Bid Publish Date
11-Aug-2026, 1:48 pm
Bid End Date
21-Aug-2026, 4:00 pm
Location
Progress
Bharat Heavy Electricals Limited (bhel) invites bids for BALL VALVE-1, BALL VALVE-2, ELECTRONIC TEMPERATURE SWITCH, SAFETY SHUT-OFF BLOCK, ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER, PRESSURE GAUGE- 1, PRESSURE GAUGE-2, MANIFOLD BLOCK-1, MANIFOLD BLOCK-2, DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED, PRESSURE REDUCING VALVE-PILOT OPERATED, PRESSURE RELIEF VALVE-1, TEMPERATURE SENSOR, FLOAT SWITCH CUM TRANSMITTER, RECIRCULATION PUMP MOTOR STATION ASSMLY, ELECTRIC MOTOR-1, AIR-OIL COOLER, BLADDER ACCUMULATOR, INT GEAR PUMP, ELECTRIC MOTOR-2, CHECK VALVE-1, FLUID LEVEL GAUGE, AIR FILTER, TEMPERATURE GAUGE WITH THERMOWELL, PRESSURE RELIEF VALVE-2, PRESSURE RELIEF VALVE-3, FLOW CONTROL VALVE, CHECK VALVE-2, EXT GEAR PUMP, CHECK VALVE-3, 3 WAY BALL VALVE, PRESSURE FILTER, DIFFERENTIAL PRESSURE SWITCH, FLEXIBLE HOSE in TIRUCHIRAPPALLI, TAMIL NADU. Quantity: 47. Submission Deadline: 21-08-2026 16: 00: 00. Submit your proposal before the deadline.
Quantity
47
Category
BALL VALVE-1
Bid Type
Single Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
BALL VALVE-1 , BALL VALVE-2 , ELECTRONIC TEMPERATURE SWITCH , SAFETY SHUT-OFF BLOCK , ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER , PRESSURE GAUGE- 1 , PRESSURE GAUGE-2 , MANIFOLD BLOCK-1 , MANIFOLD BLOCK-2 , DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED , PRESSURE REDUCING VALVE-PILOT OPERATED , PRESSURE RELIEF VALVE-1 , TEMPERATURE SENSOR , FLOAT SWITCH CUM TRANSMITTER , RECIRCULATION PUMP MOTOR STATION ASSMLY , ELECTRIC MOTOR-1 , AIR-OIL COOLER , BLADDER ACCUMULATOR , INT GEAR PUMP , ELECTRIC MOTOR-2 , CHECK VALVE-1 , FLUID LEVEL GAUGE , AIR FILTER , TEMPERATURE GAUGE WITH THERMOWELL , PRESSURE RELIEF VALVE-2 , PRESSURE RELIEF VALVE-3 , FLOW CONTROL VALVE , CHECK VALVE-2 , EXT GEAR PUMP , CHECK VALVE-3 , 3 WAY BALL VALVE , PRESSURE FILTER , DIFFERENTIAL PRESSURE SWITCH , FLEXIBLE HOSE
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
98
Delivery Locations
1
Delivery Cities
Tiruchirappalli
Delivery Pincodes
620014
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sujit Sangu | 620014,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI - 620014. TAMILNADU. INDIA. | Tiruchirappalli | Tamil Nadu | 620014 | 1 | 98 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
BALL VALVE-1
Refer Annexure-A for detailed description
BALL VALVE-2
Refer Annexure-A for detailed description
ELECTRONIC TEMPERATURE SWITCH
Refer Annexure-A for detailed description
SAFETY SHUT-OFF BLOCK
Refer Annexure-A for detailed description
ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER
Refer Annexure-A for detailed description
PRESSURE GAUGE-1
Refer Annexure-A for detailed description
PRESSURE GAUGE-2
Refer Annexure-A for detailed description
MANIFOLD BLOCK-1
Refer Annexure-A for detailed description
MANIFOLD BLOCK-2
Refer Annexure-A for detailed description
DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED
Refer Annexure-A for detailed description
PRESSURE REDUCING VALVE-PILOT OPERATED
Refer Annexure-A for detailed description
PRESSURE RELIEF VALVE-1
Refer Annexure-A for detailed description
TEMPERATURE SENSOR
Refer Annexure-A for detailed description
FLOAT SWITCH CUM TRANSMITTER
Refer Annexure-A for detailed description
RECIRCULATION PUMP MOTOR STATION ASSMLY
Refer Annexure-A for detailed description
ELECTRIC MOTOR-1
Refer Annexure-A for detailed description
AIR-OIL COOLER
Refer Annexure-A for detailed description
BLADDER ACCUMULATOR
Refer Annexure-A for detailed description
INT GEAR PUMP
Refer Annexure-A for detailed description
ELECTRIC MOTOR-2
Refer Annexure-A for detailed description
CHECK VALVE-1
Refer Annexure-A for detailed description
FLUID LEVEL GAUGE
Refer Annexure-A for detailed description
AIR FILTER
Refer Annexure-A for detailed description
TEMPERATURE GAUGE WITH THERMOWELL
Refer Annexure-A for detailed description
PRESSURE RELIEF VALVE-2
Refer Annexure-A for detailed description
PRESSURE RELIEF VALVE-3
Refer Annexure-A for detailed description
FLOW CONTROL VALVE
Refer Annexure-A for detailed description
CHECK VALVE-2
Refer Annexure-A for detailed description
EXT GEAR PUMP
Refer Annexure-A for detailed description
CHECK VALVE-3
Refer Annexure-A for detailed description
3 WAY BALL VALVE
Refer Annexure-A for detailed description
PRESSURE FILTER
Refer Annexure-A for detailed description
DIFFERENTIAL PRESSURE SWITCH
Refer Annexure-A for detailed description
FLEXIBLE HOSE
Refer Annexure-A for detailed description
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BALL VALVE-1 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 2 | BALL VALVE-2 | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 3 | ELECTRONIC TEMPERATURE SWITCH | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 4 | SAFETY SHUT-OFF BLOCK | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 5 | ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 6 | PRESSURE GAUGE-1 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 7 | PRESSURE GAUGE-2 | Refer Annexure-A for detailed description | 3 | set | boibuyer16 | 98 | |
| 8 | MANIFOLD BLOCK-1 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 9 | MANIFOLD BLOCK-2 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 10 | DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 11 | PRESSURE REDUCING VALVE-PILOT OPERATED | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 12 | PRESSURE RELIEF VALVE-1 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 13 | TEMPERATURE SENSOR | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 14 | FLOAT SWITCH CUM TRANSMITTER | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 15 | RECIRCULATION PUMP MOTOR STATION ASSMLY | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 16 | ELECTRIC MOTOR-1 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 17 | AIR-OIL COOLER | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 18 | BLADDER ACCUMULATOR | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 19 | INT GEAR PUMP | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 20 | ELECTRIC MOTOR-2 | Refer Annexure-A for detailed description | 2 | set | boibuyer16 | 98 | |
| 21 | CHECK VALVE-1 | Refer Annexure-A for detailed description | 4 | set | boibuyer16 | 98 | |
| 22 | FLUID LEVEL GAUGE | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 23 | AIR FILTER | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 24 | TEMPERATURE GAUGE WITH THERMOWELL | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 25 | PRESSURE RELIEF VALVE-2 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 26 | PRESSURE RELIEF VALVE-3 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 27 | FLOW CONTROL VALVE | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 28 | CHECK VALVE-2 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 29 | EXT GEAR PUMP | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 30 | CHECK VALVE-3 | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 31 | 3 WAY BALL VALVE | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 32 | PRESSURE FILTER | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 33 | DIFFERENTIAL PRESSURE SWITCH | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 | |
| 34 | FLEXIBLE HOSE | Refer Annexure-A for detailed description | 1 | set | boibuyer16 | 98 |
Extended Deadline
21-Aug-2026, 10:30 am
Opening Date
21-Aug-2026, 11:00 am
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer