TenderDekho Logo
Active GEM

Mormugao Port Trust Goa Inverter Type 3 Star Rated 3TR AC Supply Tender 2026

Bid Publish Date

29-Sep-2026, 3:37 pm

Bid End Date

20-Oct-2026, 4:00 pm

Value

₹4,46,316

Progress

Issue29-Sep-2026, 3:37 pm
AwardPending

Key Highlights

  • • IS-compliance requirements: IS 1391 Part 2, IS 10773, IS 4985, IS 694, IS 17409 2020
  • • Delivery to MPA store, Head Land Sada, Vasco-da-Gama, Goa within 15 days
  • • Performance security of 10% of total basic contract value for 36 months
  • • Liquidated damages at 0.5% of undelivered value per week

Tender Overview

The Mormugao Port Trust in South Goa, Goa invites bids for supplying an inverter-type 3 star rated three phase single split 3TR air conditioner with a complete set of listed accessories. The scope includes IS 1391 Part 2 compliance, IS 10773 compatible copper piping, IS 4985 drainage piping, IS 694 power cable, IS 17409 2020 insulation foam, Wrapping Tape, and stands for outdoor units, plus a powder-coated metal clad box. Estimated contract value is ₹446,316, with delivery required to the MPA store at Head Land Sada, Vasco-da-Gama, Goa, within 15 days of GEM contract generation. The supplier must also supply data sheets and ensure data-parameter alignment with offered products. Key differentiators include full accessory kit per IS standards and site-ready floor stands. This tender emphasizes IS-compliant, packaged AC units with compatible accessories for rapid deployment.

Technical Specifications & Requirements

  • Item: Inverter type 3 star rated three phase split AC (3TR) with standard accessories as per IS 1391 Part 2.
  • Accessories: Copper piping set (suction/discharge) per IS 10773, drain piping per IS 4985, power cable per IS 694, insulation foam per IS 17409 2020, wrapping tape (15 m), floor mounted stands for 1.5TR and 3TR outdoor units, powder-coated single-phase metal clad box for above ACs.
  • Location and delivery: MPA store, Head Land Sada, Vasco-da-Gama, Goa 403802; delivery within 15 days of GEM contract generation.
  • Documentation: submit product data sheet for each offered model; data sheet must match technical parameters; mismatches may lead to rejection.
  • Quality/compliance: IS 1391 Part 2, IS 10773, IS 4985, IS 694, IS 17409 2020 compliance required.
  • Financials: Estimated value ~ ₹446,316; EMD not specified in available data.
  • Additional terms: data sheet verification upon bid; packaging to withstand transport; environmental packing materials preferred.

Terms, Conditions & Eligibility

  • Delivery term: 15 days from GEM contract generation to MPA store, Goa.
  • Performance security: 10% of total basic contract value within 5 days of acceptance, valid for 36 months; payable via NEFT/RTGS/DD in favor of Financial Advisor & Chief Accounts Officer, Mormugao Port Authority, Goa.
  • Liquidated damages: 0.5% per week of undelivered quantity; penalties apply for delays.
  • Option clause: quantity may vary by up to ±25% at contract rates; extended delivery period allowed following the option formula.
  • Documents to submit with bid: PAN, GSTIN, cancelled cheque, EFT mandate; data sheet; OEM authorizations if applicable.
  • Packing: eco-friendly packaging; ensure safe transport to Goa store.
  • EMD: not specified in the provided data; bidders should verify current DGS&D/port authority guidelines and include applicable security as per policy.

Key Specifications

  • Inverter type 3 star rated three phase split AC, 3TR

  • IS 1391 Part 2 compliance

  • Copper piping set per IS 10773 (suction discharge)

  • Drain pipe per IS 4985

  • Power cable per IS 694

  • Insulation foam per IS 17409 2020

  • Wrapping tape 15 meters

  • Floor mounted stands for 1.5TR and 3TR outdoor units

  • Powder coated single phase metal clad box

Terms & Conditions

  • Delivery within 15 days to Goa MPA store

  • 10% performance security for 36 months

  • 0.5% weekly LD on overdue quantities

  • ±25% quantity variation rights for purchaser

  • Data sheet verification and IS compliance required

Important Clauses

Payment Terms

Security deposit of 10% within 5 days; payment schedule tied to supply milestones per GEM contract terms.

Delivery Schedule

Delivery to MPA store, Goa within 15 days of GEM contract generation; extended time only via option clause and calculated formula.

Penalties/Liquidated Damages

LD at 0.5% of total basic value per week for undelivered quantity, with maximum cumulative penalties governed by contract.

Bidder Eligibility

  • Proven experience in supplying air conditioning units with IS compliance

  • Financial stability evidenced by GST and PAN registration

  • Ability to provide data sheets matching offered product specifications

Advertisement

Tender Data

Bid Details

Quantity

141

Category

Supply of Inverter type 3 star rated three phase single split tower air conditioners 3TR as per IS 1391 Part 2 along with standard accessories

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

134

Past Performance

40 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Inverter type 3 star rated three phase single split tower air conditioners 3TR as per IS 1391 Part 2 along with standard accessories , Additional Copper pipe Set of suction and discharge pipe compatible for the above A C as per IS 10773 , Additional Drain pipe compatible for the above A C as per IS 4985 , Additional Power cable compatible for the above A C as per IS 694 , Additional Insulation Foam compatible for the above A C as per IS 17409 2020 , Wrapping Tape 15 Mtrs , Floor mounted stand for 1.5TR A C outdoor unit , Floor mounted stand for 3TR A C outdoor unit , Powder coated single phase metal clad box for above air conditioners

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

South Goa

Delivery Pincodes

403804

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Suraj Sadanand Desai403804,Materials Management Division Depot, Mormugao Port Authority, Near Civil Maintenance Office, Mormugao, Headland-Sada.South GoaGoa403804415-

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9962730.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Goa

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

Supply of Inverter type 3 star rated three phase single split tower air conditioners 3TR as per IS 1391 Part 2 along with standard accessories

Supply of Inverter type 3 star rated three phase single split tower air conditioners 3TR as per IS 1391 Part 2 along with standard accessories

4 nos Delivery: 15 days
#2

Additional Copper pipe Set of suction and discharge pipe compatible for the above A C as per IS 10773

Additional Copper pipe Set of suction and discharge pipe compatible for the above A C as per IS 10773

30 mtr Delivery: 15 days
#3

Additional Drain pipe compatible for the above A C as per IS 4985

Additional Drain pipe compatible for the above A C as per IS 4985

30 mtr Delivery: 15 days
#4

Additional Power cable compatible for the above A C as per IS 694

Additional Power cable compatible for the above A C as per IS 694

30 mtr Delivery: 15 days
#5

Additional Insulation Foam compatible for the above A C as per IS 17409 2020

Additional Insulation Foam compatible for the above A C as per IS 17409 2020

30 mtr Delivery: 15 days
#6

Wrapping Tape 15 Mtrs

Wrapping Tape 15 Mtrs

6 nos Delivery: 15 days
#7

Floor mounted stand for 1.5TR A C outdoor unit

Floor mounted stand for 1.5TR A C outdoor unit

2 nos Delivery: 15 days
#8

Floor mounted stand for 3TR A C outdoor unit

Floor mounted stand for 3TR A C outdoor unit

4 nos Delivery: 15 days
#9

Powder coated single phase metal clad box for above air conditioners

Powder coated single phase metal clad box for above air conditioners

5 nos Delivery: 15 days

Categories 32

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT mandate certified by bank

5

Product data sheet for offered model

6

OEM authorization (if applicable)

7

Bid submission data sheet alignment with technical parameters

Frequently Asked Questions

Key insights about GOA tender market

How to bid for inverter AC tender in Goa with IS compliance?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and product data sheets. Ensure IS 1391 Part 2 conformity and IS 10773/4985/694/17409 2020 alignment. Include OEM authorization if required and data-sheet verified against offered model.

What documents are required for Goa AC tender submission 2026?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, and the bid-specific data sheet. Include OEM authorization and product datasheet matching the offered 3TR inverter AC with all listed accessories. Ensure packaging and transit readiness documentation.

What are the payment terms and security deposit for this tender?

Performance security is 10% of total basic contract value due within 5 days of acceptance, valid for 36 months. Payment terms align with GEM contract milestones; ensure NEFT/RTGS/DD deposits and invoice submission accordingly.

What is the delivery timeline for Goa MPA store supply?

Delivery must occur within 15 days from GEM contract generation. Late deliveries incur liquidated damages at 0.5% per week of the undelivered quantity, with penalties calculated on total basic value.

Which IS standards must the AC and accessories meet for this tender?

AC unit must comply with IS 1391 Part 2; copper piping per IS 10773; drainage per IS 4985; power cable per IS 694; insulation per IS 17409 2020. Data sheets must reflect these standards for bid acceptance.

Can order quantities vary during contract execution for this tender?

Yes, purchaser may vary quantities by up to ±25% at contracted rates. Delivery timelines extend accordingly via the option clause, requiring re-calculated delivery periods with minimum 30 days base.

What are the packaging and transport requirements for Goa delivery?

Materials must be packed to withstand transport hazards using environmentally friendly packing. Ensure proper labeling and secure mounting hardware for outdoor units (stands) and boxed AC components.