TenderDekho Logo
Closed GEM

Indian Army Presser Indicator Flow Meter and RO Equipment Tender Bangalore 2026 - IS standards and PMC requirements

Bid Publish Date

03-Aug-2026, 8:04 pm

Bid End Date

31-Aug-2026, 11:00 am

Generate Docs

Progress

RA
Issue03-Aug-2026, 8:04 pm
Corrigendum24-Aug-2026
Reverse AuctionCompleted
AwardCompleted

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids in Bangalore, Karnataka for a multi-item procurement package including presser indicator flow meters, pressure indicator adopters, filter housings, RO pumping motors (0.75 HP), armature coil assemblies, field coil assemblies, carbon plate holders and carbon components, along with repairs for related equipment and a wet grinding machine. The scope covers Supply, Installation, Testing and Commissioning (SITC) of the listed goods. The buyer reserves quantity variation up to 25% during contract and currency periods, with delivery timelines tied to the original delivery window and adjusted for extensions. Local supply capability within 50 km of ASC Centre (North) is preferred for timely service.

Technical Specifications & Requirements

  • Product/service categories include: presser indicator flow meters, pressure indicator adopters, filter housing, RO pumping motor 0.75 HP, armature coil assembly, field coil assembly, carbon plate holder, carbon components, wet grinding machine repairs.
  • No explicit technical specifications or itemized BOQ quantities are provided in the tender data; bidders should prepare SITC plans based on typical government equipment repair and RO system components.
  • The scope includes repairs of mentioned components and complete SITC of new items, with adherence to general government procurement norms.
  • Certification/document upload is mandatory; ATC/corrigendum documents may apply.
  • Local service prerequisite: address within 50 km of ASC Centre (North) for prompt supply and service.

Terms, Conditions & Eligibility

  • EMD amount not disclosed in the available tender information.
  • Delivery period is linked to the original delivery order and may extend following the option clause; minimum extension calculation applies.
  • Scope of supply includes SITC for all items; price should cover all cost components.
  • Certificates and documents must be uploaded with the bid; non-submission risks rejection.
  • Local address requirement and compliance with buyer ATC terms are mandatory for eligibility.

Key Specifications

  • Product/service names: presser indicator flow meter, pressure indicator adopter, filter housing, RO pumping motor 0.75Hp, armature coil assembly, field coil assembly, carbon plate holder, carbon, wet grinding machine repairs

  • Estimated value: Not disclosed in tender data

  • EMD: Not disclosed in tender data

  • Supply scope: SITC (Supply, Installation, Testing and Commissioning)

  • Delivery locality: within 50 km of ASC Centre (North) for timely supply

  • Standards/quality: Not specified in data; rely on standard government procurement norms

Terms & Conditions

  • Option clause allows quantity variation up to 25% at contract placement and during currency

  • SITC scope of supply includes all cost components and installation testing

  • Local registered address within 50 km of ASC Centre (North) required for timely supply

Important Clauses

Payment Terms

Not disclosed in tender data; bidders should expect standard government terms linked to SITC and milestones per delivery orders

Delivery Schedule

Delivery period starts from last date of original delivery order; extension formula applies with minimum 30 days if increased quantity, subject to original delivery period

Penalties/Liquidated Damages

LD provisions not specified; standard government procurement penalties likely apply for delayed delivery

Bidder Eligibility

  • Within 50 km of ASC Centre (North) for timely supply

  • Experience in SITC of similar equipment or RO systems

  • Compliance with standard government procurement documentation and certifications

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1MANAS INFRA PROJECTS(MSE)   Under PMA Winner ₹24,000Item Categories : Presser Indicator Flow Meter,Pressure Indicator Adopter,Filter Housing,RO Pumping Motor 0.75Hp,The
L2LIFEWAY ENGINEERING CORP PRIVATE LIMITED (MSE)   Under PMA₹30,540Item Categories : Presser Indicator Flow Meter,Pressure Indicator Adopter,Filter Housing,RO Pumping Motor 0.75Hp,The
L3LIFE ENGINEERING CONSORTIUM (MSE)   Under PMA₹40,640Item Categories : Presser Indicator Flow Meter,Pressure Indicator Adopter,Filter Housing,RO Pumping Motor 0.75Hp,The

🎉 L1 Winner

MANAS INFRA PROJECTS(MSE)   Under PMA

Final Price: ₹24,000

Reverse Auction Schedule

Completed

Start

18-Sep-2026, 10:00 am

End

19-Sep-2026, 10:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

11

Category

Armature Coil Assembly

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Presser Indicator Flow Meter , Pressure Indicator Adopter , Filter Housing , RO Pumping Motor 0.75Hp , The above mentioned RO repair removes the damage , Armature Coil Assembly , Filed Coil Assembly , Carbon Plate Holder , Carbon , The above mentioned printer repairs removes tha all parts , The mentioned wet grinding machine repair removes the all

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Bangalore

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BangaloreBangalore--145-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9703250.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Presser Indicator Flow Meter

AS PER RFP

1 nos Delivery: 45 days
#2

Pressure Indicator Adopter

AS PER RFP

1 nos Delivery: 45 days
#3

Filter Housing

AS PER RFP

1 nos Delivery: 45 days
#4

RO Pumping Motor 0.75Hp

AS PER RFP

1 nos Delivery: 45 days
#5

The above mentioned RO repair removes the damage

AS PER RFP

1 job Delivery: 45 days
#6

Armature Coil Assembly

AS PER RFP

1 nos Delivery: 45 days
#7

Filed Coil Assembly

AS PER RFP

1 nos Delivery: 45 days
#8

Carbon Plate Holder

AS PER RFP

1 nos Delivery: 45 days
#9

Carbon

AS PER RFP

1 nos Delivery: 45 days
#10

The above mentioned printer repairs removes tha all parts

AS PER RFP

1 job Delivery: 45 days
#11

The mentioned wet grinding machine repair removes the all

AS PER RFP

1 job Delivery: 45 days

Categories 25

Corrigendum Updates

1 Update
#1

Update

24-Aug-2026

Extended Deadline

31-Aug-2026, 5:30 am

Opening Date

31-Aug-2026, 6:00 am

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates

4

Financial statements

5

EMD/Security deposit (as applicable in tender)

6

Technical bid documents

7

OEM authorizations (if required)

8

Any certificates requested in Bid Document, ATC, Corrigendum

Frequently Asked Questions

Key insights about KARNATAKA tender market

How to bid for presser indicator and RO equipment tender in Bangalore?

Bidders should verify organization details, submit GST and PAN, experience certificates, financials, EMD, and technical bid documents as per Terms and Conditions. Ensure SITC scope is clearly priced and delivery aligns with the 50 km local supply requirement. Include OEM authorizations if mandated.

What documents are required for Indian Army Bangalore procurement?

Required documents include GST registration, PAN, experience certificates, financial statements, EMD evidence, technical bid documents, OEM authorizations, and any certificates called out in ATC/Corrigendum. Upload all requested certificates to avoid rejection.

What are the delivery expectations for SITC in this tender?

Delivery is tied to the original delivery order; option clauses allow up to 25% quantity variation with adjusted delivery time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.

What standards or certifications are required for this bid in Karnataka?

While the tender data lacks explicit standards, bidders should prepare IS/ISO certifications and OEM authorizations as applicable, and upload any certificates requested in the Bid Document, ATC, and Corrigendum, to ensure compliance.

Is there a local address requirement for Bangalore procurement?

Yes, bidders must provide a local registered address within 50 km of ASC Centre (North) to facilitate timely supply and service responsiveness, as specified in the buyer terms.

What is the scope of supply for this Indian Army tender?

Scope includes Supply, Installation, Testing and Commissioning of listed items, covering presser indicator flow meters, RO components, coil assemblies, carbon parts, filter housing, and repairs of wet grinding machine parts, with a single SITC contract.

What happens if the bid quantity changes during the contract?

The Purchaser may increase or decrease quantity up to 25% at contract placement and during the currency, with delivery extensions calculated accordingly and ensuring minimum 30 days for added work.

What is the payment structure for this SITC contract?

Payment terms are not specified in the available data; bidders should await formal bid documents to confirm milestones, advance, and post-delivery payment terms tied to SITC milestones.

Advertisement