Indian Army Department of Military Affairs UG Bunker & Security Systems Tender Jammu 2026 – 43 Grade OPC, Video Camera Entry, HEPA, Solar Panels

Bid Publish Date

24-Sep-2026, 7:00 pm

Bid End Date

05-Oct-2026, 6:00 pm

EMD

₹3,42,000

Progress

Issue24-Sep-2026, 7:00 pm
AwardPending

Tender Overview

Organization: Indian Army, Department of Military Affairs. Location: Jammu, Jammu & Kashmir 180001. Product/Service: supply, installation, testing and commissioning of UG bunker components plus related systems including video camera based entry system, HVAC (hot/cold air), tunnel ventilation, high efficiency heat exchanger, fire alarm system, HEPA and activated carbon filtration, pressurized oxygen tank, solar panels, ducting, lighting, modular storage, GI components, lockable compartments, and related hardware. Estimated value not disclosed; EMD: ₹342,000. Delivery site: AT NARIAN -QTY 01; AT KALAL -QTY 01, JAMMU & KASHMIR. The contract requires Detailed Design Drawings within 7 days of award, with Buyer confirmation or modification list within the same window, otherwise delivery timing adjusts without LD. Unique scope includes OEM/authorized reseller installation and mandatory non-disclosure. The procurement emphasizes end-to-end supply, installation, testing and commissioning, with a 50% quantity variation right and 50% escalation/de-escalation possibility during contract execution.

Technical Specifications & Requirements

  • Scope encompasses 32 items in a combined package for UG bunker construction and integrated systems: camera-based entry, ventilation, air conditioning, fire safety, filtration, oxygen supply, solar power, LED lighting, storage racks, and protective hardware.
  • Key execution requirements include submission of Detailed Design Drawings within 7 days of award, approval or modification within 7 days, and supply aligned to approved drawings.
  • Installation and commissioning are to be performed at designated Jammu locations by OEM/OEM-certified resources or OEM-authorized resellers; vendor authorization from OEM is mandatory. GST handling is bidder’s responsibility with actuals reimbursement limits. End User Certificate handling is per Buyer format.

Terms, Conditions & Eligibility

  • EMD: ₹342,000.
  • Delivery is contingent on timely design approval; failure to obtain approval resets delivery timelines; no liquidated damages for buyer delay.
  • GST responsibility lies with bidder; reimbursements subject to applicable rates.
  • Documentation required: PAN, GSTIN, cancelled cheque, EFT mandate; End User Certificate in Buyer format; OEM authorization where applicable.
  • Quantity flexibility up to 50% increase/decrease at order placement and during contract currency.
  • Installation and commissioning to be carried out by OEM-certified resources; NDA and non-disclosure mandatory.

Key Specifications

    • Item scope includes: video camera based entry system, tunnel ventilation, HEPA/Activated Carbon Filters, pressurized oxygen tank, solar panels, ducting for two-way air, layered LED lighting, modular storage racks, lockable compartments, GI components (GI Plate 600mm x 600mm x 6mm, GI wire 4 mm), cast iron covers, lightening conductor, entrance canopy
    • EMD amount: ₹342,000
    • Installation site: AT NARIAN, JAMMU & KASHMIR; AT KALAL, JAMMU & KASHMIR
    • Delivery obligation tied to approved Detailed Design Drawings within 7 days of award; modification list issued within 7 days

Terms & Conditions

  • EMD amount fixed at ₹342,000; submit with bid

  • 36–50% quantity variation right during contract; delivery tied to drawings approval

  • OEM authorization mandatory for installation by OEM-certified personnel

Important Clauses

Payment Terms

GST is bidder's responsibility; reimbursement as actuals or applicable rates; no explicit LD terms stated for buyer delays.

Delivery Schedule

Delivery tied to approval of Detailed Design Drawings within 7 days; non-approval triggers re-fix of delivery period without liquidated damages.

Penalties/Liquidated Damages

No LD for buyer delay in drawing approval; quantity adjustments allowed up to 50% at contract placement and during currency.

Bidder Eligibility

  • Not undergoing liquidation or bankruptcy; not under court receivership

  • Adequate OEM authorization for installation by OEM-certified resources

  • GST registration active; PAN and EFT mandate available

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

227

Category

Suppy and construction of UG Bunker FSC

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

35

OEM Avg. Turnover

92

Past Performance

80 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Suppy and construction of UG Bunker FSC , Cement of 43 Grade OPC , River sand , Stone aggregate 40 mm , Stone boulders for hard core , Placing of UG Bunker , Video Camera based entry system , Hot and Cool Air Conditioner , Tunnel Ventilation System , High efficiency heat exchanger , Fire Alarm System , HEPA Filters , Activated Carbon Filters , Pressurized Oxygen Tank , High efficiency Solar Panels , Supply comma installing comma Testing and commissioning , Multi Angle Digital Camera System , Provision of duct for two way , Installation of layered LED lighting , Highly efficient Foldable Table , Modular storage racks , Cool Glove Box , Lockable compartments , GI Plate 600mm x 600mm x 6mm , GI wire 4 mm , Cast Iron cover , Charcoal , Common Sal , GI Pipe 20 mm , Nuts and bolts , Lightening Conductor , entrance Canopy

Advisory Bank

HDFC Bank

ePBG Percentage

5%

ePBG Duration (Months)

12

Delivery Details

Max Delivery Days

100

Delivery Locations

1

Delivery Cities

Jammu

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JammuJammu--2100-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9942943.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 32 Items Sign in for GEM prices

#1

Suppy and construction of UG Bunker FSC

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 1

2 job Delivery: 100 days
#2

Cement of 43 Grade OPC

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 2

18 bags Delivery: 100 days
#3

River sand

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 3

3 cum Delivery: 100 days
#4

Stone aggregate 40 mm

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 4

6 cum Delivery: 100 days
#5

Stone boulders for hard core

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 5

6 cum Delivery: 100 days
#6

Placing of UG Bunker

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 6

2 job Delivery: 100 days
#7

Video Camera based entry system

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 7

2 sets Delivery: 100 days
#8

Hot and Cool Air Conditioner

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 8

2 sets Delivery: 100 days
#9

Tunnel Ventilation System

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 9

2 set Delivery: 100 days
#10

High efficiency heat exchanger

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 10

2 set Delivery: 100 days
#11

Fire Alarm System

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 11

2 set Delivery: 100 days
#12

HEPA Filters

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 12

2 set Delivery: 100 days
#13

Activated Carbon Filters

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 13

2 set Delivery: 100 days
#14

Pressurized Oxygen Tank

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 14

2 set Delivery: 100 days
#15

High efficiency Solar Panels

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 15

2 set Delivery: 100 days
#16

Supply comma installing comma Testing and commissioning

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 16

2 set Delivery: 100 days
#17

Multi Angle Digital Camera System

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 17

2 set Delivery: 100 days
#18

Provision of duct for two way

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 18

2 set Delivery: 100 days
#19

Installation of layered LED lighting

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 19

2 set Delivery: 100 days
#20

Highly efficient Foldable Table

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 20

6 set Delivery: 100 days
#21

Modular storage racks

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 21

6 no Delivery: 100 days
#22

Cool Glove Box

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 22

2 no Delivery: 100 days
#23

Lockable compartments

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 23

2 no Delivery: 100 days
#24

GI Plate 600mm x 600mm x 6mm

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 24

2 nos Delivery: 100 days
#25

GI wire 4 mm

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 25

30 rm Delivery: 100 days
#26

Cast Iron cover

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 26

2 nos Delivery: 100 days
#27

Charcoal

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 27

50 kg Delivery: 100 days
#28

Common Sal

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 28

50 kg Delivery: 100 days
#29

GI Pipe 20 mm

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 29

2 nos Delivery: 100 days
#30

Nuts and bolts

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 30

8 nos Delivery: 100 days
#31

Lightening Conductor

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 31

2 set Delivery: 100 days
#32

entrance Canopy

Description along with complete specification and quantity of the item is uploaded in item specification document attached at S No 32

2 nos Delivery: 100 days
Advertisement

Categories 80

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

End User Certificate (Buyer format)

6

OEM Authorization / Manufacturer Authorization

7

Non-disclosure Declaration on Bidder Letter Head

8

Details of Detailed Design Drawings submission with 7-day requirement

9

Bidder to upload undertaking of non-liquidity / no bankruptcy status

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for the Indian Army UG bunker and security systems tender in Jammu 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM Authorization, and End User Certificate in the Buyer format along with Detailed Design Drawings within 7 days of award. Ensure installation by OEM-certified personnel and confirm GST arrangements. The bid includes a ₹342,000 EMD and potential 50% quantity variation.

What documents are required for the Jammu security equipment procurement bid 2026?

Required documents include PAN Card, GSTIN, cancelled cheques, EFT mandate, End User Certificate in Buyer format, OEM Manufacturer Authorization, and Non-Disclosure Declaration. Also provide Detailed Design Drawings within 7 days and evidence of OEM-certified installation capability.

What are the installation requirements for the Indian Army project in Jammu?

Installation must be conducted by OEM-certified resources or OEM-authorized resellers. All components must align with approved Detailed Design Drawings, with any modifications issued by the Buyer. On-site delivery locations include NARIAN and KALAL in Jammu & Kashmir.

What is the EMD amount for the Jammu bunker and security systems tender?

The bid security deposit is ₹342,000. Ensure payment submission via the prescribed method and attach EMD documentation with the bid package to meet eligibility criteria.

What delivery conditions apply if Buyer delays drawing approvals in Jammu 2026?

If the Buyer delays drawing approvals, the delivery period is re-fixed without liquidated damages, ensuring fair time extension for the bidder based on the approval timeline.

What procurement scope items are included in the Jammu security systems package 2026?

The package includes UG bunker components, video entry system, HVAC, tunnel ventilation, HEPA and activated carbon filtration, oxygen tank, solar panels, ducting, LED lighting, modular storage, GI hardware, and related works for supply, installation, testing, and commissioning.

What is required for OEM authorization in this Army tender in Jammu?

Submit OEM Manufacturer Authorization detailing the supplier’s relationship, contact details, and proof of OEM-certified installation capabilities to satisfy installation requirements by the OEM or authorized reseller.

How will quantity variations affect the Jammu bunker project bid 2026?

The purchaser may increase/decrease quantity up to 50% at contract placement and during currency; bidders should plan for flexible procurement, inventory, and scheduling to accommodate potential scope changes.

Advertisement