Progress
Goa Shipyard Limited invites bids for Light Fittings with all items listed under the Price Break Up on Page 37 of the NIT & Specification Document, under the Department of Defence Production. The procurement location is in Goa. The BoQ reports 0 items, and there is no disclosed EMD or estimated value in the excerpt. A key bid condition is adherence to the option clause allowing a ±25% quantity variation at contract award and during the currency of the contract, at contracted rates. The tender references an ATC document, which bidders must review for any additional conditions. Unique aspect includes the absence of line-item BOQ details in the current data, requiring bidders to rely on the NIT and ATC for technical alignment.
Light fittings product category
Price Break Up page reference: Page 37 of NIT & Specification Doc
BOQ: 0 items (no quantities visible in excerpt)
Option Clause: ±25% quantity variation at contract/during currency
Delivery time formula: (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days
ATC document: Bidder to review for additional terms and standards
Option Clause permits 25% quantity variation at award and during contract
Delivery period may extend; minimum 30 days for added time
Review ATC for all bid-specific terms and required documentation
Not disclosed in excerpt; verify in ATC
Delivery periods linked to original and extended delivery periods with 30-day minimum extension rule
Not disclosed in excerpt; confirm in ATC and contract
Experience in supplying light fittings or similar electrical fixtures
Compliance with ATC and NIT Page 37 terms
Financial viability evidenced by statements or turnover
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Light Fittings with all items listed under Price Break Up on Page No. 37 of NIT & Specification Doc
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
South Goa
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South Goa | South Goa | - | - | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar light fittings supply
Financial statements or turnover proof
EMD/Security deposit documents (as per ATC)
Technical bid documents aligning with NIT Page 37
OEM authorizations or product certifications if required by ATC
Key insights about GOA tender market
Bidders must review the NIT Page 37 for item scope and consult the ATC for bid-specific terms. Ensure submission of GST, PAN, experience, and financial documents, plus OEM authorizations if required. Include the required EMD as directed in ATC and align delivery with the 25% option clause.
Required documents include GST certificate, PAN card, experience certificates for similar light fittings, financial statements, EMD documents, and technical bid materials aligned with NIT Page 37. OEM authorizations and product certifications may be necessary as per ATC, so review the uploaded ATC document.
Delivery time follows the option clause allowing up to 25% quantity variation. The timing uses the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; delivery starts from the last date of the original order.
ATC contains bid-specific terms not in the excerpt. Bidders must download and study the ATC for any additional requirements, certifications, payment terms, and potential penalties or performance bonds applicable to light fittings supply.
The exact deadline is not provided in the available data; bidders must refer to the NIT and ATC documents uploaded by Goa Shipyard Limited to confirm the submission date and process.
Specific standards are not disclosed in the excerpt. Bidder must consult the NIT Page 37 and ATC for required certifications, potential IS or BIS marks, and any brand/OEM requirements to ensure compliance before submission.
The EMD amount is not disclosed in the extract. Consult the ATC and NIT to determine the exact EMD or security deposit required and the acceptable payment method for submission.