TenderDekho Logo
Closed GEM

GAIL India Limited Security Equipment / Procurement Tender Gautam Buddha Nagar UP 2026

Bid Publish Date

03-Sep-2026, 7:47 pm

Bid End Date

17-Sep-2026, 2:00 pm

EMD

₹13,04,000

Generate Docs

Progress

Issue03-Sep-2026, 7:47 pm
Corrigendum17-Sep-2026
AwardPending

Tender Overview

GAIL India Limited invites bids via the GEM portal for a broad procurement program located in GAUTAM BUDDHA NAGAR, Uttar Pradesh (201301). The opportunity carries an EMD of ₹1,304,000 and a large scope with 196 BOQ items listed, though individual item details are not disclosed in the provided data. The tender is published through the GEM portal, with two-part bid documentation (Part-1 pages 1-550 and Part-2 pages 551-650) indicating a comprehensive, high-volume bid. Submissions must be performed on GEM; the terms emphasize portal precedence and attachment hierarchy. A unique context is the absence of explicit item specifications, suggesting a broad-range, multi-category purchase by a major public sector undertaker. Key differentiators include the mandatory GEM portal evaluation, ATC precedence over GCC, and the split-document approach for the tender file. This procurement may cover diverse goods or services aligned to Gail’s upstream/downstream operations, requiring robust compliance and documentation.

Technical Specifications & Requirements

  • Total BOQ items: 196 with no item-level details (N/A quantities) across the catalog
  • EMD amount: ₹1,304,000 as stated in the tender terms
  • Portal requirements: Bids submitted only through GEM Portal; two-part tender document uploaded (Part-1 and Part-2)
  • ATC/GCC precedence: Terms specify GEM GCC/GTC rules are overridden by the tender’s own specifications
  • Delivery/assortment notes: No explicit delivery schedule or product specs provided; suggests a broad procurement scope
  • Potentially multi-category scope given item count; bidders should prepare for diverse documentation and compliance

Terms, Conditions & Eligibility

  • Submission channel: Bids via GEM Portal only; portal-based evaluation
  • Document hierarchy: Terms uploaded on GEM portal govern over GCC/GTC when conflicts arise
  • Two-part bid file: Large document uploaded in Part-1 (pages 1-550) and Part-2 (pages 551-650)
  • Unspecified delivery window: No delivery period explicitly stated in the available data; bidders must seek clarification
  • Bid validity and CPBG/EPBG values: Not disclosed in the supplied text; treat as per GEM portal guidelines and ATC file

Key Specifications

  • Total BOQ items: 196

  • EMD amount: ₹1,304,000

  • Submission channel: GEM Portal only

  • Two-part tender documents: Part-1 pages 1-550, Part-2 pages 551-650

  • ATC precedence over GCC/GTC in conflict scenarios

  • No explicit item-level specifications provided

Terms & Conditions

  • Bids must be submitted via the GEM Portal

  • Tender terms supersede GEM GCC/GTC in case of conflict

  • Large tender file uploaded in two parts

Important Clauses

Payment Terms

Not specified in provided data; refer to ATC file uploaded on GEM portal

Delivery Schedule

Not specified in provided data; no explicit delivery window mentioned

Penalties/Liquidated Damages

Not specified in provided data; refer to ATC for penalties if available

Bidder Eligibility

  • Eligibility criteria not disclosed in the supplied data; bidders should review GEM ATC and GCC/GTC terms

  • Must participate through GEM Portal as sole submission channel

  • Emphasis on complying with portal-specific terms and documentation requirements

Authority & Contact

Organization

Gail India Limited

Office Name

Noida

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

196

Category

SUPPLY FOR MR ITEM No. 1.0001 INCLUDING GST

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

35

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

210

Delivery Locations

1

Delivery Cities

Gautam Buddha Nagar

Delivery Pincodes

201301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Arnav Ranjan201301,B - 35 & 36, Jubilee Tower, Gail (India) Limited, Sector - 1, NoidaGautam Buddha NagarUttar Pradesh2013011210-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASGAIL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9845579.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 196 Items Sign in for GEM prices

#1

SUPPLY FOR MR ITEM No. 1.0001 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0001 INCLUDING GST

1 nos Delivery: 210 days
#2

SUPPLY FOR MR ITEM No. 1.0002 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0002 INCLUDING GST

1 nos Delivery: 210 days
#3

SUPPLY FOR MR ITEM No. 1.0003 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0003INCLUDING GST

1 nos Delivery: 210 days
#4

SUPPLY FOR MR ITEM No. 1.0004 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0004 INCLUDING GST

1 nos Delivery: 210 days
#5

SUPPLY FOR MR ITEM No. 1.0005 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0005 INCLUDING GST

1 nos Delivery: 210 days
#6

SUPPLY FOR MR ITEM No. 1.0006 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0006 INCLUDING GST

1 nos Delivery: 210 days
#7

SUPPLY FOR MR ITEM No. 1.0007 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0007 INCLUDING GST

1 nos Delivery: 210 days
#8

SUPPLY FOR MR ITEM No. 1.0008 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0008 INCLUDING GST

1 nos Delivery: 210 days
#9

SUPPLY FOR MR ITEM No. 1.0009 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0009 INCLUDING GST

1 nos Delivery: 210 days
#10

SUPPLY FOR MR ITEM No. 1.0010 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0010 INCLUDING GST

1 nos Delivery: 210 days
#11

SUPPLY FOR MR ITEM No. 1.0011 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0011 INCLUDING GST

1 nos Delivery: 210 days
#12

SUPPLY FOR MR ITEM No. 1.0012 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0012 INCLUDING GST

1 nos Delivery: 210 days
#13

SUPPLY FOR MR ITEM No. 1.0013 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0013 INCLUDING GST

1 nos Delivery: 210 days
#14

SUPPLY FOR MR ITEM No. 1.0014 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0014 INCLUDING GST

1 nos Delivery: 210 days
#15

SUPPLY FOR MR ITEM No. 1.0015 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0015 INCLUDING GST

1 nos Delivery: 210 days
#16

SUPPLY FOR MR ITEM No. 1.0016 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0016 INCLUDING GST

1 nos Delivery: 210 days
#17

SUPPLY FOR MR ITEM No. 1.0017 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0017 INCLUDING GST

1 nos Delivery: 210 days
#18

SUPPLY FOR MR ITEM No. 1.0018 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0018 INCLUDING GST

1 nos Delivery: 210 days
#19

SUPPLY FOR MR ITEM No. 1.0019 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0019 INCLUDING GST

1 nos Delivery: 210 days
#20

SUPPLY FOR MR ITEM No. 1.0020 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0020 INCLUDING GST

1 nos Delivery: 210 days
#21

SUPPLY FOR MR ITEM No. 1.0021 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0021 INCLUDING GST

1 nos Delivery: 210 days
#22

SUPPLY FOR MR ITEM No. 1.0022 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0022 INCLUDING GST

1 nos Delivery: 210 days
#23

SUPPLY FOR MR ITEM No. 1.0023 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0023 INCLUDING GST

1 nos Delivery: 210 days
#24

SUPPLY FOR MR ITEM No. 1.0024 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0024 INCLUDING GST

1 nos Delivery: 210 days
#25

SUPPLY FOR MR ITEM No. 1.0025 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0025 INCLUDING GST

1 nos Delivery: 210 days
#26

SUPPLY FOR MR ITEM No. 1.0026 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0026 INCLUDING GST

1 nos Delivery: 210 days
#27

SUPPLY FOR MR ITEM No. 1.0027 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0027 INCLUDING GST

1 nos Delivery: 210 days
#28

SUPPLY FOR MR ITEM No. 1.0028 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0028 INCLUDING GST

1 nos Delivery: 210 days
#29

SUPPLY FOR MR ITEM No. 1.0029 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0029 INCLUDING GST

1 nos Delivery: 210 days
#30

SUPPLY FOR MR ITEM No. 1.0030 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0030 INCLUDING GST

1 nos Delivery: 210 days
#31

SUPPLY FOR MR ITEM No. 1.0031 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0031 INCLUDING GST

1 nos Delivery: 210 days
#32

SUPPLY FOR MR ITEM No. 1.0032 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0032 INCLUDING GST

1 nos Delivery: 210 days
#33

SUPPLY FOR MR ITEM No. 1.0033 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0033 INCLUDING GST

1 nos Delivery: 210 days
#34

SUPPLY FOR MR ITEM No. 1.0034 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0034 INCLUDING GST

1 nos Delivery: 210 days
#35

SUPPLY FOR MR ITEM No. 1.0035 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0035 INCLUDING GST

1 nos Delivery: 210 days
#36

SUPPLY FOR MR ITEM No. 1.0036 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0036 INCLUDING GST

1 nos Delivery: 210 days
#37

SUPPLY FOR MR ITEM No. 1.0037 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0037 INCLUDING GST

1 nos Delivery: 210 days
#38

SUPPLY FOR MR ITEM No. 1.0038 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0038 INCLUDING GST

1 nos Delivery: 210 days
#39

SUPPLY FOR MR ITEM No. 1.0039 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0039 INCLUDING GST

1 nos Delivery: 210 days
#40

SUPPLY FOR MR ITEM No. 1.0040 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0040 INCLUDING GST

1 nos Delivery: 210 days
#41

SUPPLY FOR MR ITEM No. 1.0041 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0041 INCLUDING GST

1 nos Delivery: 210 days
#42

SUPPLY FOR MR ITEM No. 1.0042 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0042 INCLUDING GST

1 nos Delivery: 210 days
#43

SUPPLY FOR MR ITEM No. 1.0043 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0043 INCLUDING GST

1 nos Delivery: 210 days
#44

SUPPLY FOR MR ITEM No. 1.0044 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0044 INCLUDING GST

1 nos Delivery: 210 days
#45

SUPPLY FOR MR ITEM No. 1.0045 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0045 INCLUDING GST

1 nos Delivery: 210 days
#46

SUPPLY FOR MR ITEM No. 1.0046 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0046 INCLUDING GST

1 nos Delivery: 210 days
#47

SUPPLY FOR MR ITEM No. 1.0047 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0047 INCLUDING GST

1 nos Delivery: 210 days
#48

SUPPLY FOR MR ITEM No. 1.0048 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0048 INCLUDING GST

1 nos Delivery: 210 days
#49

SUPPLY FOR MR ITEM No. 1.0049 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0049 INCLUDING GST

1 nos Delivery: 210 days
#50

SUPPLY FOR MR ITEM No. 1.0050 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0050 INCLUDING GST

1 nos Delivery: 210 days
#51

SUPPLY FOR MR ITEM No. 1.0051 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0051 INCLUDING GST

1 nos Delivery: 210 days
#52

SUPPLY FOR MR ITEM No. 1.0052 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0052 INCLUDING GST

1 nos Delivery: 210 days
#53

SUPPLY FOR MR ITEM No. 1.0053 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0053 INCLUDING GST

1 nos Delivery: 210 days
#54

SUPPLY FOR MR ITEM No. 1.0054 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0054 INCLUDING GST

1 nos Delivery: 210 days
#55

SUPPLY FOR MR ITEM No. 1.0055 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0055 INCLUDING GST

1 nos Delivery: 210 days
#56

SUPPLY FOR MR ITEM No. 1.0056 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0056 INCLUDING GST

1 nos Delivery: 210 days
#57

SUPPLY FOR MR ITEM No. 1.0057 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0057 INCLUDING GST

1 nos Delivery: 210 days
#58

SUPPLY FOR MR ITEM No. 1.0058 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0058 INCLUDING GST

1 nos Delivery: 210 days
#59

SUPPLY FOR MR ITEM No. 1.0059 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0059 INCLUDING GST

1 nos Delivery: 210 days
#60

SUPPLY FOR MR ITEM No. 1.0060 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0060 INCLUDING GST

1 nos Delivery: 210 days
#61

SUPPLY FOR MR ITEM No. 1.0061 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0061 INCLUDING GST

1 nos Delivery: 210 days
#62

SUPPLY FOR MR ITEM No. 1.0062 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0062 INCLUDING GST

1 nos Delivery: 210 days
#63

SUPPLY FOR MR ITEM No. 1.0063 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0063 INCLUDING GST

1 nos Delivery: 210 days
#64

SUPPLY FOR MR ITEM No. 1.0064 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0064 INCLUDING GST

1 nos Delivery: 210 days
#65

SUPPLY FOR MR ITEM No. 1.0065 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0065 INCLUDING GST

1 nos Delivery: 210 days
#66

SUPPLY FOR MR ITEM No. 1.0066 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0066 INCLUDING GST

