TenderDekho Logo
Active GEM

Urban Development Department Uttar Pradesh LED Luminaire Tender IS 10322 Part 5 Section 3 V3 2026

Bid Publish Date

06-Oct-2026, 1:17 pm

Bid End Date

16-Oct-2026, 2:00 pm

Progress

Issue06-Oct-2026, 1:17 pm
AwardPending

Key Highlights

  • • IS 10322 (Part 5/Section 3) (V3) (Q2) compliance requirement for LED street luminaires
  • • Option clause allows up to 25% quantity variation during and after award
  • • Turnover criteria for both bidder and OEM with 3-year average financials
  • • OEM turnover criterion applies in multi-bid scenarios (bunch bids)

Tender Overview

Urban Development Department Uttar Pradesh invites bids for LED luminaire for road and street lights conforming to IS 10322 (Part 5/Section 3) (V3) (Q2). The tender contemplates flexible quantity up to 25% increase/decrease at contract rates, with delivery timelines adjusted accordingly. Although exact estimated value and EMD are not disclosed, bidders must meet turnover criteria for both bidder and OEM as described in the Terms. The procurement aims to standardize street illumination with IS 10322-compliant luminaires, ensuring compatibility with UP urban road networks and installation conditions. A key differentiator is the requirement for detailed design drawings to be approved within 5 days of award, followed by buyer feedback on drawings. This bid emphasizes compliance with specific IS standards and agile delivery planning to accommodate potential quantity fluctuations.

Technical Specifications & Requirements

  • Product category: LED luminaire for road and street lighting
  • Standard: IS 10322 (Part 5/Section 3) (V3) (Q2) for performance and safety
  • Delivery terms: Option clause allows ±25% quantity variation during contract, with delivery recalculation based on (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Turnover criteria: Minimum average annual turnover over the last 3 financial years for bidders and for OEMs, verified by audited balance sheets or CA certificate
  • Pre- fabrication step: Detailed Design Drawings to be submitted within 5 days of award for buyer approval or modification list
  • BOQ: No items listed in the current BOQ (0 total items)

Terms & Eligibility

  • EMD/financial guarantee: Not disclosed in available data; bidders must satisfy the standard turnover requirements for both bidder and OEM as per bid document
  • Delivery timeline: Delivery period commences from the last date of original delivery order; extended period applies per option clause
  • Design approval: Detailed Design Drawings to be submitted within 5 days of award; buyer response on approval or required modifications to follow
  • Compliance: OEM turnover criterion applies in case of bunch bids; highest bid value OEM must meet criteria
  • Documentation: Certified financial statements or CA certificates to verify turnover; bid submission must include these attestations
  • Warranty & penalties: Not specified in available details; baseline terms imply compliance with IS 10322 luminaire standards and delivery conditions

Key Specifications

  • Product: LED luminaire for road and street lighting

  • Standard: IS 10322 (Part 5/Section 3) (V3) (Q2)

  • Quantity flexibility: ±25% as per option clause

  • Delivery time: minimum 30 days adjustment with extended period rules

  • Design submission: Detailed Design Drawings due within 5 days of award

Terms & Conditions

  • Option quantity variation up to 25% with contract-rate adjustments

  • Bidder and OEM turnover criteria demonstrated via audited statements or CA certificates

  • Mandatory Detailed Design Drawings submission within 5 days of award for approval

Important Clauses

Payment Terms

Not disclosed in available data; standard tender terms to be confirmed in bid document

Delivery Schedule

Delivery period starts from last date of original delivery order; option clause affects extended delivery time with minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; penalties to be detailed in final bid terms

Bidder Eligibility

  • Minimum turnover criteria for bidder over last 3 financial years as per bid document

  • OEM turnover criterion met for the primary product in case of bunch bids

  • Ability to submit Detailed Design Drawings within 5 days of award

Advertisement

Tender Data

Bid Details

Quantity

300

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

9

OEM Avg. Turnover

50

Past Performance

50 %

Warranty Period

7 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Nagar Panchayat Islamnagar Tehsil Bilsi Budaun

Delivery Pincodes

202523

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mohammad Faraj202523,Nagar Panchayat Islamnagar Tehsil Bilsi BudaunNagar Panchayat Islamnagar Tehsil Bilsi Budaun-20252330045-

Authority Records

URBAN DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9990296.pdf

Main Document

Buyer uploaded ATC document

ATC

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Nagar Panchayat Islamnagar Budaun

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements for the last 3 financial years or CA certificate indicating turnover

4

CA/Cost Accountant certificate for turnover (bidder and OEM if applicable)

5

OEM authorization (if bidding through an OEM)

6

Technical bid documents demonstrating IS 10322 compliance (statements, test reports)

7

Duly filled Detailed Design Drawings (within 5 days of award) for buyer approval

8

Any other bidder-specific eligibility documents requested in bid document

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What are the eligibility criteria for LED luminaire tender in Uttar Pradesh 2026?

Bidders must meet turnover requirements for both bidder and OEM over the last 3 financial years, provide audited balance sheets or CA certificates, and supply Detailed Design Drawings within 5 days of award for approval. IS 10322 compliance and OEM authorization may be required for bid validity and performance assurance.

How to participate in the Urban Development UP LED bid 2026?

Prepare a bid package including GST, PAN, turnover certificates, OEM authorization if applicable, and Detailed Design Drawings within 5 days of award. Ensure IS 10322 (Part 5/Section 3) compliance, confirm 25% quantity variation terms, and attach test reports showing luminaire performance.

What documents are required for UP LED lighting tender submission 2026?

Submit GST registration, PAN, audited financials or CA turnover certificate for bidder and OEM, OEM authorization if required, bid technical compliance, and Detailed Design Drawings within 5 days of award. Include IS 10322 conformity evidence and any module test reports.

What are the technical specifications for IS 10322 compliant luminaires in UP tender?

Luminaires must comply with IS 10322 Part 5/Section 3 (V3) Q2, covering performance, electrical safety, and installation compatibility for road and street lighting. Documentation should include test reports demonstrating conformity to the standard and compatibility with UP road networks.

What is the EMD amount for the UP LED procurement bid 2026?

EMD details are not disclosed in the available data; bidders should refer to the official bid document to confirm the exact EMD amount and acceptable payment mode, ensuring compliance with submission timelines and financial reliability checks.

When is the delivery timeline and option clause for UP LED luminaires?

Delivery can be adjusted with the option clause allowing ±25% quantity variation. The extended delivery time uses the formula (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; delivery starts after the original delivery order date.

How to ensure OEM turnover criteria are met for UP LED bids 2026?

OEM turnover must reach the minimum average annual turnover stated in the bid document for the last 3 financial years; if the OEM is under 3 years old, turnover from completed years post-incorporation is used. Bunch bids require the leading OEM to satisfy this criterion.

What steps are required for Detailed Design Drawings approval in UP tender?

Submit Detailed Design Drawings within 5 days of award; the buyer will approve or return a complete list of modifications. Subsequent revisions must address all comments to proceed with fabrication without delays and ensure IS 10322 compliance.

Advertisement