Indian Oil Corporation Limited Wet Gas Compressor Package Tender Mathura Uttar Pradesh 2025

Bid Publish Date

04-Nov-2025, 10:04 am

Bid End Date

13-Feb-2026, 5:00 pm

Generate Docs

Progress

Issue04-Nov-2025, 10:04 am
Technical22-01-2026 16:44:56
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

143

Category

Supply of WET GAS COMPRESSOR PACKAGE inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties, commissioning spares etc

Key Highlights

  • Brand/OEM requirements: Not explicitly specified; refer to attached BOM and specifications.
  • Technical certifications: IOCL TPI involvement; IBR/IGC/NACE/Radiography inspections may be required.
  • Special clauses: 25% quantity variation; PBG 5% of contract value valid 20 months.
  • Warranty/AMC: Not specified in data; verify in tender documents.
  • Penalties/LD: Not specified in provided terms; confirm in AtC.
  • Delivery/installation: Delivery timing adjustable under option clause; minimum 30 days extension.
  • Delivery location: Mathura, Uttar Pradesh.
  • Payment terms: Not detailed in data; check GeM bid terms.

Categories 22

Tender Overview

Organization: Indian Oil Corporation Limited, Location: Mathura, Uttar Pradesh. Procurement: Wet gas compressor package with TPI, pre- and post-insurance, taxes, duties, commissioning spares, 3D modeling charges, Hazop charges, freight for schedule 1 and 2, site supervision, testing and commissioning charges in man-days, and training charges in man-days. Estimated contract scope includes multiple supporting services and spares as part of a comprehensive supply and commissioning package. A key differentiator is the inclusion of Third Party Inspection (TPI) by IOCL-approved agencies and PBG terms. The bid also contemplates quantity variations under an option clause up to 25% and extended delivery timing.

Technical Specifications & Requirements

  • TPI: IOCL-approved agency, charges included in quoted prices; no time extensions for delays in inspection.
  • PBG: 5% of total GeM contract value, valid for 20 months.
  • Deliverables: Wet gas compressor package, 3D modeling, Hazop, training, and commissioning services in man-days; site supervision and testing coverage.
  • Inspection scope: Destructive testing, IBR/IGC/NACE/Radiography as applicable; in-country origin content inspection included.
  • Documentation: Reference to BOM/specifications; contact points provided for clarifications.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% during contract and currency, with delivery time adjustments based on formula; minimum extension 30 days.
  • Third-Party Inspection (TPI): IOCL-approved agency; inspection charges included; bidder to arrange timely release notes.
  • Clarifications: Contacts provided; bid includes technical and commercial loading; exact specifications to be reviewed in attached documents.

Key Specifications

  • Wet gas compressor package with associated services (TPI, PF, Insurance excluding transit, taxes, duties)

  • 3D modeling charges for compressor project

  • Hazop charges for WGC in man-days

  • Site supervision, testing and commissioning charges in man-days

  • Training charges for WGC in man-days

  • Freight charges for all supply items (schedule 1 & 2)

Terms & Conditions

  • 25% quantity variation permitted at placement and during currency with delivery time adjustment

  • IOCL-approved TPI to conduct stage-wise and final inspection; charges included in quoted price

  • PBG of 5% of total GeM contract value; validity 20 months

Important Clauses

Payment Terms

Not detailed in data; verify in AtC; expect milestones tied to delivery and inspection clearance.

Delivery Schedule

Delivery begins from last date of original delivery order; extended time calculated as (increased quantity/original quantity) × original delivery period with minimum 30 days.

Penalties/Liquidated Damages

Not specified in provided terms; confirm LD provisions in final AtC and BOM.

Bidder Eligibility

  • Experience in supply and commissioning of wet gas compressor packages or equivalent projects

  • Financial capacity to support multi-item, multi-discipline supply contracts

  • Ability to arrange or demonstrate IOCL-approved TPI cooperation and quality/testing readiness

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of WET GAS COMPRESSOR PACKAGE inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties, commissioning spares etc , Supply of Mandatory Spares inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties etc. , 3D MODELING CHARGES FOR WET GAS COMPRESSOR- , HAZOP CHARGES FOR WET GAS COMPRESSOR in Man-Days , Freight Charges of all supply items schedule 1 and 2 , Site Supervision, Testing and Commissioning Charges in Man-Days , TRAINING CHARGES FOR WET GAS COMPRESSOR in Man-Days

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 18

GeM-Bidding-8543543.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Supply of WET GAS COMPRESSOR PACKAGE inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties, commissioning spares etc

Supply of WET GAS COMPRESSOR PACKAGE inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties, commissioning spares etc

1 ea Delivery: 570 days
#2

Supply of Mandatory Spares inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties etc.

Supply of Mandatory Spares inclusive of TPI, PF, Insurance other than transit Insurance, Taxes and duties etc.

1 ea Delivery: 570 days
#3

3D MODELING CHARGES FOR WET GAS COMPRESSOR-

3D MODELING CHARGES FOR WET GAS COMPRESSOR-

1 su Delivery: 570 days
#4

HAZOP CHARGES FOR WET GAS COMPRESSOR in Man-Days

HAZOP CHARGES FOR WET GAS COMPRESSOR in ManDays

4 su Delivery: 570 days
#5

Freight Charges of all supply items schedule 1 and 2

Freight Charges of all supply items schedule 1 and 2

1 su Delivery: 570 days
#6

Site Supervision, Testing and Commissioning Charges in Man-Days

Site Supervision, Testing and Commissioning Charges in ManDays

120 su Delivery: 690 days
#7

TRAINING CHARGES FOR WET GAS COMPRESSOR in Man-Days

TRAINING CHARGES FOR WET GAS COMPRESSOR in ManDays

15 su Delivery: 705 days

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar wet gas compressor supply & commissioning

4

Financial statements (audited) for past 3 years

5

EMD/Security deposit documentation as required by GeM IOCL

6

Technical bid documents demonstrating compliance with BOM and specifications

7

OEM authorization/certifications if applicable

8

TPI authorization or confirmation of third-party inspection readiness

Corrigendum Updates

11 Updates
#1

Update

06-Feb-2026

Extended Deadline

13-Feb-2026, 5:00 pm

Opening Date

13-Feb-2026, 5:30 pm

#2

Update

30-Jan-2026

Extended Deadline

06-Feb-2026, 5:00 pm

Opening Date

06-Feb-2026, 5:30 pm

#3

Update

23-Jan-2026

Extended Deadline

30-Jan-2026, 5:00 pm

Opening Date

30-Jan-2026, 5:30 pm

#4

Update

16-Jan-2026
#5

Update

13-Jan-2026
#6

Update

13-Jan-2026

Extended Deadline

23-Jan-2026, 5:00 pm

Opening Date

23-Jan-2026, 5:30 pm

#7

Update

24-Dec-2025

Extended Deadline

15-Jan-2026, 5:00 pm

Opening Date

15-Jan-2026, 5:30 pm

#8

Update

17-Dec-2025
#9

Update

09-Dec-2025

Extended Deadline

24-Dec-2025, 5:00 pm

Opening Date

24-Dec-2025, 5:30 pm

#10

Update

09-Dec-2025
#11

Update

17-Nov-2025

Technical Results

S.No Seller Item Date Status
1
BHARAT HEAVY ELECTRICALS LIMITED   Under PMA
-22-01-2026 16:44:56
2
NRP GLOBAL SOLUTIONS PRIVATE LIMITED   Under PMA
-09-11-2025 16:07:09

Financial Results

Rank Seller Price Item
L1
BHARAT HEAVY ELECTRICALS LIMITED(MII)   Under PMA
Item Categories : Supply of WET GAS COMPRESSOR PACKAGE inclusive of TPI, PF, Insurance other than transit Insurance,

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for IOCL wet gas compressor tender in Mathura?

Bidders must submit GST, PAN, experience certificates, and financials with the bid; ensure TPI readiness and OEM authorizations where applicable. The tender includes a 5% PBG, 25% quantity variation, and IOCL-approved TPI inspection; review BOM and AtC for exact deliverables and payment milestones.

What documents are required for IOCL compressor tender in Uttar Pradesh?

Required documents include GST certificate, PAN card, audited financial statements, experience certificates for similar projects, EMD compliance, BOM, technical compliance certificates, and OEM authorizations; ensure TPI readiness and insurance provisions are aligned with scope.

What are the inspection requirements for IOCL third party inspection?

IOCL mandates stage-wise and final inspection by an approved TPIA; inspection charges are included in prices; bidders must arrange timely TPI release notes and ensure compliance with IBR/IGC/NACE/Radiography where applicable.

What is the performance bond for this IOCL tender in 2025?

The bidder must furnish a PBG of 5% of the total GeM contract value, valid for 20 months; ensure bank guarantee format and submission as per GeM IOCL guidelines.

When can quantity be increased under the option clause for IOCL?

Quantity may be increased up to 25% of bid quantity at contract placement and during contract currency; delivery time adjusts based on the formula, with a minimum extension of 30 days.

What are the key technical documents to review before quoting?

Review the BOM, attached specifications, and the BoQ; ensure compliance with 3D modeling, Hazop charges, training in man-days, and site supervision scope; confirm freight schedules for Schedule 1 & 2 and TPI charges inclusion.

What standards or certifications are required for IOCL gas equipment?

Bidders should verify whether IS standards or international codes apply; IOCL references to IBR/IGC/NACE/Radiography indicate relevant inspection and material standards; confirm any ISI or ISO certifications required in the final AtC.