SERVICING OF WATER PURIFIER,REPAIR OF ROTI MAKER MACHINE,REPAIR OF WATER MOTOR,REPAIR OF AIR CONDIT
Indian Army
Progress
Quantity
11840
Category
COMPREHENSIVE REPAIR MAINTENANCE OF WATER CHEMICAL
Bid Type
Two Packet Bid
A tender has been published for Indian Army COMPREHENSIVE REPAIR MAINTENANCE OF SWIMMING POOL, COMPREHENSIVE REPAIR MAINTENANCE OF WATER TESTING, COMPREHENSIVE REPAIR MAINTENANCE OF WATER CHEMICAL, COMPREHENSIVE REPAIR MAINTENANCE OF SUPPLY and DISTRIBUTION, COMPREHENSIVE REPAIR MAINTENANC, COMPREHENSIVE REPAIR MAINTENANCE in HYDERABAD, TELANGANA. Quantity: 11840 by. Submission Deadline: 12-08-2025 12: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Air Force
JODHPUR, RAJASTHAN
Indian Air Force
NASHIK, MAHARASHTRA
Board Of Radiation And Isotope Technology
CHITTORGARH, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | COMPREHENSIVE REPAIR MAINTENANCE OF SWIMMING POOL | M&L for pressure washing and cleaning thoroughly the bottom floor and inside walls of 300000 gallons capacity swimming pool after draining out of water including cleaning of joints of tiles of the pool by suitable mechanical means using mild hydrochloric acid for fungus or algae free surfaces including removing out all dirt and foreign matters if any from the pool to a distance not exceeding 50m complete to the satisfaction of the Engineer in charge all as specified and directed. Notes a. Size of the Swimming Pool is 50m length x 25m width and depth varying from 1.2m to 3m Approx. b. Draining of water from the Swimming pool shall be made by the department. | 1 | each job | ageusec | 45 |
| 2 | COMPREHENSIVE REPAIR MAINTENANCE OF WATER TESTING | M&L for pressure washing and cleaning thoroughly the bottom and inside walls of balancing tank of the swimming pool after draining out of water by suitable mechanical means using bleaching powder including removing of sludge, slurry, foreign matters if any from the tank to a distance not exceeding 50m complete to the satisfaction of the Engineer in charge all as specified and directed. Notes (a) Size of the Balancing tank is 3.6m length x 2.9m width and depth 4m (Approx). (b) Draining of water from the Balancing tank shall be made by the department. | 1 | each job | ageusec | 45 |
| 3 | COMPREHENSIVE REPAIR MAINTENANCE OF WATER TESTING | M&L for Filter media refilling of Quartz sand sewed as per the standards and details are as Fine sand 16X32 mesh of 450 mm depth equal to 2X7.0MT | 18 | each job | ageusec | 45 |
| 4 | COMPREHENSIVE REPAIR MAINTENANCE OF SWIMMING POOL | M&L for Romoving of damaged nozzles and re fixing of new nozzles and complete to the satisfaction of the Engineer in charge all as specified and directed. | 200 | each | ageusec | 45 |
| 5 | COMPREHENSIVE REPAIR MAINTENANCE OF WATER CHEMICAL | M&L for Removing of existing channel and re fixing of new channel made of MS 3mm thick sheet with internal of holes for equal distribution and complete to the satisfaction of the Engineer-in-charge all as specified and directed. | 1 | each job | ageusec | 45 |
| 6 | COMPREHENSIVE REPAIR MAINTENANCE OF SUPPLY and DISTRIBUTION | Labour charges washing of filter media (pebbles) and re filling of pebbles and new media and complete to the satisfaction of the Engineer-in-charge all as specified and directed. | 1 | each job | ageusec | 45 |
| 7 | COMPREHENSIVE REPAIR MAINTENANC | M&L for inside painting of filters two coat of red oxide and two coats of epoxy and complete to the satisfaction of the Engineer-in-charge all as specified and directed. | 1 | each job | ageusec | 45 |
| 8 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only PVC flexible suction and delivery hoses, ISI marked incorporating a rigid PVC spiral as an integral part of the soft PVC wall green ribbed colour of 50 mm dia, working pressure at the rate 6 kg Sqcm complete all as specified and directed. | 100 | rm | ageusec | 45 |
| 9 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only liquid amonia in 450 ml PVC bottle complete all as specified and directed. | 3 | each bottle | ageusec | 45 |
| 10 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only free chlorine testing kit paper strips (Colome metirc TMG) for detection levels (0.05, 0.1, 0.2, 0.4, 0.6, 0.8, 1.2, 1.5, 2.0, 4.0, 6.0 ppm (Mgle) test time 40 seconds having each bottle of 50 test strips complete all as specified and directed. | 6 | each set | ageusec | 45 |
| 11 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only TCCA 90percentage Chlorine (Trichloroisocyanuric Acid), effective content of chlorine percentage 90, Content of water percentage 0.5, PH Value of 1 percent Solution 2.7 to 3.3, Granular Chlorine or Tablet in packing of 50 kg complete all as specified and directed. | 1,500 | per kg | ageusec | 45 |
| 12 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only non ferric alum confirming to IS complete all as specified and directed. | 1,600 | kg | ageusec | 45 |
