SUPPLY OF IR Based explosion proof and weather proof Point type Hydrocarbon detectors along with al
Iocl- Srpl
Bid Publish Date
27-Oct-2025, 4:16 pm
Bid End Date
09-Dec-2025, 11:00 am
Location
Progress
RAQuantity
1
Bid Type
Two Packet Bid
The procurement is for a complete set of IR Type Gas Detectors to support the HPCL Vizag Project under Bharat Heavy Electricals Limited (BHEL), Visakhapatnam, Andhra Pradesh. The scope centers on supplying IR gas detector systems designed for hazardous environment monitoring, with inspection and acceptance coordinated through BHEL. The ATC terms mention an option clause enabling +/-25% quantity variation at contract rates, and a defined delivery timeline linked to the last delivery order date. The tender emphasizes flexible quantity handling, with delivery periods adjusted for added quantities, and requires bidder adherence to these option provisions. Unique aspects include on-site post-receipt inspection by BHEL and the potential for pre-dispatch inspection at the seller’s premises if selected by the ATC. This tender targets suppliers of certified gas detector solutions compatible with HPCL Vizag project needs.
Product: IR Type Gas Detectors complete set
Delivery location: HPCL Vizag Project, Visakhapatnam, Andhra Pradesh
Inspection: Post-receipt inspection at consignee site; possible pre-dispatch inspection at seller premises
Option clause: ±25% quantity variation at contract rates
Delivery period: Calculated extension: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Option Clause allows 25% quantity change and extended delivery with minimum 30 days
Inspection by BHEL at consignee site; pre-dispatch if ATC selects
ATC clauses must be read and complied with along with GeM terms
Not specified in data; bidders should confirm payment terms during bid submission.
Delivery period aligned to last date of original delivery order; extended period based on option clause calculations.
Not specified in data; bidders should inquire about LDs or performance bonds during procurement.
Experience in supplying/installing IR type gas detectors for large projects
Capability to comply with GTD/GeM ATC terms and regional regulatory requirements
Evidence of financial stability and GST compliance
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Iocl- Srpl
Bharat Heavy Electricals Limited (bhel)
VISAKHAPATNAM, ANDHRA PRADESH
Garden Reach Ship Builders And Engineers Limited (grse)
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Oil India Limited
Tender Results
Loading results...
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for prior gas detector supply/installation
Financial statements or turnover proof
EMD document (as applicable by buyer terms)
Technical bid submission documents
OEM authorization letters (if applicable)
Extended Deadline
09-Dec-2025, 11:00 am
Opening Date
09-Dec-2025, 11:30 am
Extended Deadline
06-Dec-2025, 11:00 am
Opening Date
06-Dec-2025, 11:30 am
Extended Deadline
29-Nov-2025, 11:00 am
Opening Date
29-Nov-2025, 11:30 am
Extended Deadline
25-Nov-2025, 11:00 am
Opening Date
25-Nov-2025, 11:30 am
Extended Deadline
17-Nov-2025, 3:00 pm
Opening Date
17-Nov-2025, 3:30 pm
Extended Deadline
10-Nov-2025, 3:00 pm
Opening Date
10-Nov-2025, 3:30 pm
Extended Deadline
08-Nov-2025, 5:00 pm
Opening Date
08-Nov-2025, 5:30 pm
Start
14-Dec-2025, 12:00 pm
End
15-Dec-2025, 12:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | LAMBDA PRIME LLP Under PMA | Make : Unbrand Model : NA Title : Supply of Gas Detectors IR Type complete set for HPCL Vizag Project | 28-11-2025 18:27:29 | Qualified |
| 2 | NEW FIRE ENGINEERS PRIVATE LIMITED Under PMA | Make : Draeger Model : Polytron 8700 with HART Title : Supply of Gas Detectors IR Type complete set for HPCL Vizag Project | 17-11-2025 12:22:39 | Qualified |
| 3 | TAS RESEARCH & DEVELOPERS Under PMA | Make : Drager Model : Pulsar 7000 series Title : Supply of Gas Detectors IR Type complete set for HPCL Vizag Project | 16-11-2025 22:33:33 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | LAMBDA PRIME LLP Under PMA | ₹2,99,308 | Item Categories : Supply of Gas Detectors IR Type complete set for HPCL Vizag Project |
| L2 | NEW FIRE ENGINEERS PRIVATE LIMITED Under PMA | ₹3,93,960 | Item Categories : Supply of Gas Detectors IR Type complete set for HPCL Vizag Project |
| L3 | TAS RESEARCH & DEVELOPERS Under PMA | ₹3,98,500 | Item Categories : Supply of Gas Detectors IR Type complete set for HPCL Vizag Project |
Please sign in or create an account to view contract details and download result documents.
Key insights about ANDHRA PRADESH tender market
Bidders should submit GST, PAN, experience certificates, financials, and OEM authorizations; ensure post-receipt inspection readiness by BHEL and comply with the option clause allowing ±25% quantity variation at contract rates.
Required documents include GST certificate, PAN, experience certificates for detectors, financial statements, EMD documents, technical bid, and OEM authorizations; ensure submission aligns with GeM ATC terms and BHEL inspection requirements.
Delivery is tied to the last delivery order date with potential extended time under the option clause; post-receipt inspection at the consignee site by BHEL, with pre-dispatch inspection if ATC requires.
Data does not specify exact standards; bidders should confirm project-specific requirements and provide IS/IEC or equivalent certifications applicable to IR gas detectors and HPCL Vizag project needs.
If awarded quantity changes by up to 25%, the delivery period adjusts using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, preserving contract rates.
Submit OEM authorization letters or distributor agreements proving the bidder’s right to supply the IR gas detectors; ensure alignment with ATC and GeM bid terms for BHEL Vizag project.
Post-receipt inspection by BHEL occurs at the consignee site prior to acceptance; ensure calibration certificates and acceptance testing documentation are ready for verification.
Sign up now to access all documents
Main Document
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS