Bid Publish Date
07-May-2026, 5:55 pm
Bid End Date
23-May-2026, 3:00 pm
Location
Progress
RABharat Heavy Electricals Limited (BHEL) invites bids for CI gate valves intended for the NTPC SIPAT STPP Stage III 1X800MW project, located in Bilaspur, Chhattisgarh. The tender references plant-specific gate valve procurement with a flexible quantity clause (up to 25% variation) and a requirement to align with approved technical drawings before fabrication. The package emphasizes data sheet alignment, End User Certificate usage, and GST considerations. A successful bidder must submit Detailed Design Drawings within 7 days of award for buyer approval, with potential delivery rescheduling if drawing approvals lag. The scope reflects a highly project-specific valve supply, involving OEM or reseller participation as per the terms.
Product/service names: CI gate valves for NTPC SIPAT STPP Stage III 1X800MW
Quantities: up to 25% variation allowed; delivery timeline tied to original delivery period
EMD/Estimated value: Not specified in data; anticipate project-scale valve procurement
Experience: OEM or reseller experience implied; exact years not disclosed
Quality/standards: Data sheet alignment required; no explicit standard codes provided
Delivery may be extended with a 25% quantity variation; minimum 30 days
7-day window for Detailed Design Drawings; approvals affect schedule
GST payables and reimbursement limited to actuals or quoted GST%, whichever lower
GST handling by bidder with reimbursement capped to lower of actuals or quoted rate; no specific advance/payment schedule provided
Delivery period linked to original delivery order; extension allowed under option clause with calculated time formula
No explicit LD rate published; delays tied to drawing approvals influence delivery timeline
Must not be under liquidation or court proceedings; provide undertaking
OEM or authorized reseller participation permitted; data sheet must reflect offered product
GST registration required; PAN provided; banking and EFT mandate furnished
Start
02-Oct-2026, 12:00 pm
End
03-Oct-2026, 3:00 pm
Duration: 27 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
23
OEM Avg. Turnover
23
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CI GATE VALVES for NTPC SIPAT STPP STAGE III 1X800MW project
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
23-May-2026, 9:30 am
Opening Date
23-May-2026, 10:00 am
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Data Sheet of offered product
End User Certificate in buyer format (if demanded)
Bidder undertaking (no liquidation/court proceedings) to be uploaded
Any OEM authorization if bidding through reseller
Key insights about CHHATTISGARH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and product Data Sheet. Ensure the offered CI gate valves meet the data sheet and buyer format End User Certificate if required. Include OEM authorization if bidding via reseller and undertake non-liquidation status. The 7-day design drawing submission is a critical early step.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, Data Sheet of the offered valves, End User Certificate in buyer format if requested, and an undertaking that the bidder is not undergoing liquidation or similar action. Also include OEM authorization if applicable.
Delivery period starts from the last date of the original delivery order; option clause allows up to 25% quantity variation with extended delivery time calculated as (Increased/Original) × Original period, minimum 30 days. Delays in drawing approvals may refix delivery without LD.
Data Sheet detailing offered CI gate valves must be uploaded with the bid; buyers will match against specifications. Any unexplained mismatch can lead to bid rejection; ensure all parameters align with the Data Sheet.
Bidders must determine applicable GST themselves; the buyer will reimburse GST at actuals or the applicable rate, whichever is lower, limited to the quoted GST percentage. No additional GST borne by the buyer beyond quoted rate.
Successful bidder must submit Detailed Design Drawings within 7 days of award for buyer approval. The buyer may approve or list modifications within 7 days; supply must conform to approved drawings. Delays in approval can shift the delivery timeline without LD.
Bidders can be the OEM or authorized resellers. Ensure compliance with data sheet, End User Certificate format if required, and undertake non-liquidation statement. Ensure full data sheet alignment and proper banking details for vendor code creation.
The purchaser may increase or decrease quantity up to 25% at contract time and during the currency at contracted rates. The extended time is calculated by the stated formula with a minimum 30 days, ensuring schedule flexibility.