Bid Publish Date
24-Aug-2026, 5:37 pm
Bid End Date
03-Sep-2026, 6:00 pm
Value
₹4,79,000
Location
Progress
Indian Army announces a tender for Visual Inspection, Ultrasonic pulse velocity test, rebound hammer test, Core test, reinforcement mapping, chemical test, half cell potential test, carbonation test, structure status, recommendation, Vetting in MUMBAI, MAHARASHTRA. Quantity: 134. Submission Deadline: 03-09-2026 18: 00: 00. Last date to apply is approaching fast!
Quantity
134
Category
Visual Inspection
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
30 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Visual Inspection , Ultrasonic pulse velocity test , rebound hammer test , Core test , reinforcement mapping , chemical test , half cell potential test , carbonation test , structure status , recommendation , Vetting
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
1
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Mumbai
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Mumbai | Mumbai | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Visual Inspection
Visual inspection and photography performing a visual survey of the building and recording/maping on drawing to assess extent of spelled concrete, cracked concrete, honey combing, reinfocement corrosion, delaminated concrete etc, taking photographs and videos to collect evidence of damage to structure.
Ultrasonic pulse velocity test
Ultrasonic pulse velocity test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 1 by portable ultrasonic non destructive digital test equipment including chipping out plaster at strategic locations.
rebound hammer test
Rebound hammer test in accordance with IS 516 Part-5 2018 SECTION 4 by portable rebound hamme equipment at strategic locations.
Core test
Core cutting and compression test for RCC structure in accordance with IS 516 on RCC members. 70 mm core cutting in reinforcement concrete, core filling by speialized epoxy material/micro concrete with bond coat at strategic locations.
reinforcement mapping
Reinforcement mapping test on RCC members to assess covers, spacing of bars including approximate diameter at strategic locations.
chemical test
Chemical test for RCC structure in accordance with IS 456 2000 using ready made kits and reagents. Sample collected will be from half cell/carbonation powder. (i) Determination of PH value. (ii) Determination of water soluble sulphates. (iii) Determination of water soluble chlorides contents at strategic locations.
half cell potential test
Half cell potential test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 2 half cell potential to assess the probability of corrosion of reinforcement at strategic locations.
carbonation test
Carbonation test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 3 corbonation test to measure extent of carbonation from the concrete surface at strategic locations.
structure status
To check & confirm present status of structure on basis on NDT results & visual inspection. Note Consultant should mention effect if additional load for construction of framed structure on the roof can be applied on the structure while submitting the Report.
recommendation
To provide recommendation for structrue repairs and technical specification. Preparing bill of quantities for the repair etc. All as specified and directed.
Vetting
Vetting of report from IIT/ NIT/Govt college of Engg
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Visual Inspection | Visual inspection and photography performing a visual survey of the building and recording/maping on drawing to assess extent of spelled concrete, cracked concrete, honey combing, reinfocement corrosion, delaminated concrete etc, taking photographs and videos to collect evidence of damage to structure. | 1 | nos | genwkjlbso05 | 15 | |
| 2 | Ultrasonic pulse velocity test | Ultrasonic pulse velocity test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 1 by portable ultrasonic non destructive digital test equipment including chipping out plaster at strategic locations. | 25 | nos | genwkjlbso05 | 15 | |
| 3 | rebound hammer test | Rebound hammer test in accordance with IS 516 Part-5 2018 SECTION 4 by portable rebound hamme equipment at strategic locations. | 25 | nos | genwkjlbso05 | 15 | |
| 4 | Core test | Core cutting and compression test for RCC structure in accordance with IS 516 on RCC members. 70 mm core cutting in reinforcement concrete, core filling by speialized epoxy material/micro concrete with bond coat at strategic locations. | 10 | nos | genwkjlbso05 | 15 | |
| 5 | reinforcement mapping | Reinforcement mapping test on RCC members to assess covers, spacing of bars including approximate diameter at strategic locations. | 10 | nos | genwkjlbso05 | 15 | |
| 6 | chemical test | Chemical test for RCC structure in accordance with IS 456 2000 using ready made kits and reagents. Sample collected will be from half cell/carbonation powder. (i) Determination of PH value. (ii) Determination of water soluble sulphates. (iii) Determination of water soluble chlorides contents at strategic locations. | 20 | nos | genwkjlbso05 | 15 | |
| 7 | half cell potential test | Half cell potential test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 2 half cell potential to assess the probability of corrosion of reinforcement at strategic locations. | 20 | nos | genwkjlbso05 | 15 | |
| 8 | carbonation test | Carbonation test for RCC structure in accordance with IS 516 Part-5 2018 SECTION 3 corbonation test to measure extent of carbonation from the concrete surface at strategic locations. | 20 | nos | genwkjlbso05 | 15 | |
| 9 | structure status | To check & confirm present status of structure on basis on NDT results & visual inspection. Note Consultant should mention effect if additional load for construction of framed structure on the roof can be applied on the structure while submitting the Report. | 1 | nos | genwkjlbso05 | 15 | |
| 10 | recommendation | To provide recommendation for structrue repairs and technical specification. Preparing bill of quantities for the repair etc. All as specified and directed. | 1 | nos | genwkjlbso05 | 15 | |
| 11 | Vetting | Vetting of report from IIT/ NIT/Govt college of Engg | 1 | nos | genwkjlbso05 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer