Bid Publish Date
13-Aug-2026, 6:14 pm
Bid End Date
24-Aug-2026, 5:00 pm
Location
Progress
Rashtriya Ispat Nigam Limited, a central steel producer, invites bids for a PIPE CLAMP with 33.7MM steel ladle argon pipe category, issued for VISAKHAPATNAM, ANDHRA PRADESH. The BOQ shows zero items, and financial details (estimated value and EMD) are not disclosed in the available data. The tender includes an option clause enabling quantity adjustments up to ±25% and a flexible delivery timeline tied to original delivery periods. This procurement appears focused on steel clamp components used in high-temperature metal handling, with unique clauses governing quantity variation and delivery extensions.
Product/service: PIPE CLAMP for 33.7MM steel ladle argon pipe
Estimated value: Not disclosed in current data
EMD: Not disclosed in current data
Standards/Certifications: Not specified in available data
Delivery framework: Option to increase/decrease quantity up to 25%; delivery extensions linked to original delivery period with minimum 30 days
Experience: Not explicitly stated; provide evidence of capability for steel clamps or argon pipe components
Quantity may be adjusted by ±25% at contract and during currency
Delivery period aligned with original delivery order; extension rules apply
Suppliers must submit standard bid documents including GST, PAN, and authorizations
Options to modify quantity up to 25% at contract and during currency; additional time calculation follows (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Experience in supplying steel clamps or similar high-temperature pipe fittings
GST registration and financial stability documentation
Manufacturer authorization or OEM backing (if bidding as dealer)
Quantity
500
Bid Type
Single Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PIPE CLAMP, 33.7MM, STEEL LADLE ARGON PIPE
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Visakhapatanam
Delivery Pincodes
530031
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Chikkala Madhu Sudana Rao | 530031,CENTRAL STORES BUILDING VISAKHAPATNAM STEEL PLANT | Visakhapatanam | Andhra Pradesh | 530031 | 500 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar clamp/steel component supply
Financial statements (last 2-3 years) or bank statements
EMD/Security deposit proof (amount not disclosed in data)
Technical bid documents demonstrating capability to manufacture/assemble PIPE CLAMP 33.7MM
OEM authorizations or manufacturer’s authorization letters (if bidding as distributor)
Key insights about ANDHRA PRADESH tender market
Bidders should prepare GST, PAN, financial statements, and supplier authorization; submit OEM support if applicable. The purchase includes an option to adjust quantity by ±25% and a flexible delivery period. Review the ATC terms and ensure capability to meet 33.7MM clamp fabrication for argon piping.
Submit GST certificate, PAN, experience certificates for similar clamps, last 2–3 years financials, EMD proof (amount not disclosed), technical compliance documents, and OEM authorization letters if bidding as distributor. Ensure alignment with the supplier qualification criteria.
Delivery follows the option clause: quantity may increase/decrease by up to 25%, with additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, and starts from the last date of the original delivery order.
Current data lacks explicit technical specs. Bidders should demonstrate capability in producing high-temperature pipe clamps for argon-ladle systems, with emphasis on dimensional accuracy for 33.7mm fittings, metallurgy suitable for steel ladle environments, and traceability documentation.
EMD amount is not disclosed in the available tender data. Bidder should be prepared to submit standard EMD as per organization guidelines, typically a fixed value or percentage of estimated contract value, in line with Rashtriya Ispat Nigam Limited norms.
If quantity is increased, the new delivery time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days; the purchaser may extend this to cover the remaining original delivery period if needed.
Current tender data does not specify standards. Bidders should ensure ISO/quality management, welding/test certifications, and supplier traceability; presence of OEM authorizations may be advantageous for credibility in Rashtriya Ispat Nigam Limited procurement in Visakhapatnam.
Start and end dates are not provided in the publicly available data. Bidders should monitor the organization’s procurement portal for activity timelines and ensure readiness to submit complete documents, including GST, PAN, and technical compliance, once the tender is published.