Weigh Belt Feeder
Indian Army
KANGRA, HIMACHAL PRADESH
Bid Publish Date
27-Feb-2026, 3:26 pm
Bid End Date
09-Mar-2026, 4:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Aruvappulam Grama Panchayat, under the Local Self Government Department Kerala, seeks procurement of a Weigh Belt Feeder (Q3) for implementation in Pathanamthitta, Kerala 686511. The data indicates an emphasis on Feed Rate Capacity (TPH) and Drive Type as core technical inputs, with the BOQ showing no listed items. The tender introduces an option clause allowing up to 25% quantity variation during and after contract award, at contracted rates. The delivery timeline hinges on the last delivery order date, with a minimum time frame of 30 days for extended periods. The opportunity is framed within a government procurement context, with a focus on equipment capable of precise material weighing and controlled feed for municipal or rural infrastructure projects.
Weigh Belt Feeder (Q3) with Feed Rate Capacity and Drive Type as primary inputs
BOQ shows 0 items; bidders must rely on project specs and ATC terms for detailed quantities
Delivery terms include option to increase quantity up to 25% with proportional delivery-time calculations
Delivery period starts from the last date of original delivery order; extended time uses (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
No explicit EMD or estimated value disclosed in available tender data
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Weigh Belt Feeder (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KANGRA, HIMACHAL PRADESH
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Nlc Tamil Nadu Power Limited
TUTICORIN, TAMIL NADU
Indian Army
WEST KAMENG, ARUNACHAL PRADESH
Bharuch District Panchayat
BHARUCH, GUJARAT
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | Feed Rate Capacity (In TPH) | 1-10 TPH |
| Generic | Drive Type | VFD/Variable Speed Drive |
GST registration certificate
PAN card
Proof of experience in supplying weigh belt feeders or similar material handling equipment
Financial statements or turnover evidence
Bid submission security/EMD details as per ATC
Technical compliance certificates and OEM authorizations if applicable
ATC document uploaded by buyer (review and submission as instructed)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | FLORET TECHNOLOGIES Under PMA | Make : NA Model : SE-901 | 06-03-2026 16:01:58 | |
| 2 | HAPPY HANDS GLOBAL Under PMA | Make : NA Model : SE-901 | 09-03-2026 14:53:11 | |
| 3 | PRO GRO BUSINESS SOLUTIONS Under PMA | Make : NA Model : SE-901 | 09-03-2026 00:07:07 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | FLORET TECHNOLOGIES( MSE Social Category:General ) Under PMA | Item Categories : Weigh Belt Feeder | |
| L2 | PRO GRO BUSINESS SOLUTIONS( MSE Social Category:General ) Under PMA | Item Categories : Weigh Belt Feeder | |
| L3 | HAPPY HANDS GLOBAL( MSE Social Category:SC ) Under PMA | Item Categories : Weigh Belt Feeder |
Please sign in or create an account to view contract details and download result documents.
Key insights about KERALA tender market
Bidders must submit GST registration, PAN card, experience certificates, financial statements, and bid security as per ATC. Also provide technical compliance certificates and OEM authorizations if applicable. The ATC uploaded by the buyer outlines any additional documents needed for submission.
The purchaser reserves the right to increase or decrease quantity up to 25% of bid/contracted quantity. Delivery timelines adjust based on the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days for added time.
Primary inputs are Feed Rate Capacity (TPH) and Drive Type. Bidders should provide specifications for belt width, belt speed, hopper capacity, motor power, control system compatibility, safety features, and dust control to meet project needs.
Delivery period begins from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as described and may extend up to the original delivery period when applicable, with a minimum 30 days increment.
EMD details are not disclosed in the available data; bidders should refer to the ATC document uploaded by the buyer to confirm the exact EMD amount, mode of payment, and submission deadline.
The tender data does not specify standards; bidders should verify in ATC for any required certifications, OEM authorizations, and compliance with local procurement regulations before bid submission.
The ATC document uploaded by the buyer contains additional terms, conditions, and submission requirements not visible in the basic notice. Bidders must review and comply with ATC specifics to ensure bid validity and eligibility.
Bidders should prepare scalable capacity plans and pricing that accommodate fluctuating orders. Include clear terms on unit rates, delivery schedules, and any impact on warranties or after-sales support when quantities change.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Kandla Port Trust
📍 KACHCHH, GUJARAT
Indian Space Research Organization
📍 ERNAKULAM, KERALA
📍 TELANGANA
Nuclear Power Corporation Of India Limited
📍 CHITTORGARH, RAJASTHAN
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS