TenderDekho Logo
Closed GEM

Tender Notice for BALL VALVE-1,BALL VALVE-2,ELECTRONIC TEMPERATURE SWITCH,SAFETY SHUT-OFF BLOCK,ELECTRONIC PRESSURE S in TIRUCHIRAPPALLI, TAMIL NADU

Bid Publish Date

11-Aug-2026, 1:48 pm

Bid End Date

21-Aug-2026, 4:00 pm

Generate Docs

Progress

Issue11-Aug-2026, 1:48 pm
Corrigendum16-Aug-2026
AwardPending

Bharat Heavy Electricals Limited (bhel) invites bids for BALL VALVE-1, BALL VALVE-2, ELECTRONIC TEMPERATURE SWITCH, SAFETY SHUT-OFF BLOCK, ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER, PRESSURE GAUGE- 1, PRESSURE GAUGE-2, MANIFOLD BLOCK-1, MANIFOLD BLOCK-2, DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED, PRESSURE REDUCING VALVE-PILOT OPERATED, PRESSURE RELIEF VALVE-1, TEMPERATURE SENSOR, FLOAT SWITCH CUM TRANSMITTER, RECIRCULATION PUMP MOTOR STATION ASSMLY, ELECTRIC MOTOR-1, AIR-OIL COOLER, BLADDER ACCUMULATOR, INT GEAR PUMP, ELECTRIC MOTOR-2, CHECK VALVE-1, FLUID LEVEL GAUGE, AIR FILTER, TEMPERATURE GAUGE WITH THERMOWELL, PRESSURE RELIEF VALVE-2, PRESSURE RELIEF VALVE-3, FLOW CONTROL VALVE, CHECK VALVE-2, EXT GEAR PUMP, CHECK VALVE-3, 3 WAY BALL VALVE, PRESSURE FILTER, DIFFERENTIAL PRESSURE SWITCH, FLEXIBLE HOSE in TIRUCHIRAPPALLI, TAMIL NADU. Quantity: 47. Submission Deadline: 21-08-2026 16: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Tender Data

Bid Details

Quantity

47

Category

BALL VALVE-1

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

BALL VALVE-1 , BALL VALVE-2 , ELECTRONIC TEMPERATURE SWITCH , SAFETY SHUT-OFF BLOCK , ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER , PRESSURE GAUGE- 1 , PRESSURE GAUGE-2 , MANIFOLD BLOCK-1 , MANIFOLD BLOCK-2 , DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED , PRESSURE REDUCING VALVE-PILOT OPERATED , PRESSURE RELIEF VALVE-1 , TEMPERATURE SENSOR , FLOAT SWITCH CUM TRANSMITTER , RECIRCULATION PUMP MOTOR STATION ASSMLY , ELECTRIC MOTOR-1 , AIR-OIL COOLER , BLADDER ACCUMULATOR , INT GEAR PUMP , ELECTRIC MOTOR-2 , CHECK VALVE-1 , FLUID LEVEL GAUGE , AIR FILTER , TEMPERATURE GAUGE WITH THERMOWELL , PRESSURE RELIEF VALVE-2 , PRESSURE RELIEF VALVE-3 , FLOW CONTROL VALVE , CHECK VALVE-2 , EXT GEAR PUMP , CHECK VALVE-3 , 3 WAY BALL VALVE , PRESSURE FILTER , DIFFERENTIAL PRESSURE SWITCH , FLEXIBLE HOSE

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

98

Delivery Locations

1

Delivery Cities

Tiruchirappalli

Delivery Pincodes

620014

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sujit Sangu620014,HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI - 620014. TAMILNADU. INDIA.TiruchirappalliTamil Nadu620014198-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9688579.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 34 Items Sign in for GEM prices

#1

BALL VALVE-1

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#2

BALL VALVE-2

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#3

ELECTRONIC TEMPERATURE SWITCH

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#4

SAFETY SHUT-OFF BLOCK

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#5

ELECTRONIC PRESSURE SWITCH CUM TRANSMITTER

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#6

PRESSURE GAUGE-1

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#7

PRESSURE GAUGE-2

Refer Annexure-A for detailed description

3 set Delivery: 98 days
#8

MANIFOLD BLOCK-1

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#9

MANIFOLD BLOCK-2

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#10

DIRECTIONAL SPOOL VALVE-SOLENOID OPERATED

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#11

PRESSURE REDUCING VALVE-PILOT OPERATED

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#12

PRESSURE RELIEF VALVE-1

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#13

TEMPERATURE SENSOR

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#14

FLOAT SWITCH CUM TRANSMITTER

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#15

RECIRCULATION PUMP MOTOR STATION ASSMLY

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#16

ELECTRIC MOTOR-1

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#17

AIR-OIL COOLER

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#18

BLADDER ACCUMULATOR

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#19

INT GEAR PUMP

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#20

ELECTRIC MOTOR-2

Refer Annexure-A for detailed description

2 set Delivery: 98 days
#21

CHECK VALVE-1

Refer Annexure-A for detailed description

4 set Delivery: 98 days
#22

FLUID LEVEL GAUGE

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#23

AIR FILTER

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#24

TEMPERATURE GAUGE WITH THERMOWELL

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#25

PRESSURE RELIEF VALVE-2

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#26

PRESSURE RELIEF VALVE-3

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#27

FLOW CONTROL VALVE

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#28

CHECK VALVE-2

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#29

EXT GEAR PUMP

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#30

CHECK VALVE-3

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#31

3 WAY BALL VALVE

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#32

PRESSURE FILTER

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#33

DIFFERENTIAL PRESSURE SWITCH

Refer Annexure-A for detailed description

1 set Delivery: 98 days
#34

FLEXIBLE HOSE

Refer Annexure-A for detailed description

1 set Delivery: 98 days

Categories 108

AGITATORS BP INSTRUMENT WATER DISTRIBUTION CONTROLLER SWITCHES ANIMAL WATERING MACHINES MISCELLANEOUS VALVE TEFLON HOSE ANGLE GLOBE VALVES LEVEL GUAGE COMPRESSOR PRESSURE SWITCHES TEMPERATURE SWITCHES NON RETURN VALVE SENSOR DOSING PUMP ARC VALVE HYDRAULIC PART WATER HOSE AIR REGULATORS GEYSER WELL TESTING EQUIPMENTS STIRRING HOTPLATES BOILERS FLUID AND GAS REGULATOR HYDRAULIC VALVES TEMPERATURE GAUGE WATER HEATER RADAR AND SONAR SYSTEMS AND COMPONENTS MAGNET VALVE TEMPERATURE SENSOR PRESSURE VESSEL DOSING DEVICE GAS RELEASE PANEL DEEPWELL PUMPS WATER PIPE LINE IRRIGATION PUMPS DIAPHRAGM VALVES INDICATING AND RECORDING INSTRUMENTS COOLER PRESSURE INDICATORS POSITIVE DISPLACEMENT PUMPS PNEUMATIC POSITIONER THERMOMETER FLOW REGULATOR CRYOGENIC STORAGE BOXES FLUID MECHANICS EQUIPMENT COMPRESSED AIR GLUCOSE MONITORS HYDRAULIC POWER PACK TRANSMITTER LABORATORY PRESSES PNEUMATIC VALVES PUMP VALVES WEATHER MACHINE, MONITORING SYSTEM AND EQUIPMENTS PNEUMATIC PRESSURE GAUGE VALVES THERMOWELLS WATER SUPPLY PROJECT PRESSURE REGULATOR THERMOCOUPLES TEMPERATURE INDICATOR AIR INFLATORS VALVE DISPLACEMENT PUMP FLOW SWITCHES PRESSURE MEASURING AND CONTROL INSTRUMENTS GEAR PINCH VALVES AIR GENERATOR SOLENOID VALVES TURBINE PUMPS AIRCRAFT HYDRAULIC SYSTEMS RIPENING TANK SLIDER VALVES TURBINE OIL HYDRAULIC ENGINES HEATING EQUIPMENT SPARES ANAESTHESIA MACHINE ABRASIVE JET MACHINING EQUIPMENT RADIAL FIN FILTERS SUMP PUMPS BOILER MOUNTING VALVE HYDRO-MECHANICAL EQUIPMENT PYROMETERS FIRE SPRINKLER FIRE BREATHING APPARATUS SOLAR WATER HEATER AIR MANIFOLDS BI METALLIC SENSORS SOLAR GEYSER SUBMERSIBLE PUMP GAUGE FLOAT SWITCHES RECIPROCATING PUMPS OSCILLATING PUMPS ROTARY COMPRESSOR ROTARY PUMP FLEXIBLE PIPE DUPLEX PUMPS BOILER VALVE HYDRAULIC REVERSE OSMOSIS PLANT AIR SHOWER ELECTROMAGNET BOYLES APPARATUS ACCUMULATOR TURBO COMPRESSORS

Corrigendum Updates

1 Update
#1

Update

16-Aug-2026

Extended Deadline

21-Aug-2026, 10:30 am

Opening Date

21-Aug-2026, 11:00 am

Required Documents

1

Additional Doc 1 (Requested in ATC)

2

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer