State Bank of India SITC 1.5/2.0 TR Hi-Wall Split ACs Kolkata West Bengal 2026

Bid Publish Date

13-Oct-2026, 6:59 pm

Bid End Date

23-Oct-2026, 7:00 pm

Value

₹2,61,941

Progress

Issue13-Oct-2026, 6:59 pm
AwardPending

Tender Overview

State Bank of India (Department of Financial Services) invites bids in Kolkata, West Bengal for SITC of 1.5 TR hi-wall split systems, SITC of 2.0 TR hi-wall split systems, copper refrigerant piping for 1.5TR and 2.0TR, drain pipe, outdoor stand for both capacities, and dismantling of old AC systems. Estimated value is ₹261,941. The supply location is No 1 Strand Road, Samriddhi Bhavan, SBI LHO, Kolkata 700001. The package comprises six items in the BOQ, though item-level quantities are not disclosed. A mandatory quantity-flexibility clause allows up to 25% increase/decrease in contracted quantities at the same rates. This tender targets SBI procurement for compliant cooling equipment and retrofitting services in SBI facilities in Kolkata.

Key Specifications

  • Product: 1.5 TR hi-wall split systems

  • Product: 2.0 TR hi-wall split systems

  • Accessories: copper refrigerant piping for 1.5TR and 2.0TR

  • Other: drain pipe, outdoor stand, dismantling of old AC systems

  • Location: SBI LHO Kolkata, 700001

  • Quantity: 6 BOQ items (quantities not disclosed)

  • Value: estimated ₹261,941

Terms & Conditions

  • Quantity variation up to 25% at contracted rates

  • Delivery/installation to SBI Kolkata address

  • Mandatory bid documents and OEM authorizations

Important Clauses

Payment Terms

Payment terms to be specified in final tender; ensure alignment with delivery/installation milestones and any advance or milestone payments.

Delivery Schedule

Delivery period adjustable using option clause; additional time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Penalties and LD provisions to be defined in buyer terms; ensure vendor margin and performance assurances in final bid.

Bidder Eligibility

  • HVAC equipment supply and installation capability in Kolkata

  • Ability to dismantle existing AC systems on SBI premises

  • Compliance with SBI procurement terms and OEM authorizations (if required)

Advertisement

Tender Data

Bid Details

Quantity

52

Category

SITC OF 2.0 TR HI-WALL SPLIT SYSTEMS

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

OEM Avg. Turnover

10

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SITC OF 1.5 TR HI-WALL SPLIT SYSTEMS , SITC OF 2.0 TR HI- WALL SPLIT SYSTEMS , COPPER REFRIGERANT PIPING FOR 1.5TR AND 2.0TR HI-WALL SPLIT AC , DRAIN PIPE , OUTDOOR STAND FOR 1.5TR AND 2.0TR HI-WALL SPLIT AC , DISMANTLING OF OLD AC SYSTEMS

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Kolkata

Delivery Pincodes

700001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Souvagya Kumar Sahoo700001,LHO kolkata, 1 Strand Road, KolkataKolkataWest Bengal700001215-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10030713.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Kolkata

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

SITC OF 1.5 TR HI-WALL SPLIT SYSTEMS

Supplying , Installation, Testing and Commissioning of Air Cooled Hi Wall split type Air conditioners complete withIndoor unit(IDU), Out door unit (ODU), surface / concealed copper Refrigerant piping with insulation (closed cell elastomeric nitrile rubber tubular pipe section) upto 3 Mtr(IDU to ODU), copper power cable upto 3.5 Mtr (IDU to ODU) R-32/R-410/ R-407 Green Refrigerant wireless Remote control, suitable for working between 180- 260V with low & high voltage cutoff and 50 hz ,1 phase AC supply capable of performing cooling, dehumidification, air circulation of following capacity with Scroll / rotarycompressor. The system shall be able to deliver 100% of the rated capacity upto 42 Degree C. Min 5 year Original Equipment Manufacturer (OEM) warranty both compressor and Printed Circuit Board (PCB). Must comply Electrical cable IS 694 or IS 9968 temperature sensing control IS/International Electrotechnical Commission (IEC) 60730,hermetic compressor IS 10617, heat exchanger IS 11329, capacitor IS 2993 and motor IS 12615. Complete as per CPWD specification and IS - 1391 Part II 2023. The system shall be able to operate up to 50 Degree C (out door ambient temperature). Inverter Type Cooling with 5 Star BEE Rating, Minimum value of ISEER 5.6.

2 set Delivery: 15 days
#2

SITC OF 2.0 TR HI-WALL SPLIT SYSTEMS

Supplying , Installation, Testing and Commissioning of Air Cooled Hi Wall split type Air conditioners complete withIndoor unit(IDU), Out door unit (ODU), surface / concealed copper Refrigerant piping with insulation (closed cell elastomeric nitrile rubber tubular pipe section) upto 3 Mtr(IDU to ODU), copper power cable upto 3.5 Mtr (IDU to ODU) R-32/R-410/ R-407 Green Refrigerant wireless Remote control, suitable for working between 180- 260V with low & high voltage cutoff and 50 hz ,1 phase AC supply capable of performing cooling, dehumidification, air circulation of following capacity with Scroll / rotarycompressor. The system shall be able to deliver 100% of the rated capacity upto 42 Degree C. Min 5 year Original Equipment Manufacturer (OEM) warranty both compressor and Printed Circuit Board (PCB). Must comply Electrical cable IS 694 or IS 9968 temperature sensing control IS/International Electrotechnical Commission (IEC) 60730,hermetic compressor IS 10617, heat exchanger IS 11329, capacitor IS 2993 and motor IS 12615. Complete as per CPWD specification and IS - 1391 Part II 2023. The system shall be able to operate up to 50 Degree C (out door ambient temperature). Inverter Type Cooling with 5 Star BEE Rating, Minimum value of ISEER 5.6.

2 set Delivery: 15 days
#3

COPPER REFRIGERANT PIPING FOR 1.5TR AND 2.0TR HI-WALL SPLIT AC

Supplying, Installation, testing and commissioning including Power cable ,vaccumiazation and Nitrogen testing of following nominal sizes of soft/hard drawn copper refrigerant piping for above system, complete with fittings, with suitable adjustable ring type hanger supports, jointing/brazing including accessories, insulated with XPLE Class-O tubular insulation/with Class-O closed cell elastometric nitrile rubber tubular sleeves sections of 19 mm thick insulation as given below for Suction and Liquid lines, all accessoriesas per specifications etc. as required 6.4 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm and 12.7 mm dia (OD) (Soft drawn) with tube thickness 1.2 mm for 1.5 TR HI WALL SPLIT

20 mtr Delivery: 15 days
#4

DRAIN PIPE

Supply and fixing of duly insulated 25mm UPVC drain pipe

20 mtr Delivery: 15 days
#5

OUTDOOR STAND FOR 1.5TR AND 2.0TR HI-WALL SPLIT AC

Supplying , Installation, Testing and Commissioning of outdoor frame / stands to withstand the full load of outdoor units and making good all the damage for 1.5 TR Hi-Wall Split AC.

4 set Delivery: 15 days
#6

DISMANTLING OF OLD AC SYSTEMS

Dismantling of existing air conditioner

4 set Delivery: 15 days
Advertisement

Categories 87

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for SBI HVAC tender in Kolkata 2026 with 1.5 and 2.0 TR?

Bidders must register with SBI, provide OEM authorizations if required, submit GST and PAN, and meet equipment specifications for 1.5 and 2.0 TR hi-wall split systems. Include copper piping, drains, outdoor stands, and dismantling services; address delivery to No 1 Strand Road, Samriddhi Bhavan, 700001.

What documents are required for SBI Kolkata AC procurement bid 2026?

Submit GST certificate, PAN card, experience certificates for HVAC installs, financial statements, EMD or Security deposit as applicable, technical bid documents, OEM authorizations, and installation capability proof; ensure compliance with delivery terms and site readiness at SBI Kolkata premises.

What are the technical requirements for the 1.5/2.0 TR AC units?

Tenders expect hi-wall split systems of 1.5 TR and 2.0 TR capacities with copper refrigerant piping compatible with standard residential/commercial SBI sites; verify energy rating, noise levels, and warranty terms as per final purchase clauses.

When is the delivery deadline for SBI Kolkata AC materials tender 2026?

Delivery timing follows the option clause; initial delivery period is defined in the final terms, with potential extension calculated by the specified formula, maintaining a minimum extension of 30 days.

What are the EMD and payment terms for SBI Kolkata tender?

EMD details are not shown here; expect standard SBI practice in the final pack. Payment terms typically align with delivery/completion milestones; confirm whether advance or milestone payments are allowed and the timeline (e.g., 30 days after completion).

Which location and installation scope are specified for this SBI bid in Kolkata?

Delivery/installation at SBI LHO Kolkata, No 1 Strand Road, Samriddhi Bhavan, Kolkata 700001; includes dismantling of old AC systems and installation of new split units, with outdoor stands and drainage piping covered in scope.

What is the scope of the BOQ items in this SBI tender Kolkata 2026?

BOQ lists six items; exact quantities are not disclosed in the available data. Bidder should verify item-wise quantities, piping lengths, and accessory counts during bid submission and align with 25% quantity variation clause.

What standards or certifications are required for SBI AC procurement in Bengal?

Current data lacks explicit standards; bidders should confirm ISI/IS/ISO certifications and product compliance in the final tender packet, ensuring models are compatible with SBI infrastructure and safety requirements.

Advertisement