Bid Publish Date
16-Oct-2026, 1:03 pm
Bid End Date
06-Nov-2026, 2:00 pm
Location
Progress
The Directorate General Of Lighthouses And Lightships in Krishna, Andhra Pradesh invites bids for the Supply, Installation, Testing and Commissioning of a 3.6 KW off-grid solar system. The scope includes end-to-end deployment at the coastal facility, with delivery, installation and commissioning at the specified site. The procurement uses a flexible quantity clause up to 25% increase during contract execution. The ATC emphasizes serviceability, timely rectification, and adherence to a fixed delivery cadence anchored to the original delivery schedule. This opportunity targets vendors capable of complete turnkey solar installations with warranty compliance and post-warranty support. The project value guidance is implied by the scope and service obligations, with a structured penalty mechanism for delays and defect rectification. The tender requires bidders to align with the purchaser’s right to adjust quantities and delivery windows, and to ensure seamless integration with existing infrastructure.
Product/service names: 3.6 KW off-grid solar system
Quantity: baseline quantity not disclosed; quantity flexibility up to 25%
EMD/Est. value: not specified in data; penalties reference contract value
Experience: not specified; ATC requires SITC capability
Quality/standards: IS/IEC alignment not explicitly stated
Warranty: 7 days for defect rectification response; 0.5% weekly penalty
Option Clause: quantity may vary by ±25% during contract
Delivery extension: up to 6 months without extra cost
Warranty penalties: 0.5% per week; cap at 10% of contract value
Payment terms defined in ATC; penalties may be recovered from PBG or via buyer
Delivery period begins after final order; option to extend in line with quantity changes
0.5% weekly penalty for delays; cumulative cap 10% of contract value
Must submit PAN card, GSTIN, cancelled cheque, EFT mandate
Capability to deliver SITC of solar systems at coastal facilities
Compliance with ATC terms on quantity variation and delivery extensions
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
Past Performance
60 %
Warranty Period
7 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply, Installation, Testing and Commissioning of 3.6 KW Off grid solar system towards dedicated su
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Krishna
Delivery Pincodes
521002
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| K Vishwaroopa Chary | 521002,Navigational Assistant I, Machilipatnam Lighthouse, Beach Road, Tallapalam Post, Via Chilakalapudi | Krishna | Andhra Pradesh | 521002 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about ANDHRA PRADESH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and vendor code creation documents as part of bid submission. Ensure GST compliance and bank details are verified, aligning with ATC requirements. Additional technical certificates may be requested during evaluation.
The purchaser may increase order quantity by up to 25% during contract execution. Delivery timelines adjust proportionally; minimum extension equals 30 days, and the extension may extend to the original period, subject to ATC terms and price stability.
Defect rectification must occur within 7 days of notification. If delayed, a penalty of 0.5% of unit price is charged weekly, capped at 10% of total contract value, with potential PBG adjustment or recovery for subsequent service needs.
Location is Krishna, Andhra Pradesh. Scope includes Supply, Installation, Testing and Commissioning of a 3.6 KW off-grid solar system for a coastal lighthouse facility, with full SITC responsibilities and subsequent maintenance obligations during warranty.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate to establish bidder code. This step is necessary before bid submission, alongside standard SITC documentation and ATC-compliant declarations.
The buyer reserves the right to postpone supply by up to 6 months from finalization date without any additional cost implications, as per ATC conditions.
The tender references generic SITC requirements; explicit standards (e.g., IS 550 or ISO) are not clearly stated in the data provided, so bidders should verify alignment with typical solar power installation norms during bid submission.