Progress
The Semiconductor Laboratory under the Department Of Electronics And Information Technology invites bids for a self priming motor coupled centrifugal pump conforming to IS 5120. Key scope: a pump capacity of 8 L/s, discharge pressure of 18 m with a 3.75 kW motor mounted on an MS base frame. Annexure A references detailed specs. The tender emphasizes OEM warranty, availability of after-sales service within INDIA, and delivery terms aligned with the option clause. This procurement targets a reliable, standard-compliant pumping solution suitable for lab infrastructure.
Product/service names: self priming centrifugal pump with motor coupling
Quantities/Capacities: 8 L/s flow, 18 m head
Estimated value / EMD: not specified in data; indicative order driven by quantity up to 25%
Experience requirements: prior supply of IS 5120 pumps and related after-sales network in INDIA
Quality/standards: IS 5120 conformance; OEM warranty certificates required
Option to vary quantity by 25% during contract with corresponding delivery time adjustment
1-year warranty from final acceptance or post-installation testing; OEM certificates mandatory
Robust after-sales service network in INDIA with local service centers
Payment terms mirror contract provisions; no fixed % given in data; ensure alignment with order and delivery milestones
Delivery shall commence from the last date of original delivery order; extended delivery time calculated as (increased quantity/original quantity) × original period, minimum 30 days
Penalties applicable as per standard buyer ATC clauses; ensure conformity with option-based delivery deviations and warranty servicing timelines
Proven experience in supplying IS 5120 compliant pumps or equivalent self priming pumps
Demonstrated installation, commissioning, and after-sales service capability within INDIA
Financial capacity to handle contract scope and meet EMD/security requirements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Self Priming Pump Conforming To IS 5120 (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Sep-2026, 3:30 am
Opening Date
18-Sep-2026, 3:30 am
Extended Deadline
09-Jun-2026, 3:30 am
Opening Date
09-Jun-2026, 4:00 am
Extended Deadline
02-Jun-2026, 5:30 am
Opening Date
02-Jun-2026, 6:00 am
Extended Deadline
29-May-2026, 6:30 am
Opening Date
29-May-2026, 7:00 am
Extended Deadline
28-May-2026, 7:30 am
Opening Date
28-May-2026, 8:00 am
Extended Deadline
30-Apr-2026, 4:30 am
Opening Date
30-Apr-2026, 5:00 am
GST registration certificate
PAN card
Experience certificates for similar pump supply projects
Financial statements (latest)
EMD/Security deposit payment proof
Technical bid documents and compliance statement
OEM authorization / authorization letter
Warranty certificates and after-sales service plan
Installation, Commissioning & Training plan
Service Center locations list near consignee destinations
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Application | Centrifugal Pump for handling various types of liquids other than clear,cold and fresh water, Handling chemicals, effluents, sewage, ash-water. De-watering foundation, trenches and pits. Flood water handling. Pumping water from docks, ports, vessels. De-watering from basements, multi-storeys, shopping malls, godowns. Cooling water for marine engines and shovels |
| GENERIC | Pump Type | Self Priming Motor Coupled Pump |
| GENERIC | Maximum Solid Particle Size Handled | 60.0 |
| GENERIC | Suction Port Size (Nominal) | 80.0 |
| GENERIC | Discharge Port Size (Nominal) | 80.0 |
| CONSTRUCTION | Pump Shaft Material | Stainless Steel |
| CONSTRUCTION | Impeller Material | Cast Iron |
| CONSTRUCTION | Motor Body Material | Cast Iron |
| CONSTRUCTION | Motor Type, Phase and Voltage | AC Motor ISI Marked 3 Phase , 415 V ± 10%, 50Hz±3%Hz |
| CONSTRUCTION | Degree of Protection | IP 55 |
Key insights about PUNJAB tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD proof, OEM authorization, and technical compliance documents. Ensure IS 5120 conformity, provide OEM warranty certificates, and present installation/training plans. Delivery terms follow the option clause; prepare service network details across INDIA.
Required documents include GST certificate, PAN, experience certificates for similar pumps, latest financial statements, EMD proof, OEM authorization, technical bid, warranty certificates, and installation/maintenance plans. Also provide list of service centers near consignee destinations.
Key specs: flow 8 L/s, head 18 m, motor 3.75 kW, MS base frame, IS 5120 conformity, three-phase supply. Annexure A contains material and protection ratings; ensure shaft, impeller and motor housing meet stated construction standards and provide testing certificates.
Delivery timing is tied to the last date of the original delivery order; any extended period due to the 25% quantity option is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
A 1 year warranty from final acceptance or post-installation testing, with OEM certificates. The seller must guarantee rectification of breakdowns during the warranty period and provide nationwide after-sales service with installation and commissioning support.
Successful bidders must submit OEM authorization letters and warranty certifications, with details of service centers in INDIA. The product must be IS 5120 compliant and accompanied by installation, commissioning, and training documentation for end-users.
The purchaser may adjust quantity by up to 25% during contract initiation or currency. Delivery time scales with the new quantity using the formula (increased quantity ÷ original quantity) × original delivery period, minimum 30 days, ensuring orderly ramp-up or scale-down.
Bidders must provide a well-established installation, commissioning, troubleshooting and maintenance service group in INDIA, with a list of service centers near consignee destinations to be uploaded with the bid.