Progress
The Indian Army seeks procurement of a single Modular ATV Bridge with a 35 m span under the Department of Military Affairs. Estimated value and EMD are not disclosed; however, the contract contemplates a flexible quantity model starting from 01 unit with potential up to 50% variation. The project scope centers on rapid deployment bridge systems for field mobility, with delivery timelines linked to order dates. The unique aspect is the option clause allowing quantity adjustments and staged delivery within contracted rates, ensuring tactical adaptability.
Product/service names and category: Modular ATV Bridge, 35 m span
Quantities: 01 base unit; quantity may increase up to 50% of bid quantity
Estimated value: Not disclosed
Delivery terms: commence from last date of original delivery order; extended delivery per option clause
Quality/standards: Not specified in data; bidders to confirm IS/ military bridge standards and joint systems
Warranty/AMC: Not specified
Brand/OEM: Not specified
Delivery may be increased by up to 50% at contracted rates
Delivery window extends from the last order date; minimum extension 30 days
Review of Buyer Added ATC document is essential for bid compliance
Quantity variations up to 50% of bid quantity; delivery starts from last date of original order; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
Purchaser may extend delivery period or increase quantity during contract currency at contracted rates; bidders must comply
Buyer uploaded ATC document; bidders must view and comply with terms therein
Experience in supplying modular bridge systems or military engineering heavy equipment
Ability to scale production to 50% quantity variations within contracted rates
Compliance with review of Buyer Added ATC document
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
50
OEM Avg. Turnover
50
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Provn of qty 01 x Modular ATV Bridge of 35 m span
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Pre-Bid Date
06-10-2026 09:00:00
Pre-Bid Venue
12 Engineer Regiment, Tenali TCP, Dinjan-786189
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Tinsukia
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tinsukia | Tinsukia | - | - | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates for modular bridge supply or related military engineering projects
Financial statements (last 2-3 years)
EMD/Security deposit documentation
Technical bid documents and engineering feasibility report
OEM authorizations or certifications for modular bridge systems
Any ATC document uploaded by Buyer
Key insights about ASSAM tender market
Bidders should submit GST, PAN, experience certificates, financial statements, EMD, and OEM authorizations; ensure compliance with the option clause allowing up to 50% quantity variation and the delivery calculation rules beginning from the original delivery order date.
Required documents include GST certificate, PAN card, 2-3 years of financials, prior bridge supply experience, EMD, technical bid, OEM authorization for the modular bridge system, and any ATC documents uploaded by the buyer.
Delivery begins after the last date of the original delivery order; extension time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days; quantity may increase up to 50% during contract.
The tender data does not specify standards; bidders should confirm compatibility with military load requirements and modular joint systems, and obtain OEM certifications for the bridge system.
Bidders must be capable of supplying up to 50% more than bid quantity and adapt delivery schedules accordingly, as per the option clause and extended delivery period rules.
Exact payment terms are not disclosed; bidders should await tender clarifications and ATC document; ensure readiness to negotiate payment terms post contract award and meet EMD conditions.
The Buyer Added ATC may modify or add compliance requirements; bidders must view the ATC file to ensure full adherence to all conditional clauses and submission standards.
Plan production capacity for up to 50% more units than base bid; align logistics and delivery timelines with the original order date plus extended period calculations to meet contractual delivery.