TenderDekho Logo
Closed GEM

Tender Notice for Knuckle Brg,King Pin,Pipe Brake No 2,Suspension Bush Kit,Cyl Assy Rear wheel RH,Fuel Pump Motor,Cyl in TAWANG, ARUNACHAL PRADESH

Bid Publish Date

05-Jan-2025, 7:21 pm

Bid End Date

27-Jan-2025, 8:00 pm

Value

₹5,00,000

Progress

Issue05-Jan-2025, 7:21 pm
Technical27-01-2025 16:17:31
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

89

Category

Knuckle Brg

Bid Type

Two Packet Bid

Categories 34

Indian Army has released a public tender for Knuckle Brg, King Pin, Pipe Brake No 2, Suspension Bush Kit, Cyl Assy Rear wheel RH, Fuel Pump Motor, Cyl Head Gasket, Bearing Ft Wheel, Self Bendix Pinion, Mtg RH Front LH, Tie Rod End steering, Pipe Brake No 3, Solenoid Switch Assy, Rear hub bearing, Sensor Assy Cam Position, Clutch Assy Fan, Part Kit Power Steering, Switch Assy Oil Pressure in TAWANG, ARUNACHAL PRADESH. Quantity: 89. Submission Deadline: 27-01-2025 20: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Knuckle Brg , King Pin , Pipe Brake No 2 , Suspension Bush Kit , Cyl Assy Rear wheel RH , Fuel Pump Motor , Cyl Head Gasket , Bearing Ft Wheel , Self Bendix Pinion , Mtg RH Front LH , Tie Rod End steering , Pipe Brake No 3 , Solenoid Switch Assy , Rear hub bearing , Sensor Assy Cam Position , Clutch Assy Fan , Part Kit Power Steering , Switch Assy Oil Pressure

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7336841.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

Knuckle Brg

Knuckle Brg

10 nos Delivery: 21 days
#2

King Pin

King Pin

10 nos Delivery: 21 days
#3

Pipe Brake No 2

Pipe Brake No 2

3 nos Delivery: 21 days
#4

Suspension Bush Kit

Suspension Bush Kit

4 nos Delivery: 21 days
#5

Cyl Assy Rear wheel RH

Cyl Assy Rear wheel RH

5 nos Delivery: 21 days
#6

Fuel Pump Motor

Fuel Pump Motor

4 nos Delivery: 21 days
#7

Cyl Head Gasket

Cyl Head Gasket

3 nos Delivery: 21 days
#8

Bearing Ft Wheel

Bearing Ft Wheel

6 nos Delivery: 21 days
#9

Self Bendix Pinion

Self Bendix Pinion

5 nos Delivery: 21 days
#10

Mtg RH Front LH

Mtg RH Front LH

10 nos Delivery: 21 days
#11

Tie Rod End steering

Tie Rod End steering

4 nos Delivery: 21 days
#12

Pipe Brake No 3

Pipe Brake No 3

3 nos Delivery: 21 days
#13

Solenoid Switch Assy

Solenoid Switch Assy

4 nos Delivery: 21 days
#14

Rear hub bearing

Rear hub bearing

5 nos Delivery: 21 days
#15

Sensor Assy Cam Position

Sensor Assy Cam Position

4 nos Delivery: 21 days
#16

Clutch Assy Fan

Clutch Assy Fan

1 nos Delivery: 21 days
#17

Part Kit Power Steering

Part Kit Power Steering

4 nos Delivery: 21 days
#18

Switch Assy Oil Pressure

Switch Assy Oil Pressure

4 nos Delivery: 21 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
ASSOCIATE SUPPLIERS   Under PMA
-27-01-2025 16:17:31
2
RAJDHANI TRADERS   Under PMA
-27-01-2025 16:23:53
3
SPARES CORPORATION   Under PMA
-25-01-2025 12:58:56

Financial Results

Rank Seller Price Item
L1
SPARES CORPORATION(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Knuckle Brg,King Pin,Pipe Brake No 2,Suspension Bush Kit,Cyl Assy Rear wheel RH,Fuel Pump Motor,Cyl
L2
ASSOCIATE SUPPLIERS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Knuckle Brg,King Pin,Pipe Brake No 2,Suspension Bush Kit,Cyl Assy Rear wheel RH,Fuel Pump Motor,Cyl
L3
RAJDHANI TRADERS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Knuckle Brg,King Pin,Pipe Brake No 2,Suspension Bush Kit,Cyl Assy Rear wheel RH,Fuel Pump Motor,Cyl

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

What are the eligibility requirements for the tender?

The eligibility requirements include being a registered entity, possessing relevant certifications, and having prior experience in providing similar components. Additionally, bidders must demonstrate financial stability through past performance metrics and a suitable turnover as outlined in the bid documents.

What documents are required to be submitted?

Bidders must submit documents such as proof of registration, experience criteria documentation, relevant past performance data, and financial statements. It's crucial to ensure that all submissions comply with acceptable formats as specified in the tender.

Is there a registration process for this tender?

Yes, bidders must follow a registration process on the designated procurement portal. This involves setting up an account and ensuring that all necessary documentation is uploaded for approval.

What document formats are accepted?

Documents must be submitted in commonly accepted PDF formats. Any specific requirements regarding format can be found in the tender documentation linked.

What are the technical specifications for the components?

The technical specifications for the components are detailed in the tender document. Bidders must ensure compliance with these specifications, which are crucial for operational excellence within military applications.

Are there specific quality standards that apply?

Yes, all supplied components must meet specific quality standards required for military equipment. Bidders should refer to the tender documents for detailed specifications related to quality assurance.

What are the compliance requirements?

Bidders are required to comply with all compliance requirements pertaining to the tender, including adherence to applicable regulations and standards in the procurement process.

Are there any performance security requirements?

Yes, performance security requirements are outlined in the tender documents. Bidders must review these provisions to ensure compliance and meet expectations.

What will the payment terms be for the tender?

Payment terms are stipulated in the tender documentation. Bidders must review these terms carefully to understand the financial expectations post-delivery.

How will the price evaluation be conducted?

The price evaluation will be conducted through a total value-wise evaluation method, considering both the technical and financial aspects submitted by each bidder.

Can I submit documents electronically?

Yes, submissions must be made electronically through the designated procurement portal, adhering to the submission guidelines outlined in the tender.

What key timelines should bidders be aware of?

Key timelines, including submission deadlines and opening dates, are detailed in the tender documents. Bidders should ensure to adhere to these timelines for a successful submission.

How will the evaluation and selection process work?

The evaluation and selection process will follow a two packet system, where technical bids and financial bids are evaluated separately to ensure a comprehensive assessment.

When will the results of the tender be communicated?

Results will be communicated as stipulated in the tender documentation. Bidders are advised to monitor the portal for updates regarding the results.

What benefits are offered to Micro, Small, and Medium Enterprises (MSEs)?

MSEs are offered special provisions under this tender to promote inclusivity and support local economic growth. Bidders should refer to the specific sections in the tender for details.

How does this tender align with 'Make in India' policies?

This tender emphasizes the procurement of local components and supports initiatives aligned with Make in India policies by encouraging local manufacturers to bid for supplying the required components.