1 nos Delivery: 210 days
#67

SUPPLY FOR MR ITEM No. 1.0067 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0067 INCLUDING GST

1 nos Delivery: 210 days
#68

SUPPLY FOR MR ITEM No. 1.0068 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0068 INCLUDING GST

1 nos Delivery: 210 days
#69

SUPPLY FOR MR ITEM No. 1.0069 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0069 INCLUDING GST

1 nos Delivery: 210 days
#70

SUPPLY FOR MR ITEM No. 1.0070 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0070 INCLUDING GST

1 nos Delivery: 210 days
#71

SUPPLY FOR MR ITEM No. 1.0071 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0071 INCLUDING GST

1 nos Delivery: 210 days
#72

SUPPLY FOR MR ITEM No. 1.0072 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0072 INCLUDING GST

1 nos Delivery: 210 days
#73

SUPPLY FOR MR ITEM No. 1.0073 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0073 INCLUDING GST

1 nos Delivery: 210 days
#74

SUPPLY FOR MR ITEM No. 1.0074 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0074 INCLUDING GST

1 nos Delivery: 210 days
#75

SUPPLY FOR MR ITEM No. 1.0075 INCLUDING GST

SUPPLY FOR MR ITEM No. 1.0075 INCLUDING GST

1 nos Delivery: 210 days
#76

SITE WORK FOR MR ITEM No. 2.0008 INCLUDING GST

SITE WORK FOR MR ITEM No. 2.0008 INCLUDING GST

1 ls Delivery: 210 days
#77

SITE WORK FOR MR ITEM No. 2.0023 INCLUDING GST

SITE WORK FOR MR ITEM No. 2.0023 INCLUDING GST

1 ls Delivery: 210 days
#78

TRANSPORTATION FOR MR ITEM No. 3.0001 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0001 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#79

TRANSPORTATION FOR MR ITEM No. 3.0002 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0002 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#80

TRANSPORTATION FOR MR ITEM No. 3.0003 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0003 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#81

TRANSPORTATION FOR MR ITEM No. 3.0004 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0004 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#82

TRANSPORTATION FOR MR ITEM No. 3.0005 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0005 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#83

TRANSPORTATION FOR MR ITEM No. 3.0006 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0006 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#84

TRANSPORTATION FOR MR ITEM No. 3.0007 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0007 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#85

TRANSPORTATION FOR MR ITEM No. 3.0008 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0008 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#86

TRANSPORTATION FOR MR ITEM No. 3.0009 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0009 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#87

TRANSPORTATION FOR MR ITEM No. 3.0010 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0010 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#88

TRANSPORTATION FOR MR ITEM No. 3.0011 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0011 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#89

TRANSPORTATION FOR MR ITEM No. 3.0012 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0012 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#90

TRANSPORTATION FOR MR ITEM No. 3.0013 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0013 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#91

TRANSPORTATION FOR MR ITEM No. 3.0014 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0014 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#92

TRANSPORTATION FOR MR ITEM No. 3.0015 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0015 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#93

TRANSPORTATION FOR MR ITEM No. 3.0016 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0016 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#94

TRANSPORTATION FOR MR ITEM No. 3.0017 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0017 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#95

TRANSPORTATION FOR MR ITEM No. 3.0018 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0018 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#96

TRANSPORTATION FOR MR ITEM No. 3.0019 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0019 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#97

TRANSPORTATION FOR MR ITEM No. 3.0020 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0020 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#98

TRANSPORTATION FOR MR ITEM No. 3.0021 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0021 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#99

TRANSPORTATION FOR MR ITEM No. 3.0022 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0022 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#100

TRANSPORTATION FOR MR ITEM No. 3.0023 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0023 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#101

TRANSPORTATION FOR MR ITEM No. 3.0024 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0024 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#102

TRANSPORTATION FOR MR ITEM No. 3.0025 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0025 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#103

TRANSPORTATION FOR MR ITEM No. 3.0026 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0026 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#104

TRANSPORTATION FOR MR ITEM No. 3.0027 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0027 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#105

TRANSPORTATION FOR MR ITEM No. 3.0028 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0028 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#106

TRANSPORTATION FOR MR ITEM No. 3.0029 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0029 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#107

TRANSPORTATION FOR MR ITEM No. 3.0030 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0030 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#108

TRANSPORTATION FOR MR ITEM No. 3.0031 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0031 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#109

TRANSPORTATION FOR MR ITEM No. 3.0032 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0032 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#110

TRANSPORTATION FOR MR ITEM No. 3.0033 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0033 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#111

TRANSPORTATION FOR MR ITEM No. 3.0034 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0034 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#112

TRANSPORTATION FOR MR ITEM No. 3.0035 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0035 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#113

TRANSPORTATION FOR MR ITEM No. 3.0036 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0036 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#114

TRANSPORTATION FOR MR ITEM No. 3.0037 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0037 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#115

TRANSPORTATION FOR MR ITEM No. 3.0038 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0038 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#116

TRANSPORTATION FOR MR ITEM No. 3.0039 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0039 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#117

TRANSPORTATION FOR MR ITEM No. 3.0040 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0040 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#118

TRANSPORTATION FOR MR ITEM No. 3.0041 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0041 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#119

TRANSPORTATION FOR MR ITEM No. 3.0042 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0042 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#120

TRANSPORTATION FOR MR ITEM No. 3.0043 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0043 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#121

TRANSPORTATION FOR MR ITEM No. 3.0044 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0044 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#122

TRANSPORTATION FOR MR ITEM No. 3.0045 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0045 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#123

TRANSPORTATION FOR MR ITEM No. 3.0046 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0046 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#124

TRANSPORTATION FOR MR ITEM No. 3.0047 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0047 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#125

TRANSPORTATION FOR MR ITEM No. 3.0048 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0048 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#126

TRANSPORTATION FOR MR ITEM No. 3.0049 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0049 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#127

TRANSPORTATION FOR MR ITEM No. 3.0050 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0050 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#128

TRANSPORTATION FOR MR ITEM No. 3.0051 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0051 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#129

TRANSPORTATION FOR MR ITEM No. 3.0052 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0052 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#130

TRANSPORTATION FOR MR ITEM No. 3.0053 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0053 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#131

TRANSPORTATION FOR MR ITEM No. 3.0054 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0054 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#132

TRANSPORTATION FOR MR ITEM No. 3.0055 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0055 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#133

TRANSPORTATION FOR MR ITEM No. 3.0056 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0056 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#134

TRANSPORTATION FOR MR ITEM No. 3.0057 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0057 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#135

TRANSPORTATION FOR MR ITEM No. 3.0058 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0058 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#136

TRANSPORTATION FOR MR ITEM No. 3.0059 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0059 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#137

TRANSPORTATION FOR MR ITEM No. 3.0060 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0060 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#138

TRANSPORTATION FOR MR ITEM No. 3.0061 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0061 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#139

TRANSPORTATION FOR MR ITEM No. 3.0062 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0062 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#140

TRANSPORTATION FOR MR ITEM No. 3.0063 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0063 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#141

TRANSPORTATION FOR MR ITEM No. 3.0064 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0064 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#142

TRANSPORTATION FOR MR ITEM No. 3.0065 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0065 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#143

TRANSPORTATION FOR MR ITEM No. 3.0066 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0066 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#144

TRANSPORTATION FOR MR ITEM No. 3.0067 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0067 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#145

TRANSPORTATION FOR MR ITEM No. 3.0068 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0068 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#146

TRANSPORTATION FOR MR ITEM No. 3.0069 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0069 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#147

TRANSPORTATION FOR MR ITEM No. 3.0070 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0070 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#148

TRANSPORTATION FOR MR ITEM No. 3.0071 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0071 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#149

TRANSPORTATION FOR MR ITEM No. 3.0072 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0072 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#150

TRANSPORTATION FOR MR ITEM No. 3.0073 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0073 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#151

TRANSPORTATION FOR MR ITEM No. 3.0074 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0074 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#152

TRANSPORTATION FOR MR ITEM No. 3.0075 transportation of mandatory spare price including GST

TRANSPORTATION FOR MR ITEM No. 3.0075 transportation of mandatory spare price including GST

1 ls Delivery: 210 days
#153

TOTAL MANDATORY SPARE PRICE INCLUDING GST AS PER MR SL. NO. 4.0001

TOTAL MANDATORY SPARE PRICE INCLUDING GST AS PER MR SL. NO. 4.0001

1 ls Delivery: 210 days
#154

Total Supervision charges For Item SL. No. 8.0001 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0001 considering 01 manday including GST

1 ls Delivery: 210 days
#155

Total Supervision charges For Item SL. No. 8.0002 considering 03 manday including GST

Total Supervision charges For Item SL. No. 8.0002 considering 03 manday including GST

1 ls Delivery: 210 days
#156

Total Supervision charges For Item SL. No. 8.0003 considering 03 manday including GST

Total Supervision charges For Item SL. No. 8.0003 considering 03 manday including GST

1 ls Delivery: 210 days
#157

Total Supervision charges For Item SL. No. 8.0004 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0004 considering 01 manday including GST

1 ls Delivery: 210 days
#158

Total Supervision charges For Item SL. No. 8.0005 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0005 considering 01 manday including GST

1 ls Delivery: 210 days
#159

Total Supervision charges For Item SL. No. 8.0006 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0006 considering 01 manday including GST

1 ls Delivery: 210 days
#160

Total Supervision charges For Item SL. No. 8.0008 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0008 considering 01 manday including GST

1 ls Delivery: 210 days
#161

Total Supervision charges For Item SL. No. 8.0009 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0009 considering 01 manday including GST

1 ls Delivery: 210 days
#162

Total Supervision charges For Item SL. No. 8.0012 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0012 considering 01 manday including GST

1 ls Delivery: 210 days
#163

Total Supervision charges For Item SL. No. 8.0015 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0015 considering 01 manday including GST

1 ls Delivery: 210 days
#164

Total Supervision charges For Item SL. No. 8.0018 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0018 considering 01 manday including GST

1 ls Delivery: 210 days
#165

Total Supervision charges For Item SL. No. 8.0019 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0019 considering 01 manday including GST

1 ls Delivery: 210 days
#166

Total Supervision charges For Item SL. No. 8.0020 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0020 considering 01 manday including GST

1 ls Delivery: 210 days
#167

Total Supervision charges For Item SL. No. 8.0021 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0021 considering 01 manday including GST

1 ls Delivery: 210 days
#168

Total Supervision charges For Item SL. No. 8.0023 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0023 considering 01 manday including GST

1 ls Delivery: 210 days
#169

Total Supervision charges For Item SL. No. 8.0024 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0024 considering 01 manday including GST

1 ls Delivery: 210 days
#170

Total Supervision charges For Item SL. No. 8.0025 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0025 considering 01 manday including GST

1 ls Delivery: 210 days
#171

Total Supervision charges For Item SL. No. 8.0026 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0026 considering 01 manday including GST

1 ls Delivery: 210 days
#172

Total Supervision charges For Item SL. No. 8.0027 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0027 considering 01 manday including GST

1 ls Delivery: 210 days
#173

Total Supervision charges For Item SL. No. 8.0028 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0028 considering 01 manday including GST

1 ls Delivery: 210 days
#174

Total Supervision charges For Item SL. No. 8.0029 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0029 considering 01 manday including GST

1 ls Delivery: 210 days
#175

Total Supervision charges For Item SL. No. 8.0030 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0030 considering 01 manday including GST

1 ls Delivery: 210 days
#176

Total Supervision charges For Item SL. No. 8.0031 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0031 considering 01 manday including GST

1 ls Delivery: 210 days
#177

Total Supervision charges For Item SL. No. 8.0032 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0032 considering 01 manday including GST

1 ls Delivery: 210 days
#178

Total Supervision charges For Item SL. No. 8.0033 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0033 considering 01 manday including GST

1 ls Delivery: 210 days
#179

Total Supervision charges For Item SL. No. 8.0034 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0034 considering 01 manday including GST

1 ls Delivery: 210 days
#180

Total Supervision charges For Item SL. No. 8.0035 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0035 considering 01 manday including GST

1 ls Delivery: 210 days
#181

Total Supervision charges For Item SL. No. 8.0036 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0036 considering 01 manday including GST

1 ls Delivery: 210 days
#182

Total Supervision charges For Item SL. No. 8.0037 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0037 considering 01 manday including GST

1 ls Delivery: 210 days
#183

Total Supervision charges For Item SL. No. 8.0038 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0038 considering 01 manday including GST

1 ls Delivery: 210 days
#184

Total Supervision charges For Item SL. No. 8.0039 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0039 considering 01 manday including GST

1 ls Delivery: 210 days
#185

Total Supervision charges For Item SL. No. 8.0040 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0040 considering 01 manday including GST

1 ls Delivery: 210 days
#186

Total Supervision charges For Item SL. No. 8.0041 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0041 considering 01 manday including GST

1 ls Delivery: 210 days
#187

Total Supervision charges For Item SL. No. 8.0042 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0042 considering 01 manday including GST

1 ls Delivery: 210 days
#188

Total Supervision charges For Item SL. No. 8.0043 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0043 considering 01 manday including GST

1 ls Delivery: 210 days
#189

Total Supervision charges For Item SL. No. 8.0044 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0044 considering 01 manday including GST

1 ls Delivery: 210 days
#190

Total Supervision charges For Item SL. No. 8.0045 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0045 considering 01 manday including GST

1 ls Delivery: 210 days
#191

Total Supervision charges For Item SL. No. 8.0046 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0046 considering 01 manday including GST

1 ls Delivery: 210 days
#192

Total Supervision charges For Item SL. No. 8.0047 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0047 considering 01 manday including GST

1 ls Delivery: 210 days
#193

Total Supervision charges For Item SL. No. 8.0048 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0048 considering 01 manday including GST

1 ls Delivery: 210 days
#194

Total Supervision charges For Item SL. No. 8.0049 considering 01 manday including GST

Total Supervision charges For Item SL. No. 8.0049 considering 01 manday including GST

1 ls Delivery: 210 days
#195

Total Training charges at site For Item SL. No.11.0002 considering 10 manday including GST

Total Training charges at site For Item SL. No.11.0002 considering 10 manday including GST

1 ls Delivery: 210 days
#196

Total Training charges at site For Item SL. No.11.0003 considering 10 manday including GST

Total Training charges at site For Item SL. No.11.0003 considering 10 manday including GST

1 ls Delivery: 210 days

Categories 1

Corrigendum Updates

1 Update
#1

Update

17-Sep-2026

Extended Deadline

24-Sep-2026, 8:30 am

Opening Date

25-Sep-2026, 8:30 am

Required Documents

1

Additional Doc 1 (Requested in ATC)

2

Additional Doc 2 (Requested in ATC)

3

Additional Doc 3 (Requested in ATC)

4

Additional Doc 4 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for the GAIL tender submission in UP 2026?

Bidders must submit via the GEM Portal with the two-part tender file; the ATC document governs while GCC/GTC may be overridden. Specific item-level specs are not provided here, so bidders should carefully follow the uploaded ATC and portal instructions to prepare technical and financial bids.

How to submit bids through the GEM Portal for Gail India Limited?

Access the GEM Portal, register as a bidder, and upload Part-1 and Part-2 tender documents as required. Ensure EMD of ₹1,304,000 is provided as per tender terms, and verify that ATC documents are attached to supersede standard GCC/GTC terms.

What is the EMD amount for the Gail UP tender 2026?

The EMD amount is ₹1,304,000. Ensure payment method aligns with GEM portal guidelines, include scan/copy of payment receipt in the bid submission, and reference the correct tender enclosure as instructed in the ATC.

Are item-specific specifications provided for Gail UP tender 2026?

No explicit item-level specifications are provided in the available data. The tender lists 196 BOQ items but individual quantities and categories are not disclosed; bidders should rely on the ATC document uploaded on GEM and seek clarification if needed.

What is the delivery requirement for the Gail UP tender?

Delivery schedule is not specified in the provided data. Bidders should review the ATC and contact Gail procurement via GEM for precise delivery windows and installation/handover timelines if applicable.

How to confirm bid validity and contractual obligations in this Gail tender?

Bid validity and CPBG/EPBG values are not disclosed here. Refer to the ATC document on GEM portal, as it governs the conditional terms. Ensure your bid remains valid for the period specified there and confirm any payment terms post-award.

What happens if there is a conflict between GCC and tender terms?

The tender terms explicitly state that the tender’s provisions shall prevail over GEM GCC/GTC terms. Bidders should align all submissions with the specific ATC documents uploaded for this enquiry to avoid disqualification.

How to handle the two-part tender document for this Gail UP procurement?

Prepare Part-1 (pages 1-550) and Part-2 (pages 551-650) as separate uploads per the notice. Ensure cross-referencing and consistency between parts, with EMD and technical credentials clearly labeled in the respective sections.