| 13 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only copper sulfate confirming to IS complete all as specified and directed | 200 | kg | ageusec | 45 |
| 14 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only Hydrochloric acid industrial grade ( in 40 ltr Container) complete all as specified and directed. | 200 | ltr | ageusec | 45 |
| 15 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only soda ash confirming to IS complete all as specified and directed. Make for item Nos 9 to 15. ACL, Sriram, Sree Rayalaseema, Pearl Filler, Declibac or equivalent make as approved. (a) The manufacturer, shall comply and guarantee the authenticity of the product by providing Test Certificate with Hologram, which will be provided by the Authrorised Distributor at the distribution point for each Batch of Product delivered on their letter head. (b) The manufacturer will afix its hologram on each and every drum, if the said product is delivered without the said hologram and or its seen to be tampered, then the product can be discarded as spurious. | 100 | kg | ageusec | 45 |
| 16 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only water hardness test kit digital type (PH test kit) complete all as specified and directed. | 1 | each | ageusec | 45 |
| 17 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only nylon rope of size 1inch dia suitable for suction sweeper complete all as specified and directed. | 100 | rm | ageusec | 45 |
| 18 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only blue plastic triangular vacuum head including butterfly connection for swimming pool, size as per site requirement complete all as specified and directed. | 3 | each | ageusec | 45 |
| 19 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only flexible vacuum head 8 wheel pipe diameter 40mm dia and no of wheel 8 nos including butterfly connection for swimming pool, size as per site requirement complete all as specified and directed. | 2 | each set | ageusec | 45 |
| 20 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only Leaf Net, deep bag net made in polypropelene and white polyester netting including butterfly connection for swimming pool, size as per site requirement complete all as specified and directed. | 3 | each | ageusec | 45 |
| 21 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only surface net made in polypropelene and white polyester netting butterfly connection size as per site requirement complete all as specified and directed. | 4 | each | ageusec | 45 |
| 22 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only extensionable handles for cleaning attachments in anodized aluminium which can be adapted to the entire range of cleaning equipment, brushes, leaf skimmers and scoops 4.8 mtrs long complete all as specified and directed. | 2 | each | ageusec | 45 |
| 23 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only transparent blue plastic vacuum hose 2 (inch) dia, 30 mtrs long including hose cuffs for connection to suction inlets complete all as specified and directed. | 155 | rm | ageusec | 45 |
| 24 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only of curved brushes made in polypropelene for pool basins and scum liners as per site requirement complete all as specified and directed. | 5 | each | ageusec | 45 |
| 25 | COMPREHENSIVE REPAIR MAINTENANCE | Supply only straight brushes made in polypropelene for pool basins and scum liners as per site requirement complete all as specified and directed.Make for item Nos 16 to 25. AUSTIN AQUAPAC ASTRAL POOL KRIPSOL | 5 | each | ageusec | 45 |
| 26 | COMPREHENSIVE REPAIR MAINTENANCE | S&F in replacement of old unserviceable cable PVC insulated Aluminium conductor of size 4 sqmm, Two core, cut to length all as required at site with thimbles of appropriate size, drawn into conduit/pipe fixed to wall or pole for connection of energy meters to DB etc complete all as specified and directed. | 100 | rm | ageusec | 45 |
| 27 | COMPREHENSIVE REPAIR MAINTENANCE | S&F in replacement of old unserviceable cable PVC insulated Aluminium conductor of size 6 sqmm, Two core, cut to length all as required at site with thimbles of appropriate size, drawn into conduit/pipe fixed to wall or pole for connection of energy meters to DB etc complete all as specified and directed. | 100 | rm | ageusec | 45 |
| 28 | COMPREHENSIVE REPAIR MAINTENANCE | S&F in repair CI non raising type sluice valve both ends flanged with CI body, ISI marked, IS 14846, pressure PN 1.6 with SS spindle, clamps and check nuts, operating hand wheel as in replacement of unserviceable sluice valves of any type complete all as specified and directed for the following sizes. | 1 | one job | ageusec | 45 |
| 29 | COMPREHENSIVE REPAIR MAINTENANCE | 100 mm bore. | 4 | each | ageusec | 45 |
| 30 | COMPREHENSIVE REPAIR MAINTENANCE | 150 mm bore. | 6 | each | ageusec | 45 |
| 31 | COMPREHENSIVE REPAIR MAINTENANCE | S&F in repair CI Non Return Valve both ends flanged with CI body, ISI marked, IS 14846, pressure PN 1.6 as in replacement of unserviceable sluice valves of any type complete all as specified and directed for the following sizes. | 1 | one job | ageusec | 45 |
| 32 | COMPREHENSIVE REPAIR MAINTENANCE | 80 mm bore. | 2 | each | ageusec | 45 |
| 33 | COMPREHENSIVE REPAIR MAINTENANCE | 100mm bore. | 2 | each | ageusec | 45 |
| 34 | COMPREHENSIVE REPAIR MAINTENANCE | S&F in repair G M foot valve with one ends flanged with CI body, ISI marked, IS 14846, pressure PN 1.6 as in replacement of unserviceable foot valve of any type complete all as specified and directed for the following sizes. | 1 | one job | ageusec | 45 |
| 35 | COMPREHENSIVE REPAIR MAINTENANCE | 80 mm bore. | 1 | each | ageusec | 45 |
| 36 | COMPREHENSIVE REPAIR MAINTENANCE | 100mm bore. | 1 | each | ageusec | 45 |
| 37 | COMPREHENSIVE REPAIR MAINTENANCE | Supply and distribution in various Pump house and MES facility as required only Calcium Hypochlorite calcium based high strength granular chlorine having 65 to 70 percentage chlorine content packed in 45 Kgs PVC sealed container, superior quality suitable for treatment of drinking water and swimming pool (much more stable than chlorine gas, bleaching powder and sodium hypochlorite) all as specified and directed by Engr in Charge. Note. as per SoW | 7,400 | kg | ageusec | 45 |
| 38 | COMPREHENSIVE REPAIR MAINTENANCE | Collection of drinking water samples from trishul line pump ,haig line pump , swimming Pool and randomly at any location of station and carry out following test from Govt Laboratory, NABL approved laboratory complete all as specified and as directed by Engr in Charge . (a) Colour (Hazen units ) (b) Turbidity (NTUS) (c) Odour (d) PH at Degree celsius (e) Electrical Conductivity at 25 Degree clelsius (f) Total Dissolved (g) Alkalinity - Phenolpthalein, Total alkalinity (h) Total hardness (as sCaC03) (j) Calcium Hardness (As CaC03), (k) Magnesium hardness (as CaC03), Calcium (as Ca), Max (l) Magnesium (as Mg), Max (m) Ammonical Nitrogen (n) Nitrite (As N2), Nitrate as NO3, Sulphate as SO4, Chloride (As C1), Fluoride (As F) Max, Iron (As Fe), Max, including Bacteriological Analysis (Redidual Chlorine mg per liter, Total coliform bacteria, Faecal coliform , ESCH) complete all as specified and directed . Note. The Item Re execute just after one month for same location or as per GE direction and User recommendation. | 6 | each job | ageusec | 45 |
| 39 | COMPREHENSIVE REPAIR MAINTENANCE | Supply & Installation of Advance encapsulated compound based CPRI tested maintenance free, pipe in pipe Technology upgraded (Zinc & Alloy Coated), ZINC COATED (80 to 100) microns with pure Zinc (99.9 percentage) & ALLOY COATING (200 to 250) microns. Earthing System confirming IS 3034. The outer and inner pipe should be 48.3mm & 26.4mm 2mtrs Length, Zinc coated with additional special Alloy coating 300mm on the topside for additional protection of the Terminal. The annular space between the pipes being filled up with COMPACT FILL (CF) (Crystalline Conductive Compound). The COMPACT FILL (CF) mixture which is machine pressed in the pipes should not disintegrate or collapse when outer pipe corrodes. Further as per SoW | 2 | each | ageusec | 45 |
| 40 | COMPREHENSIVE REPAIR MAINTENANCE | S&F Chemical Dosing Pump of Plunger type having Capacity of pump 3 to 3000 LPH having pressure 230 kg cm2. comprising of Following part. (a) Dosing Tank, (b) Agitator with motor, (c) Level Guage for Dosing tank, (d) Caliberation Pot, (e) High Pressure Injection Quill ( 02 Nos 01 Working and 01 for Stand By. All Fittings and fixture like valves, Pipe , Strainer and connected item as per manufacturer Specification. Make. Verito Engineering, Grundfos, Milton Roy. | 1 | each | ageusec | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | KIRAN ASSOCIATES Under PMA | - | 11-08-2025 12:47:48 | Qualified |
| 2 | MAVEE SYNDICATE Under PMA | - | 11-08-2025 16:41:53 | Qualified |
| 3 | NINDI BUILDERS Under PMA | - | 11-08-2025 18:25:36 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | MAVEE SYNDICATE(MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹43,28,623 | Item Categories : COMPREHENSIVE REPAIR MAINTENANCE OF SWIMMING POOL,COMPREHENSIVE REPAIR MAINTENANCE OF WATER TESTING |
| L2 | KIRAN ASSOCIATES (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹43,99,075 | Item Categories : COMPREHENSIVE REPAIR MAINTENANCE OF SWIMMING POOL,COMPREHENSIVE REPAIR MAINTENANCE OF WATER TESTING |
| L3 | NINDI BUILDERS (MSE,MII)( MSE Social Category:General ) Under PMA | ₹46,40,650 | Item Categories : COMPREHENSIVE REPAIR MAINTENANCE OF SWIMMING POOL,COMPREHENSIVE REPAIR MAINTENANCE OF WATER TESTING |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS