TenderDekho Logo
Active GEM

Contract Bidding Open For Dismantling,Surface dressing,Earthwork,Cement Concrete,Brick work,Cement plaster,Concrete paver blo in PUNE, MAHARASHTRA

Bid Publish Date

31-Aug-2026, 4:02 pm

Bid End Date

21-Sep-2026, 6:00 pm

Location

PUNE , MAHARASHTRA

Progress

Issue31-Aug-2026, 4:02 pm
AwardPending

Agharkar Research Institute (ari) announces a tender for Dismantling, Surface dressing, Earthwork, Cement Concrete, Brick work, Cement plaster, Concrete paver blocks, GI welded wire, Fabrication in PUNE, MAHARASHTRA. Quantity: 2448. Submission Deadline: 21-09-2026 18: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

2448

Category

Fabrication

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Dismantling , Surface dressing , Earthwork , Cement Concrete , Brick work , Cement plaster , Concrete paver blocks , GI welded wire , Fabrication

Advisory Bank

State Bank of India

ePBG Percentage

3.5%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Pune

Delivery Pincodes

411004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Hemant Neelkanth Mate411004,G.G.Agarkar RoadPuneMaharashtra41100438930-

Authority Records

MINISTRY OF SCIENCE AND TECHNOLOGYSCIENCE AND TECHNOLOGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9805674.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

Dismantling

Dismantling existing damaged wire mesh including removal from steel framework, stacking serviceable material and disposal of unserviceable material as directed by Engineer-in-Charge.

389 sqm Delivery: 30 days
#2

Surface dressing

Surface dressing of ground including removal of vegetation, rubbish, loose earth etc. complete.

678 sqm Delivery: 30 days
#3

Earthwork

Earthwork in surface excavation not exceeding 30 cm in depth including dressing, watering and compaction complete.

678 sqm Delivery: 30 days
#4

Cement Concrete

Providing and laying Plain Cement Concrete ration as 1 as to 2 as to 4

20 cum Delivery: 30 days
#5

Brick work

Brick work with common burnt clay FPS bricks class designation 7 point 5 in Cement Mortar ratio of 1 as to 6 in superstructure above plinth level complete.

4 cum Delivery: 30 days
#6

Cement plaster

12 mm thick cement plaster in Cement Mortar rotio as 1 as to 6 finished smooth and even complete.

29 sqm Delivery: 30 days
#7

Concrete paver blocks

Providing and laying factory made precast concrete paver blocks 60 mm thick of approved colour and design

260 sqm Delivery: 30 days
#8

GI welded wire

Providing and fixing GI welded wire mesh made from 1 1 gauge GI wire having 25 mm by 25 mm aperture

389 sqm Delivery: 30 days
#9

Fabrication

Fabrication repair of existing steel supporting structure

1 job Delivery: 30 days

Categories 37

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer