCHAR NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9131487.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories

Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories

60 nos Delivery: 90 days
#2

Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories

Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories

25 nos Delivery: 90 days
#3

Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories

Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories

2 nos Delivery: 90 days
#4

Dismantling of VLRA Power Plant including disconecting power cables with all accessories

Dismantling of VLRA Power Plant including disconecting power cables with all accessories

36 nos Delivery: 90 days
#5

Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required

Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required

35 nos Delivery: 90 days
#6

Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

20 nos Delivery: 90 days
#7

Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required

Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required

2 nos Delivery: 90 days
#8

Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required

Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required

40 nos Delivery: 90 days
#9

Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available

Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available

35 nos Delivery: 90 days
#10

Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available

Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available

5 nos Delivery: 90 days
#11

Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available

Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available

15 nos Delivery: 90 days
#12

Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

25 nos Delivery: 90 days
#13

Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required

5 nos Delivery: 90 days
#14

Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

20 nos Delivery: 90 days
#15

Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available

5 nos Delivery: 90 days
#16

Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge

Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge

2,000 km Delivery: 90 days
#17

Loading and unloading charges

Loading and unloading charges

60 nos Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

08-Apr-2026

Extended Deadline

15-Apr-2026, 11:00 am

Opening Date

15-Apr-2026, 11:30 am