Araria District Panchayats LED Luminaire for High Bay Lighting Tender Bihar 2025 Q3
Araria District Panchayats
ARARIA, BIHAR
Bid Publish Date
01-Jan-2026, 7:06 pm
Bid End Date
12-Jan-2026, 8:00 pm
Location
Progress
Quantity
1
The procurement by Tmc Afzalpur under the Directorate Of Municipal Administration seeks LED Luminaire for High Bay Lighting for the city of GULBARGA, KARNATAKA 585101. Scope covers installation and commissioning of high bay luminaires with input power, cables, and installation accessories. The bid includes design drawing approvals prior to fabrication and a flexible quantity policy allowing up to 25% quantity variance and potential extensions with proportional delivery time. Unique requirements include test certificates on demand, and LM 79/LM 80 and TM 21 reports from recognized labs. The contract emphasizes delivery to the specified address and adherence to buyer-driven design iterations. This tender requires rigorous compliance with safety, performance, and testing standards, and includes options for modifications based on buyer approval without LD penalties for drawing delays. The opportunity is location-specific to Gulbarga, Karnataka, with a focus on municipal lighting upgrades and reliable supply chain delivery.
LED high bay luminaire with installation and commissioning scope
Voltage range and wattage specifications; lumen efficacy targets
CCT around 5000K (±500K) and CRI percentage requirement
PF performance, IP rating, surge protection (internal/external), surge/ transients protection
Thermal and environmental operating temp range; flame/fire safety claims (if any)
LM 79, LM 80, TM 21 lab reports from NABL/ILAC-accredited labs
Option to vary quantity by ±25% at contract award and during currency
7-day window for Detailed Design Drawings approval; modifications within 7 days
Delivery to TMC Afzalpur with no LD for drawing delays; GST handled by bidder
Bid price must include supply, installation, testing and commissioning; GST reimbursement as per actuals or applicable rates; no LD specified for payment delays
Delivery period aligned with option clause; additional time calculation formula provided; minimum 30 days if extended
Penalties governed by buyer terms; LD details not explicitly stated in summary; adherence to delivery and testing milestones required
Non-liquidation, non-bankruptcy status; no court receivership
Minimum three-year turnover as per bid document; certified financial statements or CA certificate
GST registration; compliance with GST norms; bid submission with required certificates
Araria District Panchayats
ARARIA, BIHAR
Southern Railway
CHENNAI, TAMIL NADU
N/a
Araria District Panchayats
ARARIA, BIHAR
Osmanabad District Panchayats
OSMANABAD, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| STANDARDS | Installation and commissioning | Yes, No |
| STANDARDS | Scope of installation and commissioning | Installation and commissioning includes mounting of lights on roof hooks/fixture and making electrical connections to make the light functional. Wiring is not in scope., Not applicable |
| RATINGS | Operating input voltage range (in Volts) | 100 to 280, 120 to 277, 140 to 270, 140 to 300, 160 to 265, 110 to 320 |
| RATINGS | Luminaire System Wattge (in Watts) | 80, 100, 120, 130, 140, 150, 180, 200, 240, 250, 300, 110 |
| RATINGS | Luminaire System Efficacy - Lumen output - (Lumen/watt) | ≥ 120, ≥ 90 |
| RATINGS | Color Temperature (CCT) +/- 500 K (in Kelvin) | 3500 K, 4500 K, 5500 K, 6000 K |
| RATINGS | Colour Rendering Index (CRI) (in % age) | ≥ 70, ≥ 80 |
| RATINGS | Power Factor (PF) | ≥ 0.95 at full load, ≥ 0.90 at full load |
| RATINGS | Ingress Protection (IP) Rating of Luminaire (agreed to furnish test certificates to buyer / consignee on demand) | IP 54, IP 55, IP 65, IP 66, IP 67 |
| RATINGS | Impact resistance (If claimbed "Yes" - agreed to furnish test certificates to buyer / consignee on demand) | Yes. IK07 (as per IEC 62262:2002), Yes. IK08 (as per IEC 62262:2002) |
| RATINGS | Minimum operating temperature range (in deg. C) | -10 to 0 |
| RATINGS | Maximum operating temperature range (in deg. C) | 45 - 60 |
| SAFETY | The luminaire shall be protected against surges and transients ( Internal) | ≥ 5 KV, ≥ 6 KV |
| SAFETY | The luminaire shall be protected against surges and transients (External) | ≥ 10 KV |
| SAFETY | Flame/Fire proof compliance (If claimbed - agreed to furnish test certificates to buyer / consignee on demand) | Fire retardant Class - FV-0 (as per IS:11731 Part-II), Flame proof, IIA, T6 temp. Class (as per IS/IEC 60079-0 & 1 : 2007 latest), No |
| SAFETY | Other compliacne (If claimbed - agreed to furnish test certificates to buyer / consignee on demand) | EMC (as per IEC:61000-3-2:2014 latest), EMC (as per IEC:61000-3-3:2014 latest), No |
| CONSTRUCTION | Shape of Luminaire | Round, Square, Rectangle |
| CONSTRUCTION | Type of mounting | Metallic adjustable Brackets with Eye Bolt |
| CONSTRUCTION | Installation height range from floor level (in m) - Must declare | 9 - 50 |
| CONSTRUCTION | Optic Lens | Yes. Polycarbonate-UV stabilised, No |
| CONSTRUCTION | Type of Control Gear | Constant Current |
| CONSTRUCTION | Number of electronic control gear on each luminaire (power supplies) - (in Nos.) | 1, 2 |
| CONSTRUCTION | Luminaire fitted with connecting cables for input power | ISI Marked 3 Core cable for input power ( Length:250 mm ), ISI Marked 3 Core cable for input power ( Length:500 mm ) |
| CONSTRUCTION | Accessories for each luminaire | Metallic adjustable Brackets (Stainless steel), SS Eye Bolts (as per IS:4190:1984 latest), Set of Bolt,Nut, Washers (SS), Die cast aluminium brackets, Metallic Adjustable Brackets (Stainless Steel) provided along with the fixtures for ceiling mounted high bay light fixtures |
| MARKING | Marking/Identification details on inside of each luminaire and outside of each packing box | Manufacturer's Name, Model Number, Serial Number, Month and year of manufacturing, Voltage, System Wattage |
| MARKING | Marking/Identification details on each control gear | Manufacturer's Name, Model Number |
| CERTIFICATIONS | Warranty period (in Months) | 24, 36, 48, 60 Or higher |
| CERTIFICATIONS | Availability of test reports from Central Govt. Lab/NABL/ILAC accrediated laboratory to prove conformity of the specification | Yes, No |
| CERTIFICATIONS | Agreed to furnish LM 79 , LM 80 reports from Central Government lab/NABL/ILAC accrediated lab | Yes as per IS:16106:2012 latest and as per IS:16105:2012 latest |
| CERTIFICATIONS | Agreed to furnish TM 21 report from Central Government lab/NABL/ILAC accredited lab | Yes, No |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar LED high bay lighting projects
Audited financial statements or CA/CMA certificate showing turnover
EMD/Security deposit documents (as applicable)
Technical bid documents and compliance certificates
OEM authorization letters (if applicable)
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, experience certificates and audited turnover; provide OEM authorizations if required; ensure LM 79/LM 80 and TM 21 test reports from NABL/ILAC labs; include Detailed Design Drawings within 7 days of award.
Required documents include GST certificate, PAN, 3-year turnover proofs, experience certificates for similar projects, EMD details, technical bid and compliance certificates, and OEM authorizations if applicable; ensure lab reports (LM 79/LM 80, TM 21) available on demand.
Key specs include operating voltage range, lumen efficacy (lm/W), CCT around 5000K ±500K, CRI percentage, PF, IP rating, surge protection (internal/external), and min/max operating temperatures; LM 79/LM 80 and TM 21 lab reports required.
Successful bidder must submit Detailed Design Drawings within 7 days of award; buyer approves or lists modifications within 7 days; approval delays may shift delivery without LD penalties.
The purchaser may increase or decrease quantity up to 25% of the bid quantity at contract placement and during the contract currency at contracted rates; delivery time adjusts accordingly.
Tender requires LM 79, LM 80, and TM 21 reports from Central Government/NABL/ILAC-accredited labs to prove conformity; these must be furnished on demand during bid evaluation.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS