Progress
Indian Overseas Bank invites bids for an Online UPS 10 KVA with Battery conforming to IS 16242 (Part 1) in Kamrup, Assam. The scope covers Supply, Installation, Testing, Commissioning (SITC) and operator training, with statutory clearances if required. Delivery location is the bank’s Agartala office, Tripura, and the contract may include up to 25% quantity variation at contracted rates. The vendor must ensure OEM support in India, a 5-year warranty, and post-warranty service capabilities. The bid requires compliance with the option clause, delivery timelines, and after-sales service commitments.
Online UPS 10 KVA with Battery
IS 16242 (Part 1) compliant
5-year OEM warranty
3-day service rectification window
Agartala, Tripura installation site
Quantity variation up to 25%
EMD (if applicable) or stated alternative submission
Delivery & installation at bank site with SITC scope
Up to 25% quantity variation at contracted rates
Payment terms are not detailed; bidders should expect standard bank terms and ensure alignment with delivery milestones and SITC completion
Delivery period initiation from last date of original delivery order; extended duration proportional to increased quantity with minimum 30 days
Delay penalties: 0.5% of unit price for each week of delay in service/rectification
Authorized seller or OEM with registered Indian office for after-sales support
Experience in SITC of UPS systems of at least 10 kVA
Financial capability to handle multi-location installation and maintenance
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
1
Past Performance
20 %
Warranty Period
5 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kamrup Metro
Delivery Pincodes
781022
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ritesh Kumar Paswan | 781022,Radhika Dee Bee Grande 2nd Floor, Six Mile Panjabari Road Guwahati, Assam Pin-781022 | Kamrup Metro | Assam | 781022 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar UPS SITC projects
Financial statements (last 2-3 years)
EMD documents (if applicable) or stated alternative
Technical bid documents demonstrating IS 16242 (Part 1) compliance
OEM authorization / dealership certificate confirming Indian after-sales support
Warranty certificates for UPS model proposed
Service center details near consignee destinations
Key insights about ASSAM tender market
Bidders must submit GST, PAN, experience certificates, financials, OEM authorization, and warranty certificates; ensure IS 16242 (Part 1) compliance and provide SITC plan with installation training details. Include service network maps and delivery schedule.
Required documents include GST registration, PAN, two to three years of financial statements, UPS OEM authorization, IS 16242 (Part 1) compliance proof, installation/commissioning experience certificates, and warranty certificates; submit service center details near Agartala.
The product must be IS 16242 (Part 1) compliant; ensure 5-year OEM warranty; provide detailed SITC plan, including battery compatibility, efficiency, protection features, and fault diagnostics aligned with Indian after-sales service.
Delivery period begins from the last date of the original delivery order; option to extend with up to 25% quantity change; minimum extension rule applies with a minimum 30 days, based on order variation.
Payment terms are not explicitly stated; bidders should align with standard government bank terms, ensuring SITC milestones are tied to payment release and warranty activation after final acceptance.
A 5-year OEM warranty is required from final acceptance or after SITC completion; certificates must be provided at delivery; service centers must be near consignee destinations with documented support.
Scope includes Supply, Installation, Testing, Commissioning of the Online UPS 10 KVA with Battery, training operators, and obtaining any required statutory clearances; ensure comprehensive SITC planning and milestones.
Defect notification must be addressed with corrective action within 3 days; failure to meet this window incurs penalties, with 0.5% of unit price per week for delays.