TenderDekho Logo
Active GEM

Controller General Of Defence Accounts Armature Assembly, Brake Pad, Gear Liver Kit Tender East Siang Arunachal Pradesh 2026

Bid Publish Date

30-Aug-2026, 5:54 pm

Bid End Date

10-Sep-2026, 6:00 pm

Progress

Issue30-Aug-2026, 5:54 pm
AwardPending

Tender Overview

Controller General Of Defence Accounts invites bids for the supply ofGoods spanning five item families: Armature Assembly, Brake Pad, Gear Liver Kit, Exhaust Brake Solenoid, and Assy Pull Cable in the East Siang district of Arunachal Pradesh (791102). The procurement scope specifies delivery of all listed components with a potential bid value not disclosed. Bidders should note the buyer’s right to adjust quantities by up to 50% of the bid quantity, both at contract award and during execution, with delivery timelines recalculated accordingly. The arrangement emphasizes a pure supply contract and implies compliance with defence procurement governance. The tender location and category underscore a focus on automotive/engine components suitable for defence accounts channels.

Technical Specifications & Requirements

  • Item categories: Armature Assembly, Brake Pad, Gear Liver Kit, Exhaust Brake Solenoid, Assembly Pull Cable.
  • Delivery scope: Only supply of goods (no installation or services specified).
  • Quantity flexibility: Option to increase or decrease quantity up to 50% of bid quantity at contract placement and during contract currency.
  • Delivery timing rule: Additional time formula = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days; if original period < 30 days, extended period equals the original.
  • BoQ: 5 items listed; no itemized quantities provided in the data.
  • Standards/Specifications: Not provided in the tender data; bidders should seek clarification.

Terms, Conditions & Eligibility

  • Scope of supply: Bid price to include all cost components; only supply of goods.
  • Option clause: Quantity adjustments up to 50% of bid quantity; extended delivery time rules apply.
  • Delivery & payment terms: Not explicitly defined in the data; bidders should request clarity during bid stage.
  • Emphasis: Defence procurement context; ensure compliance with CGDA-related procurement norms and any applicable BIS/ISI/ISO standards if referenced in a forthcoming amendment.
  • Documentation: Not specified here; bidders must monitor portal updates for required submissions and forms.

Key Specifications

    • Item categories: Armature Assembly, Brake Pad, Gear Liver Kit, Exhaust Brake Solenoid, Assembly Pull Cable
    • Delivery scope: Only supply of goods
    • Quantity flexibility: Up to 50% variation
    • Delivery time rule: (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
    • BoQ: 5 items; no quantities provided

Terms & Conditions

  • Option Clause allowing quantity variation up to 50%

  • Delivery period recalculation formula with minimum 30 days

  • Scope limited to supply of goods; no installation or services specified

Important Clauses

Option Clause

Purchaser may alter quantity by up to 50% at contract and during currency, with rates unchanged

Delivery Schedule

Additional time is (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days

Payment Terms

Not defined in data; bidders should seek clarification

Bidder Eligibility

  • Eligibility criteria not specified in the tender data

  • Defence procurement context implies compliance with CGDA rules

  • No explicit turnover or experience thresholds provided

Tender Data

Bid Details

Quantity

19

Category

Armature Assy

Bid Type

Two Packet Bid

Bid Validity

130 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

10 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Armature Assy , Brake Pad , Gear Liver Kit , Exhaust Brake Solenoid , Assy Pull Cable

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

East Siang

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-East SiangEast Siang--615-

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENTCONTROLLER GENERAL OF DEFENCE ACCOUNTS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9823072.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Armature Assy

Good Quality

6 nos Delivery: 10 days
#2

Brake Pad

Good Quality

5 nos Delivery: 10 days
#3

Gear Liver Kit

Good Quality

1 nos Delivery: 10 days
#4

Exhaust Brake Solenoid

Good Quality

2 nos Delivery: 10 days
#5

Assy Pull Cable

Good Quality

5 nos Delivery: 10 days

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid in the CGDA defence equipment tender in East Siang Arunachal Pradesh 2026

Bidders should monitor the official CGDA portal for release of tender documents, confirm the five item categories (Armature Assembly, Brake Pad, Gear Liver Kit, Exhaust Brake Solenoid, Assembly Pull Cable), and verify the 50% quantity variation option. Ensure readiness with GST, PAN, bid security, and OEM authorizations once terms are published.

What documents are required for the East Siang defence supply tender 2026

Prepare GST certificate, PAN card, company registration, experience certificates for similar defence components, financial statements for last 3 years, EMD security (if mandated), technical compliance statements, and any OEM authorization letters. Submission timelines will follow portal notices once the tender is live.

What are the technical specifications for Armature Assembly and Brake Pad tenders in Arunachal Pradesh

The current data lists five categories without explicit specs. Bidders should await detailed technical sheets or request clarification for Armature Assembly, Brake Pad, Gear Liver Kit, Exhaust Brake Solenoid, and Assembly Pull Cable dimensions, tolerances, materials, and performance criteria before bid submission.

When is the delivery timeline and option clause for quantity variation

Delivery timing follows the rule: additional time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period under the option clause; exact delivery dates will be defined in the award order.

What are the eligibility criteria for CGDA defence equipment supply 2026

Eligibility specifics are not disclosed in the data. Prospective bidders should ensure compliance with standard defence procurement prerequisites, including GST registration, financial stability, audit-ready accounts, and, if applicable, OEM authorizations and ISO/BIS certifications as later stipulated by CGDA amendments.

What is the scope of supply for this tender in East Siang

The scope is strictly the supply of goods only; no installation, commissioning, or after-sales service is mentioned. Bidders should plan for direct delivery of Armature Assembly, Brake Pad, Gear Liver Kit, Exhaust Brake Solenoid, and Assembly Pull Cable to the designated location.

What steps to take if quantities are increased under the 50% option clause

If quantities increase up to 50%, ensure approved revised delivery timelines, confirm unit prices remain at original bid rates, and verify updated delivery orders reflect the extended schedule. Maintain readiness to adjust logistics and warehousing to meet the new quantities.

Which location is the defence tender in Arunachal Pradesh focused on

The tender is focused on East Siang district, Arunachal Pradesh (PIN 791102). Suppliers should align logistics plans to deliver directly to this location, complying with any local import and regulatory requirements specific to defence procurement in that region.