Bid Publish Date
01-Apr-2026, 10:48 am
Bid End Date
14-Apr-2026, 3:00 pm
Location
Progress
Quantity
250
Bid Type
Two Packet Bid
Hindustan Copper Limited invites bids for an AC Static Watthour Meters procurement aligned to IS 13779 (V2). The tender scope references energy meters under the Q2 category, with no BOQ items listed. The project is location-agnostic in the data, and the estimated value and EMD are not disclosed. A notable differentiator is the incorporation of an option clause allowing quantity adjustments up to 25% of bid/contracted quantity, with corresponding delivery-time recalculations. This bid requires strict adherence to the buyer-added ATC terms, and bidders should prepare to submit per the provided IS 13779 (V2) specifications. The absence of concrete start/end dates suggests typical government procurement timelines and the need for early bidder engagement to confirm delivery windows and pricing.
Although explicit meter specifications are not provided in the data, bidders must align with the stated standard IS 13779 (V2) and the project’s ATC requirements. The tender emphasizes compliance with the buyer’s terms and a strict quote aligned to the IS 13779 framework for energy meters. The absence of BOQ items indicates a need for bidders to present detailed pricing for meter units, associated accessories, testing, and warranty terms as per the IS standard and ATC guidance. Potential suppliers should verify the IS 13779 (V2) conformance, provide calibration/test reports, and ensure compatible interface with common energy metering protocols. Delivery expectations will be tied to order dates and the option clause.
Product/service names: AC Static Watthour Meter
Quantity/scale: Not specified in BOQ; pricing should cover unit meters
Estimated value: Not disclosed
Category: Energy Meters, IS 13779 (V2) compliant
Delivery: Per option clause with 30-day minimum extension
Experience: Prior supply of IS 13779 energy meters recommended
Quality: IS 13779 (V2) conformance; testing/certification via ATC
Option Clause enabling quantity adjustments up to 25%
Delivery extension formula based on increased quantity
Compliance with buyer-added ATC and IS 13779 (V2)
Payment terms are governed by buyer ATC; specify milestones in bid per IS 13779 requirements
Delivery period depends on order date; extended delivery time computed from extension ratio with minimum 30 days
Penalties/LD terms will be defined in ATC; ensure compliance with delivery timelines
Experience in supplying IS 13779 (V2) energy meters
Financial capacity to handle meter procurement and support
OEM authorization or proven service capability for energy meters
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar IS 13779 energy meter supply
Financial statements / solvency disclosures
EMD submission (amount to be specified in ATC) corroborating security deposit
Technical bid documents demonstrating IS 13779 (V2) compliance
OEM authorization (if not in-house) and service/support arrangements
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ACCUMET SOLUTIONS Under PMA | Make : ACCUMET SOLUTIONS--ACCUMET SOLUTIONS Model : AS01 | 07-04-2026 11:33:14 | |
| 2 | BENTEC INDIA LIMITED Under PMA | Make : BENLO Model : 70163 | 10-04-2026 10:57:18 | |
| 3 | Bentex Control & Switchgear Co. Under PMA | Make : Bentex-Linger Model : EM-124 | 10-04-2026 17:07:02 | |
| 4 | BILLTECH ELECTRICALS PRIVATE LIMITED Under PMA | Make : BILLTECH Model : Single Phase 2 Wire AC Static Watthour Meters | 11-04-2026 16:31:12 | |
| 5 | Jayash Enterprises Under PMA | Make : SUN STAR Model : SINGLE PHASE ENERGY METER 10-40A ENERGY METER SSIM | 12-04-2026 11:40:40 | |
| 6 | TECHNO METERS AND ELECTRONICS Under PMA | Make : TECHNO Model : TECHNO / TMCB 001M/(10-40)A (Short terminal cover) | 14-04-2026 10:09:02 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Jayash Enterprises(MII) Under PMA | Item Categories : AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 | |
| L2 | BENTEC INDIA LIMITED (MII) Under PMA | Item Categories : AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 | |
| L3 | ACCUMET SOLUTIONS (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 | |
| L4 | BILLTECH ELECTRICALS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 | |
| L5 | Bentex Control & Switchgear Co. (MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 |
Key insights about MADHYA PRADESH tender market
Bidders must submit per the ATC, provide IS 13779 (V2) compliant meters, include OEM authorization if required, and attach GST, PAN, financials, and experience certificates. The bid should reflect unit meter pricing, testing reports, and delivery terms aligned with the 25% quantity option Clause.
Submit GST registration, PAN, experience certificates for similar IS 13779 projects, financial statements, EMD proof as per ATC, technical compliance documentation, and OEM authorizations or service agreements ensuring IS 13779 (V2) conformance.
Meters must comply with IS 13779 (V2) energy meter standard; bidders should provide calibration/test reports and ATC-aligned technical documentation to prove conformance and interoperability with typical utility interfaces.
The purchaser may increase quantity up to 25% of bid quantity; delivery time adjusts by (Increase/Original Quantity) × Original delivery period, with a minimum of 30 days.
Prices must be quoted strictly per the ATC; delivery terms will align with the option clause and original delivery period, with the 30-day minimum extension applied when quantities increase.
Provide calibration reports, ISI or other recognized testing certificates, and ATC-specified documentation showing IS 13779 (V2) conformity and interoperability with standard energy meters.
Demonstrate prior supply of IS 13779 energy meters, show financial stability, possess GST/PAN, provide OEM authorization if applicable, and comply with ATC requirements for technical qualification.
Delivery scope is determined by order placement and the option clause; quantities may be adjusted by up to 25%, with extended delivery periods calculated per the formula and ATC guidelines.
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS