TenderDekho Logo
Closed GEM

Tender Notice for Civil-1,Civil-2,Civil-3,Civil-4,Civil-5,Civil-6,Civil-7,Civil-8,Civil-9,Civil-10,Civil-11,Tower-1,T in AMBALA, HARYANA

Bid Publish Date

08-Jul-2026, 12:15 pm

Bid End Date

07-Aug-2026, 3:00 pm

Value

₹3,94,00,000

Progress

RA
Issue08-Jul-2026, 12:15 pm
Reverse Auction28-Oct-2026, 6:00 pm
AwardPending

Public procurement opportunity for Bhakra Beas Management Board Civil-1, Civil-2, Civil-3, Civil-4, Civil-5, Civil-6, Civil-7, Civil-8, Civil-9, Civil-10, Civil-11, Tower-1, Tower-2, Tower-3, Tower-4, Tower-5, Tower-6, Tower-7, Tower-8, Tower-9, Tower-10, Tower-11, Tower-12, Tower-13, Tower-14, Tower-15, Tower-16, Tower-17, Tower-18, Tower-19, Tower-20, Tower-21, Tower-22, Tower-23, Tower-24, Tower-25, OPGW-1, OPGW-2, OPGW-3, OPGW- 4, OPGW-5, OPGW-6, Erection 1, Erection 2 in AMBALA, HARYANA. Quantity: 19287 issued by. Submission Deadline: 07-08-2026 15: 00: 00. View full details and respond.

Advertisement

Authority & Contact

Department

Bhakra Beas Managemet Board

Office Name

Bhakra Beas Management Board, Chandigarh

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

28-Oct-2026, 6:00 pm

End

30-Oct-2026, 5:00 pm

Duration: 47 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

19287

Category

Tower-1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

119

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Civil-1 , Civil-2 , Civil-3 , Civil-4 , Civil-5 , Civil-6 , Civil-7 , Civil-8 , Civil-9 , Civil-10 , Civil-11 , Tower-1 , Tower-2 , Tower-3 , Tower-4 , Tower-5 , Tower-6 , Tower-7 , Tower-8 , Tower-9 , Tower-10 , Tower-11 , Tower-12 , Tower-13 , Tower-14 , Tower-15 , Tower-16 , Tower-17 , Tower-18 , Tower-19 , Tower-20 , Tower-21 , Tower-22 , Tower-23 , Tower-24 , Tower-25 , OPGW-1 , OPGW-2 , OPGW-3 , OPGW- 4 , OPGW-5 , OPGW-6 , Erection 1 , Erection 2

Pre-Bid & Qualification

Pre-Bid Date

29-07-2026 15:00:00

Pre-Bid Venue

Construction Division, BBMB, Dhulkote, Ambala City

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Ambala

Delivery Pincodes

134007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ravinder xen400kvtldkt134007,400 KV T/L Division, BBMB, Dhulkote, Ambala City.AmbalaHaryana1340074054180-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9569637.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 44 Items Sign in for GEM prices

#1

Civil-1

Earth work in excavation of foundations of bridges culverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around a. For ordinary gravel soil involving pick work L_R Ref no 6.7a of Pb CSR2020

4,054 cum Delivery: 180 days
#2

Civil-2

Cement concrete 1_4_8 With stone aggregate 40mm gauge ii) mixing by mechanical means using concrete mixer volumetric type T_R Ref no. 10.11 b ii of Pb CSR 2020

63 cum Delivery: 180 days
#3

Civil-3

Cement concrete 1_3_6 with stone ballast or shingle ii) mixing by mechanical means using concrete mixer volumetric type T_R Ref no. 10.12 a ii of Pb CSR2020

23 cum Delivery: 180 days
#4

Civil-4

Fixing, Leveling , Centering, Alignment and setting of stubs complete in all respect satisfaction of Engineer in Charge Lumsum N_S Item

5 job Delivery: 180 days
#5

Civil-5

Cold Twisted Deformed Ribbed_Tor steel Bar Bars Fe 500 grade as per IS _1786_2008 for RCC works, where not included in the complete rate of RCC including bending & placing in position in complete T_R Ref no. 18.18 of Pb CSR2020

557 qtl Delivery: 180 days
#6

Civil-6

Shuttering for Faces of concrete foundations and foundation beam and plinth beam (vertical or battering Ref no. 9.1 of Pb CSR2020

207 sqm Delivery: 180 days
#7

Civil-7

Centering and shuttering for columns (Square or rectangular or polygonal in plain Ref no. 9.4 of Pb CSR2020

261 sqm Delivery: 180 days
#8

Civil-8

Reinforced cement concrete M_20 mechanically batch mixed using batch type concrete mixer as by IS_1791 and vibrated by needle vibrate but excluding steel reinforcement centring and shuttering in foundation and plinth. Ref no. 10.15 of Pb CSR2020

503 cum Delivery: 180 days
#9

Civil-9

Extra for pumping charges of Batch Mix Concrete _ Ready mix conrete work RMC Ref Pb CSR 2020 item no. 10.46

499 cum Delivery: 180 days
#10

Civil-10

Extra for using admixture in designed mix concrete. Ref Pb CSR 2020 item no. 10.50

499 cum Delivery: 180 days
#11

Civil-11

Extra for carriage of RMC_batch mixed concrete with transit mixture beyond 1st km. Ref Pb CSR 2020 item no. 10.47

499 cum per km Delivery: 180 days
#12

Tower-1

Supply of Stubs of 220KV M_C Tower type NMD KRR Design Weight 1901.28KG HT and 720KG MS

4 set Delivery: 180 days
#13

Tower-2

Supply of Stubs of 2D_60 plus 6mtr. Extn. Type tower Weight 814.39 KG MS

1 set Delivery: 180 days
#14

Tower-3

Supply of Tower Body of 220KV M_C Tower type NMD plus 0 Tower Body KRR Design Weight 16094.64 KG HT and 8678.43 KG MS

1 no Delivery: 180 days
#15

Tower-4

Supply of Tower Body including Extension of 220KV M_C Tower type NMD plus 6 mtr. Extn. KRR Design Weight 18905.99 KG HT and 11081.5 KG MS

2 no Delivery: 180 days
#16

Tower-5

Supply of Tower Body including Extension of 220KV M_C Tower type 15 NMD plus 9 mtr. Extn. KRR Design Weight 20895.54 KG HT and 13058.32 KG MS

1 no Delivery: 180 days
#17

Tower-6

Supply of Tower Body including Extension of 2D-60 plus 6mtr. Extn. Type tower Weight 14853.84 KG MS

1 no Delivery: 180 days
#18

Tower-7

Supply of GI Nuts and Bolts including washers of various size

6,316 kg Delivery: 180 days
#19

Tower-8

Earthing Arrangement of Towers Complete in all respect

7 no Delivery: 180 days
#20

Tower-9

Danger Plate

5 no Delivery: 180 days
#21

Tower-10

Number plate

5 no Delivery: 180 days
#22

Tower-11

Phase Plate set of 3

10 no Delivery: 180 days
#23

Tower-12

Circuit Plate set of 2

5 no Delivery: 180 days
#24

Tower-13

Anti climbing Device ACD with concertrina wire

5 no Delivery: 180 days
#25

Tower-14

ACSR Conductor Goat 0.3 sq inch Copper Eq.

3,450 mtr Delivery: 180 days
#26

Tower-15

220KV 160KN Polymer string insulator

76 no Delivery: 180 days
#27

Tower-16

220KV 120KN Polymer string insulator

15 no Delivery: 180 days
#28

Tower-17

Double Tension Hardware fittings for ACSR GOAT Conductor including Arcing Horns complete in all respect

15 no Delivery: 180 days
#29

Tower-18

Single Tension Hardware fittings for ACSR GOAT Conductor including Arcing Horns complete in all respect

53 no Delivery: 180 days
#30

Tower-19

Single Suspension/Pilot Hardware fittings for ACSR GOAT Conductor including Arcing Horns and balancing weight etc. complete in all respect

15 no Delivery: 180 days
#31

Tower-20

Straight Joint for ACSR GOAT 0.3 sq. inch Copper Eq.

12 no Delivery: 180 days
#32

Tower-21

Performed Armored set for ACSR GOAT 0.3 sq. inch Copper Eq.

15 set Delivery: 180 days
#33

Tower-22

Vibration Damper for ACSR GOAT 0.3 sq. inch Copper Eq.

125 no Delivery: 180 days
#34

Tower-23

Bird Guard

30 no Delivery: 180 days
#35

Tower-24

Ladder Step bolts with washers.

500 no Delivery: 180 days
#36

Tower-25

Form Box

2 no Delivery: 180 days
#37

OPGW-1

24 Fibre DWSM OPGW fibre optic cable

1,380 mtr Delivery: 180 days
#38

OPGW-2

OPGW Tension Fitting Complete

12 set Delivery: 180 days
#39

OPGW-3

OPGW Vibration Damper

24 no Delivery: 180 days
#40

OPGW-4

OPGW Joint Box

3 no Delivery: 180 days
#41

OPGW-5

Down Lead Clamp

24 no Delivery: 180 days
#42

OPGW-6

Stringing and installation of OPGW

1 job Delivery: 180 days
#43

Erection 1

Erection of towers, stringing and sagging of Conductors, including tack welding of bolts _about 1250 bolts_Complete in all respect

1 job Delivery: 180 days
#44

Erection 2

Dismantlement of 02 towers including all necessary items and conductor including transportation of dismantled material from site to BBMB store Jalandhar.

1 job Delivery: 180 days

Categories 70

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement