TenderDekho Logo
Active GEM

Contract Bidding Open For NGFWUTM,24 Ports Core Switch,48 Ports Distribution L3 Switch,24 Ports Distribution L3 Switch,48 Por in BHOPAL, MADHYA PRADESH

Bid Publish Date

14-May-2026, 4:37 pm

Bid End Date

03-Sep-2026, 6:00 pm

EMD

₹9,20,184

Value

₹3,06,72,802

Generate Docs

Progress

Issue14-May-2026, 4:37 pm
Corrigendum27-Aug-2026
AwardPending

A tender has been published for National Institute Of Fashion Technology (nift) Head Office New Delhi NGFWUTM, 24 Ports Core Switch, 48 Ports Distribution L3 Switch, 24 Ports Distribution L3 Switch, 48 Ports Access switch, 24 Ports Access Switch, 08 Ports Access Switch, Wireless Hardware controller, Indoor Access Point 4x4 MIMO, Indoor Access Point 2x2 MIMO, 10G SFP plus Transceiver, 1G SFP Transceiver, 24 Ports PoE Switch, 16 Ports PoE Switch, 08 Ports PoE Switch, 2MP Bullet Camera, 2MP Dome Camera, 64 Channel NVR with 40TB HDD, CAT6 Cable UTP 305 Mtr Bundle, 24 Ports Patch Panel Loaded, 0. 5 Mtr CAT6 Patch Cord, 1 Mtr CAT6 Patch Cord, IO keystone, Face Plate and Box, 6 Core Fibre Cable, 24 Ports LIU LC Loaded, 12 Ports LIU LC Loaded, 1 Mtr Fibre Patch Cord, 42U Server Rack, 12U Wall Mount Rack Loaded, 9U Wall Mount Rack Loaded, 55 inch Display, 1 KVA UPS 3 Years Warranty, 10 KVA UPS 3 Years Warranty, RJ45 Box of 100, Cable Manager, 32mm HDPE Pipe, 1inch Cassing Capping, 2 inch Cassing Capping, Supply, Installation, Configuration Commissioning Charges in BHOPAL, MADHYA PRADESH. Quantity: 23739 by. Submission Deadline: 03-09-2026 18: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

23739

Category

24 Ports Core Switch

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

5 Days

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

NGFWUTM , 24 Ports Core Switch , 48 Ports Distribution L3 Switch , 24 Ports Distribution L3 Switch , 48 Ports Access switch , 24 Ports Access Switch , 08 Ports Access Switch , Wireless Hardware controller , Indoor Access Point 4x4 MIMO , Indoor Access Point 2x2 MIMO , 10G SFP plus Transceiver , 1G SFP Transceiver , 24 Ports PoE Switch , 16 Ports PoE Switch , 08 Ports PoE Switch , 2MP Bullet Camera , 2MP Dome Camera , 64 Channel NVR with 40TB HDD , CAT6 Cable UTP 305 Mtr Bundle , 24 Ports Patch Panel Loaded , 0.5 Mtr CAT6 Patch Cord , 1 Mtr CAT6 Patch Cord , IO keystone, Face Plate and Box , 6 Core Fibre Cable , 24 Ports LIU LC Loaded , 12 Ports LIU LC Loaded , 1 Mtr Fibre Patch Cord , 42U Server Rack , 12U Wall Mount Rack Loaded , 9U Wall Mount Rack Loaded , 55 inch Display , 1 KVA UPS 3 Years Warranty , 10 KVA UPS 3 Years Warranty , RJ45 Box of 100 , Cable Manager , 32mm HDPE Pipe , 1inch Cassing Capping , 2 inch Cassing Capping , Supply, Installation, Configuration Commissioning Charges

Authority Records

MINISTRY OF TEXTILES

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9265614.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

National Institute Of Fashion Technology (nift) Head Office New Delhi

Department

NA

Corrigendum Updates

4 Updates
#1

Update

27-Aug-2026
#2

Update

27-Aug-2026

Extended Deadline

03-Sep-2026, 12:30 pm

Opening Date

03-Sep-2026, 1:00 pm

#3

Update

18-Jun-2026
#4

Update

18-Jun-2026

Extended Deadline

29-Jun-2026, 11:30 am

Opening Date

29-Jun-2026, 12:00 pm

Bill of Quantities (BOQ) 40 Items Sign in for GEM prices

#1

NGFWUTM

As per the attached specifications

1 each Delivery: 42 days
#2

24 Ports Core Switch

As per the attached specifications

1 each Delivery: 42 days
#3

48 Ports Distribution L3 Switch

As per the attached specifications

1 each Delivery: 42 days
#4

24 Ports Distribution L3 Switch

As per the attached specifications

3 each Delivery: 42 days
#5

48 Ports Access switch

As per the attached specifications

11 each Delivery: 42 days
#6

24 Ports Access Switch

As per the attached specifications

16 each Delivery: 42 days
#7

08 Ports Access Switch

As per the attached specifications

4 each Delivery: 42 days
#8

Wireless Hardware controller

As per the attached specifications

1 each Delivery: 42 days
#9

Indoor Access Point 4x4 MIMO

As per the attached specifications

12 each Delivery: 42 days
#10

Indoor Access Point 2x2 MIMO

As per the attached specifications

137 each Delivery: 42 days
#11

Indoor Access Point 2x2 MIMO

As per the attached specifications

44 each Delivery: 42 days
#12

10G SFP plus Transceiver

As per the attached specifications

80 each Delivery: 42 days
#13

1G SFP Transceiver

As per the attached specifications

38 each Delivery: 42 days
#14

24 Ports PoE Switch

As per the attached specifications

2 each Delivery: 42 days
#15

16 Ports PoE Switch

As per the attached specifications

11 each Delivery: 42 days
#16

08 Ports PoE Switch

As per the attached specifications

6 each Delivery: 42 days
#17

2MP Bullet Camera

As per the attached specifications

78 each Delivery: 42 days
#18

2MP Dome Camera

As per the attached specifications

108 each Delivery: 42 days
#19

64 Channel NVR with 40TB HDD

As per the attached specifications

3 each Delivery: 42 days
#20

CAT6 Cable UTP 305 Mtr Bundle

As per the attached specifications

122 each Delivery: 42 days
#21

24 Ports Patch Panel Loaded

As per the attached specifications

65 each Delivery: 42 days
#22

0.5 Mtr CAT6 Patch Cord

As per the attached specifications

839 each Delivery: 42 days
#23

1 Mtr CAT6 Patch Cord

As per the attached specifications

433 each Delivery: 42 days
#24

IO keystone, Face Plate and Box

As per the attached specifications

433 each Delivery: 42 days
#25

6 Core Fibre Cable

As per the attached specifications

4,500 mtr Delivery: 42 days
#26

24 Ports LIU LC Loaded

As per the attached specifications

4 each Delivery: 42 days
#27

12 Ports LIU LC Loaded

As per the attached specifications

32 each Delivery: 42 days
#28

1 Mtr Fibre Patch Cord

As per the attached specifications

114 each Delivery: 42 days
#29

42U Server Rack

As per the attached specifications

1 each Delivery: 42 days
#30

12U Wall Mount Rack Loaded

As per the attached specifications

31 each Delivery: 42 days
#31

9U Wall Mount Rack Loaded

As per the attached specifications

1 each Delivery: 42 days
#32

55 inch Display

As per the attached specifications

3 each Delivery: 42 days
#33

1 KVA UPS 3 Years Warranty

As per the attached specifications

32 each Delivery: 42 days
#34

10 KVA UPS 3 Years Warranty

As per the attached specifications

1 each Delivery: 42 days
#35

RJ45 Box of 100

As per the attached specifications

5 each Delivery: 42 days
#36

Cable Manager

As per the attached specifications

65 each Delivery: 42 days
#37

32mm HDPE Pipe

As per the attached specifications

1,500 mtr Delivery: 42 days
#38

1inch Cassing Capping

As per the attached specifications

8,000 mtr Delivery: 42 days
#39

2 inch Cassing Capping

As per the attached specifications

7,000 mtr Delivery: 42 days
#40

Supply, Installation, Configuration Commissioning Charges

As per the attached specifications

1 each Delivery: 42 days

Categories 33

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data