Progress
RAThe Indian Army, Department Of Military Affairs, invites bids in Bangalore, Karnataka for a multi-item procurement package including presser indicator flow meters, pressure indicator adopters, filter housings, RO pumping motors (0.75 HP), armature coil assemblies, field coil assemblies, carbon plate holders and carbon components, along with repairs for related equipment and a wet grinding machine. The scope covers Supply, Installation, Testing and Commissioning (SITC) of the listed goods. The buyer reserves quantity variation up to 25% during contract and currency periods, with delivery timelines tied to the original delivery window and adjusted for extensions. Local supply capability within 50 km of ASC Centre (North) is preferred for timely service.
Product/service names: presser indicator flow meter, pressure indicator adopter, filter housing, RO pumping motor 0.75Hp, armature coil assembly, field coil assembly, carbon plate holder, carbon, wet grinding machine repairs
Estimated value: Not disclosed in tender data
EMD: Not disclosed in tender data
Supply scope: SITC (Supply, Installation, Testing and Commissioning)
Delivery locality: within 50 km of ASC Centre (North) for timely supply
Standards/quality: Not specified in data; rely on standard government procurement norms
Option clause allows quantity variation up to 25% at contract placement and during currency
SITC scope of supply includes all cost components and installation testing
Local registered address within 50 km of ASC Centre (North) required for timely supply
Not disclosed in tender data; bidders should expect standard government terms linked to SITC and milestones per delivery orders
Delivery period starts from last date of original delivery order; extension formula applies with minimum 30 days if increased quantity, subject to original delivery period
LD provisions not specified; standard government procurement penalties likely apply for delayed delivery
Within 50 km of ASC Centre (North) for timely supply
Experience in SITC of similar equipment or RO systems
Compliance with standard government procurement documentation and certifications
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | MANAS INFRA PROJECTS(MSE) Under PMA Winner | ₹24,000 | Item Categories : Presser Indicator Flow Meter,Pressure Indicator Adopter,Filter Housing,RO Pumping Motor 0.75Hp,The |
| L2 | LIFEWAY ENGINEERING CORP PRIVATE LIMITED (MSE) Under PMA | ₹30,540 | Item Categories : Presser Indicator Flow Meter,Pressure Indicator Adopter,Filter Housing,RO Pumping Motor 0.75Hp,The |
| L3 | LIFE ENGINEERING CONSORTIUM (MSE) Under PMA | ₹40,640 | Item Categories : Presser Indicator Flow Meter,Pressure Indicator Adopter,Filter Housing,RO Pumping Motor 0.75Hp,The |
🎉 L1 Winner
MANAS INFRA PROJECTS(MSE) Under PMA
Final Price: ₹24,000
Start
18-Sep-2026, 10:00 am
End
19-Sep-2026, 10:00 am
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
11
Category
Armature Coil Assembly
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Presser Indicator Flow Meter , Pressure Indicator Adopter , Filter Housing , RO Pumping Motor 0.75Hp , The above mentioned RO repair removes the damage , Armature Coil Assembly , Filed Coil Assembly , Carbon Plate Holder , Carbon , The above mentioned printer repairs removes tha all parts , The mentioned wet grinding machine repair removes the all
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Bangalore
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bangalore | Bangalore | - | - | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Presser Indicator Flow Meter
AS PER RFP
Pressure Indicator Adopter
AS PER RFP
Filter Housing
AS PER RFP
RO Pumping Motor 0.75Hp
AS PER RFP
The above mentioned RO repair removes the damage
AS PER RFP
Armature Coil Assembly
AS PER RFP
Filed Coil Assembly
AS PER RFP
Carbon Plate Holder
AS PER RFP
Carbon
AS PER RFP
The above mentioned printer repairs removes tha all parts
AS PER RFP
The mentioned wet grinding machine repair removes the all
AS PER RFP
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Presser Indicator Flow Meter | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 2 | Pressure Indicator Adopter | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 3 | Filter Housing | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 4 | RO Pumping Motor 0.75Hp | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 5 | The above mentioned RO repair removes the damage | AS PER RFP | 1 | job | oicrepair | 45 | |
| 6 | Armature Coil Assembly | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 7 | Filed Coil Assembly | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 8 | Carbon Plate Holder | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 9 | Carbon | AS PER RFP | 1 | nos | oicrepair | 45 | |
| 10 | The above mentioned printer repairs removes tha all parts | AS PER RFP | 1 | job | oicrepair | 45 | |
| 11 | The mentioned wet grinding machine repair removes the all | AS PER RFP | 1 | job | oicrepair | 45 |
Extended Deadline
31-Aug-2026, 5:30 am
Opening Date
31-Aug-2026, 6:00 am
GST certificate
PAN card
Experience certificates
Financial statements
EMD/Security deposit (as applicable in tender)
Technical bid documents
OEM authorizations (if required)
Any certificates requested in Bid Document, ATC, Corrigendum
Key insights about KARNATAKA tender market
Bidders should verify organization details, submit GST and PAN, experience certificates, financials, EMD, and technical bid documents as per Terms and Conditions. Ensure SITC scope is clearly priced and delivery aligns with the 50 km local supply requirement. Include OEM authorizations if mandated.
Required documents include GST registration, PAN, experience certificates, financial statements, EMD evidence, technical bid documents, OEM authorizations, and any certificates called out in ATC/Corrigendum. Upload all requested certificates to avoid rejection.
Delivery is tied to the original delivery order; option clauses allow up to 25% quantity variation with adjusted delivery time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
While the tender data lacks explicit standards, bidders should prepare IS/ISO certifications and OEM authorizations as applicable, and upload any certificates requested in the Bid Document, ATC, and Corrigendum, to ensure compliance.
Yes, bidders must provide a local registered address within 50 km of ASC Centre (North) to facilitate timely supply and service responsiveness, as specified in the buyer terms.
Scope includes Supply, Installation, Testing and Commissioning of listed items, covering presser indicator flow meters, RO components, coil assemblies, carbon parts, filter housing, and repairs of wet grinding machine parts, with a single SITC contract.
The Purchaser may increase or decrease quantity up to 25% at contract placement and during the currency, with delivery extensions calculated accordingly and ensuring minimum 30 days for added work.
Payment terms are not specified in the available data; bidders should await formal bid documents to confirm milestones, advance, and post-delivery payment terms tied to SITC milestones.