TenderDekho Logo
Active GEM

Invitation to Bid - Alarm System Control Panel IP Based System Supports upto 50 connections features Endpoint Provision in MUMBAI, MAHARASHTRA

Bid Publish Date

12-Aug-2026, 6:02 pm

Bid End Date

02-Sep-2026, 7:00 pm

EMD

₹59,826

Progress

Issue12-Aug-2026, 6:02 pm
AwardPending

A tender has been published for Indian Navy Alarm System Control Panel IP Based System Supports upto 50 connections features Endpoint Provision, Remote Management System, Fiber Splicing as per project requirement, Fiber and network patch cord, Fiber Junction Box, 2 Port Gigabit Unmanaged Network switch with 2 Port SFP, POE injector, Alarm Video System Sensitivity 96 plus minus 3db 1M 1W amplifier 5 W single channel D class rate power 8 ohm 5 w video 640 x 360 at 20fps, Master Station for control room 7 inch touch screen colour display embedded 1080p camera, suitable wiring for project 12 core fiber wire 3500 mtr CAT6 Cable 305mtr Power cable 195 mtr, Wire laying major portion wall to wall except 4 entry gates concrete digging portion covered upto 100 mtr, conduit of wire, Network Rack for the Network Equipment, Wooden Stand for Master Station, Network Switch and Gateway, SFP Module, Power Point with Fuse, Vandal Proof Metal Enclousure, Capping casing accessories and drilling equipment, PVC Junction Box, Wan Networking with Equipment and setup, Pole for Networking Equipment, Wireless handheld Remote, Supply installation Testing and commissioning, Supply and installation Charges in MUMBAI, MAHARASHTRA. Quantity: 12154 by. Submission Deadline: 02-09-2026 19: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

12154

Category

Alarm System Control Panel IP Based System Supports upto 50 connections features Endpoint Provision, Remote Management System

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

OEM Avg. Turnover

6

Past Performance

30 %

Warranty Period

2 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Alarm System Control Panel IP Based System Supports upto 50 connections features Endpoint Provision, Remote Management System , Fiber Splicing as per project requirement , Fiber and network patch cord , Fiber Junction Box , 2 Port Gigabit Unmanaged Network switch with 2 Port SFP , POE injector , Alarm Video System Sensitivity 96 plus minus 3db 1M 1W amplifier 5 W single channel D class rate power 8 ohm 5 w video 640 x 360 at 20fps , Master Station for control room 7 inch touch screen colour display embedded 1080p camera , suitable wiring for project 12 core fiber wire 3500 mtr CAT6 Cable 305mtr Power cable 195 mtr , Wire laying major portion wall to wall except 4 entry gates concrete digging portion covered upto 100 mtr , conduit of wire , Network Rack for the Network Equipment , Wooden Stand for Master Station , Network Switch and Gateway , SFP Module , Power Point with Fuse , Vandal Proof Metal Enclousure , Capping casing accessories and drilling equipment , PVC Junction Box , Wan Networking with Equipment and setup , Pole for Networking Equipment , Wireless handheld Remote , Supply installation Testing and commissioning , Supply and installation Charges

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

26

Pre-Bid & Qualification

Pre-Bid Date

17-08-2026 18:00:00

Pre-Bid Venue

LOGISTICS COMPLEX , INS TANAJI, TROMBAY ROAD MANKHURAD MUMBAI

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Mumbai City

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-Mumbai - CityMumbai City--145-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9636326.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Navy

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

Alarm System Control Panel IP Based System Supports upto 50 connections features Endpoint Provision, Remote Management System

Alarm System Control Panel IP Based System Supports upto 50 connections features Endpoint Provision, Remote Management System

1 nos Delivery: 45 days
#2

Fiber Splicing as per project requirement

Fiber Splicing as per project requirement

1 job Delivery: 45 days
#3

Fiber and network patch cord

Fiber and network patch cord

24 nos Delivery: 45 days
#4

Fiber Junction Box

Fiber Junction Box

12 nos Delivery: 45 days
#5

2 Port Gigabit Unmanaged Network switch with 2 Port SFP

2 Port Gigabit Unmanaged Network switch with 2 Port SFP

12 nos Delivery: 45 days
#6

POE injector

POE injector

12 nos Delivery: 45 days
#7

Alarm Video System Sensitivity 96 plus minus 3db 1M 1W amplifier 5 W single channel D class rate power 8 ohm 5 w video 640 x 360 at 20fps

Alarm Video System Sensitivity 96 plus minus 3db 1M 1W amplifier 5 W single channel D class rate power 8 ohm 5 w video 640 x 360 at 20fps

10 nos Delivery: 45 days
#8

Master Station for control room 7 inch touch screen colour display embedded 1080p camera

Master Station for control room 7 inch touch screen colour display embedded 1080p camera

2 nos Delivery: 45 days
#9

suitable wiring for project 12 core fiber wire 3500 mtr CAT6 Cable 305mtr Power cable 195 mtr

suitable wiring for project 12 core fiber wire 3500 mtr CAT6 Cable 305mtr Power cable 195 mtr

4,000 nos Delivery: 45 days
#10

Wire laying major portion wall to wall except 4 entry gates concrete digging portion covered upto 100 mtr

Wire laying major portion wall to wall except 4 entry gates concrete digging portion covered upto 100 mtr

4,000 nos Delivery: 45 days
#11

conduit of wire

conduit of wire

4,000 nos Delivery: 45 days
#12

Network Rack for the Network Equipment

Network Rack for the Network Equipment

1 nos Delivery: 45 days
#13

Wooden Stand for Master Station

Wooden Stand for Master Station

2 nos Delivery: 45 days
#14

Network Switch and Gateway

Network Switch and Gateway

3 nos Delivery: 45 days
#15

SFP Module

SFP Module

24 nos Delivery: 45 days
#16

Power Point with Fuse

Power Point with Fuse

12 nos Delivery: 45 days
#17

Vandal Proof Metal Enclousure

Vandal Proof Metal Enclousure

10 nos Delivery: 45 days
#18

Capping casing accessories and drilling equipment

Capping casing accessories and drilling equipment

1 nos Delivery: 45 days
#19

PVC Junction Box

PVC Junction Box

12 nos Delivery: 45 days
#20

Wan Networking with Equipment and setup

Wan Networking with Equipment and setup

1 nos Delivery: 45 days
#21

Pole for Networking Equipment

Pole for Networking Equipment

2 nos Delivery: 45 days
#22

Wireless handheld Remote

Wireless handheld Remote

10 nos Delivery: 45 days
#23

Supply installation Testing and commissioning

Supply installation Testing and commissioning

1 job Delivery: 45 days
#24

Supply and installation Charges

Supply and installation Charges

1 nos Delivery: 45 days

Categories 55

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer