The Director General Of National Cadet Corps (NCC) invites bids for a mobile toilet with water tank to be deployed in CUDDAPAH, ANDHRA PRADESH 516001 under the Department of Defence. The tender references quantity flexibility up to 25% and requires pre-approval of Detailed Design Drawings. The contract includes an option for extended delivery time with a calculated schedule and a requirement for AMC after warranty. No BOQ items are listed, indicating a design-and-supply scope with post-warranty service expectations. The award process mandates compliance with internal design approval timelines and supplier risk checks.
Product/service: mobile toilet with water tank
Delivery flexibility: up to 25% quantity variation
Design approval: Detailed Design Drawings due within 5 days of award; modification list within 5 days
Warranty/AMC: 1-year post-warranty AMC obligation
BOQ: No items listed in BOQ; scope inferred from drawings and delivery
25% contract quantity variation allowed
5-day design submission and 5-day approval window
Bidder must provide PAN, GSTIN and EFT mandate
Turnover and financial stability documentation required
1-year AMC post-warranty commitment
Not specified in data; final terms to be part of contract after drawings approval
Delivery commences from last date of original delivery order; extended time rules apply with 30-day minimum
Not detailed in data; penalties typically align with delivery delays post-approval
Not under liquidation or bankruptcy; provides undertaking
Turnover evidence for last 3 years as per bid document
Must submit PAN, GSTIN, and EFT mandate; maintain vendor code
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
mobile toilet with water tank
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Cuddapah
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Cuddapah | Cuddapah | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
21-Oct-2026, 1:30 pm
Opening Date
22-Oct-2026, 1:30 pm
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Audited Balance Sheets for last 3 years or CA/Cost Accountant turnover certificate
Certificate of non-liquidation/bankruptcy undertaking
OEM authorization (if applicable) and technical bid documents
Vendor Code Creation documents (as required by buyer)
Key insights about ANDHRA PRADESH tender market
To bid, ensure you meet turnover requirements, provide audited financials or CA/Cost Accountant certificate, and submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate. Prepare Detailed Design Drawings within 5 days of award and obtain buyer approval within 5 days; be ready for 25% quantity variation.
Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate; provide three-year turnover evidence via audited balance sheets or CA/Cost Accountant certificate; include non-liquidation undertaking; provide OEM authorizations if applicable and any technical bid documents requested by NCC.
Within 5 days of award, bidders must submit Detailed Design Drawings to the buyer. The buyer will approve or list modifications within 5 days; supply must follow approved drawings. Delay in buyer approval extends the delivery period with no LD for buyer-caused delays.
The purchaser may increase the quantity by up to 25% of the bid quantity at contract placement and during currency at contracted rates. The extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
The bidder/OEM must undertake AMC services for 1 year after warranty expiry. Terms for AMC payment, response times, and coverage will be specified in the final contract post drawings approval.
Applicants must have no liquidation or bankruptcy, provide turnover evidence for the last 3 years, and submit PAN, GSTIN, cancelled cheque, and EFT mandate. OEM authorizations and experience in mobile sanitation equipment may improve eligibility per bid details.
Delivery terms start after the last date of the original delivery order. If drawings approval delays occur, the delivery period is adjusted accordingly with no LD during buyer-caused delays; the 30-day minimum applies for extended periods.
The tender data does not specify explicit standards; bidders should align with general compliance requirements, ensure GST/PAN validity, and be prepared to provide OEM authorizations and technical bid documents; detailed standards may be clarified during contract finalization.