The Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for the supply of substation clamps/connectors under the Ghaziabad, Uttar Pradesh deployment. The procurement falls under the Q3 category for electrical components, with a supply-only scope. The process references a 25% quantity option clause and flexible delivery timing tied to contract execution. Bidders should prepare to meet certificate requirements and adhere to the annexed contract terms. The emphasis is on reliable, compliant components suitable for transmission infrastructure.
Product/service: Substation clamps / connectors (Q3) for Uttar Pradesh transmission
Quantity/values: Not disclosed; flexible 25% option
Standards/certifications: Not specified in data
Delivery: 30+ days minimum extension rule; delivery period linked to original order date
terms_and_conditions_specifics": []
Option to adjust quantity up to 25% during contract
Supply-only scope with all-inclusive bid price
Certificates must be uploaded; non-compliance leads to rejection
Not specified in data; payment terms to be as per contract annex and B/A forms
Delivery period starts from last date of original delivery order; extension may apply per option clause with minimum 30 days
Not specified in data; LD provisions likely in contract terms
Experience in supplying electrical substation components or equivalent clamps/connectors
Financial stability evidence (turnover/statement)
GST and PAN validity, and compliance with bid document certificates
Quantity
65
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
10 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Substation Clamps / Connectors (Q3)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Ghaziabad
Delivery Pincodes
201206
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Yogendra Kumar | 201206,220 KV SUB STATION MURADNAGAR DELHI- MEERUT ROAD MURADNAGAR UTTAR PRADESH | Ghaziabad | Uttar Pradesh | 201206 | 65 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply
Financial statements or turnover proof
Earnest Money Deposit (EMD) document
Technical bid and compliance certificates
OEM authorizations (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as specified in the bid document. Ensure all certificates are uploaded with technical compliance and OEM authorizations if required; adhere to the 25% quantity option terms and delivery formula based on the original order.
Required documents include GST registration, PAN card, experience certificates for similar supply, financial statements, EMD documentation, technical bid, and OEM authorizations where applicable. These must be uploaded along with the bid as per ATC and corrigenda.
Delivery period starts from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Eligibility requires demonstrated experience in supplying electrical substation components, valid GST and PAN, financial stability, and compliance with all bid certificates. OEM authorizations may be required for specific brands or components.
The purchaser may increase/decrease quantity by up to 25% at contract placement and during the contract currency at contracted rates; delivery timing will adjust according to the formula and minimum 30 days rule.
Mandatory certificates include GST, PAN, experience certificates, financial statements, EMD proof, technical bid documents, and any OEM authorizations. Certificates must be uploaded to avoid rejection per the ATC.
Scope is strictly supply of goods only; installation or commissioning is not included. Bid prices must be all-inclusive covering procurement, handling, and delivery to Muradnagar, Ghaziabad.