TenderDekho Logo
GEM

Invitation to Bid - Supply of square 12X20 mm size of PVC , ISI Marked casing -capping,Supply of 1.5 sq.mm. PVC insulat in SOUTH GOA, GOA

Bid Publish Date

23-Sep-2025, 5:31 pm

Bid End Date

14-Oct-2025, 1:00 pm

EMD

₹2,13,404

Value

₹71,13,453

Progress

Issue23-Sep-2025, 5:31 pm
Technical13-10-2025 20:36:18
Financial
Award31-Dec-2025, 12:20 am
Explore all 4 tabs to view complete tender details

Quantity

19379

Category

Supply of 1100V Grade, armoured al cable 500 sq. mm. X 3.5 core

Bid Type

Two Packet Bid

Categories 62

Airports Authority Of India has released a public tender for Supply of square 12X20 mm size of PVC, ISI Marked casing -capping, Supply of 1. 5 sq. mm. PVC insulat in SOUTH GOA, GOA. Quantity: 19379. Submission Deadline: 14-10-2025 13: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8388659.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 115 Items Sign in for GEM prices

#1

Supply of square 12X20 mm size of PVC , ISI Marked casing -capping

As per specification document , Schedule of Quantity , Item No 1 at page-62, BOQ-1

400 each Delivery: 60 days
#2

Supply of 1.5 sq.mm. PVC insulated multistrand single core Copper wire

As per specification document , Schedule of Quantity , Item No 2 at page-62, BOQ-1

3,060 metre Delivery: 60 days
#3

Supply of 2.5 sq.mm. PVC insulated multistrand single core Copper wire

As per specification document , Schedule of Quantity , Item No 3 at page-62, BOQ-1

3,060 metre Delivery: 60 days
#4

Supply of 4 sq.mm. PVC insulated multistrand single core Copper wire

As per specification document , Schedule of Quantity , Item No 4 at page-62, BOQ-1

3,060 metre Delivery: 60 days
#5

supply of 2 core, 1.5 sq.mm cable

As per specification document , Schedule of Quantity , Item No 5 at page-62, BOQ-1

500 metre Delivery: 60 days
#6

supply of 3 core, 1.5 sq.mm cable

As per specification document , Schedule of Quantity , Item No 6 at page-62, BOQ-1

500 metre Delivery: 60 days
#7

supply of 3 core, 2.5 sq.mm cable

As per specification document , Schedule of Quantity , Item No 7 at page-62, BOQ-1

500 metre Delivery: 60 days
#8

supply of 4 core, 4.0 sq.mm cable

As per specification document , Schedule of Quantity , Item No 8 at page-62, BOQ-1

500 each Delivery: 60 days
#9

Supply of 1100V armoured al cable 10 sq. mm. X 4 core

As per specification document , Schedule of Quantity , Item No 9 at page-62, BOQ-1

300 metre Delivery: 60 days
#10

Supply of 1100V armoured al cable 16 sq. mm. X 4 core

As per specification document , Schedule of Quantity , Item No 10 at page-62, BOQ-1

300 metre Delivery: 60 days
#11

Supply of 1100V Grade armoured al cable 25 sq. mm. X 4 core

As per specification document , Schedule of Quantity , Item No 11 at page-62, BOQ-1

300 metre Delivery: 60 days
#12

Supply of 1100V Grade, armoured alcable 35 sq. mm. X 3.5 core

As per specification document , Schedule of Quantity , Item No 12 at page-62, BOQ-1

300 metre Delivery: 60 days
#13

Supply of 1100V Grade, armoured al cable 500 sq. mm. X 3.5 core

As per specification document , Schedule of Quantity , Item No 13 at page-62, BOQ-1

200 metre Delivery: 60 days
#14

Box Type Heavy Duty Capacitor of 3Phase 440Volts, 12.5 Kvar

As per specification document , Schedule of Quantity , Item No 14 at page-62, BOQ-1

10 each Delivery: 60 days
#15

Box Type Heavy Duty Capacitor of 3Phase 440Volts, 25 Kvar

As per specification document , Schedule of Quantity , Item No 15 at page-62, BOQ-1

10 each Delivery: 60 days
#16

Box Type Heavy Duty Capacitor of 3Phase 440Volts, 50 Kvar, 50Hz.

As per specification document , Schedule of Quantity , Item No 16at page-62, BOQ-1

10 each Delivery: 60 days
#17

Capacitor Duty Contactors for 12.5KVar, 440V , 3ph, 50Hz Cap Bank.

As per specification document , Schedule of Quantity , Item No 17 at page-62, BOQ-1

10 each Delivery: 60 days
#18

Capacitor Duty Contactorsfor 25KVar, 440V , 3ph, 50Hz Capacitor.

As per specification document , Schedule of Quantity , Item No 18 at page-62, BOQ-1

10 each Delivery: 60 days
#19

Capacitor Duty Contactors for 50KVar, 440V , 3ph, 50Hz Capacitor.

As per specification document , Schedule of Quantity , Item No 19 at page-63, BOQ-2

10 each Delivery: 60 days
#20

Capacitor Duty Contactorsfor 100KVar, 440V , 3ph, 50Hz Capacitor Bank.

As per specification document , Schedule of Quantity , Item No 20 at page-63, BOQ-2

15 each Delivery: 60 days
#21

copper lugs_ tube terminal ring type 16 sq. mm.

As per specification document , Schedule of Quantity , Item No 21 at page-63, BOQ-2

100 each Delivery: 60 days
#22

copper lugs_reducer terminal pin type 16 sq. mm.

As per specification document , Schedule of Quantity , Item No 22at page-63, BOQ-2

100 each Delivery: 60 days
#23

copper lugs_ reducer terminal U- type 2.5 sq. mm.

As per specification document , Schedule of Quantity , Item No 23 at page-63, BOQ-2

100 each Delivery: 60 days
#24

copper lugs_ reducer terminal U- type 4 sq. mm.

As per specification document , Schedule of Quantity , Item No 24 at page-63, BOQ-2

100 each Delivery: 60 days
#25

aluminium lugs tube_ring type 16 sq. mm.

As per specification document , Schedule of Quantity , Item No 25 at page-63, BOQ-2

100 each Delivery: 60 days
#26

aluminium lugs tube_ring type 95 sq. mm

As per specification document , Schedule of Quantity , Item No 26 at page-63, BOQ-2

30 each Delivery: 60 days
#27

aluminium lugs tube_ring type 120 sq. mm.

As per specification document , Schedule of Quantity , Item No 27 at page-63, BOQ-2

30 each Delivery: 60 days
#28

aluminium lugs tube_ring type 150 sq. mm.

As per specification document , Schedule of Quantity , Item No 28 at page-63, BOQ-2

20 each Delivery: 60 days
#29

aluminium lugs tube_ring type 185 sq. mm.

As per specification document , Schedule of Quantity , Item No 29 at page-63, BOQ-2

20 each Delivery: 60 days
#30

aluminium lugs tube_ring type 240 sq. mm.

As per specification document , Schedule of Quantity , Item No 30 at page-63, BOQ-2

30 each Delivery: 60 days
#31

aluminium lugs tube_ring type 300 sq. mm.

As per specification document , Schedule of Quantity , Item No 31 at page-63, BOQ-2

30 each Delivery: 60 days
#32

aluminium lugs tube_ring type 500 sq. mm.

As per specification document , Schedule of Quantity , Item No 32 at page-63, BOQ-2

20 each Delivery: 60 days
#33

aluminium lugs_reducer terminal pin type 16 sq. mm.

As per specification document , Schedule of Quantity , Item No 33 at page-63, BOQ-2

100 each Delivery: 60 days
#34

SS Gland for Aluminium cable 28 mm.

As per specification document , Schedule of Quantity , Item No 34 at page-63, BOQ-2

30 each Delivery: 60 days
#35

SS Gland for Aluminium cable 32 mm.

As per specification document , Schedule of Quantity , Item No 35 at page-63, BOQ-2

60 each Delivery: 60 days
#36

SS Gland for Aluminium cable 35 mm.

As per specification document , Schedule of Quantity , Item No 36 at page-63, BOQ-2

20 each Delivery: 60 days
#37

SS Gland for Aluminium cable 38 mm.

As per specification document , Schedule of Quantity , Item No 37 at page-63, BOQ-2

20 each Delivery: 60 days
#38

SS Gland for Aluminium cable 45 mm.

As per specification document , Schedule of Quantity , Item No 38 at page-63, BOQ-2

40 each Delivery: 60 days
#39

SS Gland for Aluminium cable 88 mm.

As per specification document , Schedule of Quantity , Item No 39 at page-63, BOQ-2

10 each Delivery: 60 days
#40

Supply of ISI Marked 4 X 4 inch PVC box.

As per specification document , Schedule of Quantity , Item No 40 at page-63, BOQ-2

50 each Delivery: 60 days
#41

Supply of ISI Marked 6X 4 inch PVC box.

As per specification document , Schedule of Quantity , Item No 41 at page-63, BOQ-2

100 each Delivery: 60 days
#42

Supply of ISI Marked 6 X 8 inch PVC box.

As per specification document , Schedule of Quantity , Item No 42 at page-63, BOQ-2

100 each Delivery: 60 days
#43

Supply of ISI Marked 8 X 10 inch PVC box.

As per specification document , Schedule of Quantity , Item No 43 at page-63, BOQ-2

50 each Delivery: 60 days
#44

Supply of L and T make 14 step APFC reactive power manager Aux supply 415v

As per specification document , Schedule of Quantity , Item No 44 at page-63, BOQ-2

3 each Delivery: 60 days
#45

Supply of 5A Socket modular legrand white 573470

As per specification document , Schedule of Quantity , Item No 45 at page-64, BOQ-3

300 each Delivery: 60 days
#46

Supply of 6A socket legrand M 675551

As per specification document , Schedule of Quantity , Item No 46 at page-64, BOQ-3

200 each Delivery: 60 days
#47

Supply of 5A switch modular legrand white 573400

As per specification document , Schedule of Quantity , Item No 47 at page-64, BOQ-3

200 each Delivery: 60 days
#48

Supply of 15A socket modular legrand white 674515

As per specification document , Schedule of Quantity , Item No 48 at page-64, BOQ-3

200 each Delivery: 60 days
#49

Supply of 15A switch modular legrand white 573410

As per specification document , Schedule of Quantity , Item No 49 at page-64, BOQ-3

100 each Delivery: 60 days
#50

Supply of 5A switch Piano

As per specification document , Schedule of Quantity , Item No 50 at page-64, BOQ-3

500 each Delivery: 60 days
#51

Supply of 5A socket Piano

As per specification document , Schedule of Quantity , Item No 51 at page-64, BOQ-3

300 each Delivery: 60 days
#52

Supply of 15A switch Piano

As per specification document , Schedule of Quantity , Item No 52 at page-64, BOQ-3

300 each Delivery: 60 days
#53

Supply of 15A socket Piano

As per specification document , Schedule of Quantity , Item No 53 at page-64, BOQ-3

300 each Delivery: 60 days
#54

Supply of 3 module plate legrand 675563

As per specification document , Schedule of Quantity , Item No 54 at page-64, BOQ-3

100 each Delivery: 60 days
#55

Supply of 6 module plate roma 30250 WH

As per specification document , Schedule of Quantity , Item No 55 at page-64, BOQ-3

20 each Delivery: 60 days
#56

ISI marked piano type rotory step type 6A fan regulator 2 module

As per specification document , Schedule of Quantity , Item No 56 at page-64, BOQ-3

75 each Delivery: 60 days
#57

Supply of ISI Marked MCB 16 Amps SP C Series MCBs

As per specification document , Schedule of Quantity , Item No 57 at page-64, BOQ-3

50 each Delivery: 60 days
#58

Supply of ISI Marked MCB 20 Amps DP C Series MCBs

As per specification document , Schedule of Quantity , Item No 58 at page-64, BOQ-3

50 each Delivery: 60 days
#59

Supply of ISI Marked MCB 25 Amps 3P C Series MCBs

As per specification document , Schedule of Quantity , Item No 59 at page-64, BOQ-3

10 each Delivery: 60 days
#60

Supply of ISI Marked MCB 32 Amps 3P C Series MCBs

As per specification document , Schedule of Quantity , Item No 60 at page-64, BOQ-3

10 each Delivery: 60 days
#61

Supply of ISI Marked MCB 40 Amps 4P C Series MCBs

As per specification document , Schedule of Quantity , Item No 61 at page-64, BOQ-3

20 each Delivery: 60 days
#62

Supply of ISI Marked MCB 63 Amps 4P C Series MCBs

As per specification document , Schedule of Quantity , Item No 62 at page-64, BOQ-3

20 each Delivery: 60 days
#63

Supply of 4 pole MCCB 400 Amps 50 KA

As per specification document , Schedule of Quantity , Item No 63 at page-64, BOQ-3

2 each Delivery: 60 days
#64

Supply of 4 pole MCCB 250 Amps 50 KA

As per specification document , Schedule of Quantity , Item No 64 at page-64, BOQ-3

2 each Delivery: 60 days
#65

Supply of 4 pole MCCB 100 Amps 36 KA

As per specification document , Schedule of Quantity , Item No 65 at page-64, BOQ-3

10 each Delivery: 60 days
#66

Supply of 3 pole MCCB 200 Amps 36 KA

As per specification document , Schedule of Quantity , Item No 66 at page-64, BOQ-3

2 each Delivery: 60 days
#67

Supply of 3 pole MCCB 100 Amps 36 KA

As per specification document , Schedule of Quantity , Item No 67 at page-64, BOQ-3

5 each Delivery: 60 days
#68

Supply of 3 pole MCCB 63 Amps 36 KA

As per specification document , Schedule of Quantity , Item No 68 at page-64, BOQ-3

5 each Delivery: 60 days
#69

Supply of 3 pole MCCB 32 Amps 36 KA

As per specification document , Schedule of Quantity , Item No 69 at page-65, BOQ-4

5 each Delivery: 60 days
#70

6A switch legrand M new 675501

As per specification document , Schedule of Quantity , Item No 70 at page-65, BOQ-4

200 each Delivery: 60 days
#71

Supply of 2.5 mfd capacitors suitable for ceiling fan

As per specification document , Schedule of Quantity , Item No 71 at page-65, BOQ-4

200 each Delivery: 60 days
#72

Supply of ISI Marked MCB 10 Amps SP C Series MCBs

As per specification document , Schedule of Quantity , Item No 72 at page-65, BOQ-4

100 each Delivery: 60 days
#73

Supply of Digital Street Light timer 230V AC

As per specification document , Schedule of Quantity , Item No 73 at page-65, BOQ-4

10 each Delivery: 60 days
#74

Supply of Star Delta timer 220V AC 3 sec - 120 sec 2NO

As per specification document , Schedule of Quantity , Item No 74 at page-65, BOQ-4

10 each Delivery: 60 days
#75

Supply of Under Voltage Monitoring Relay 415V Model No UVT D1

As per specification document , Schedule of Quantity , Item No 75 at page-65, BOQ-4

5 each Delivery: 60 days
#76

Add-on Auxilliary block consisting of 1NO and 1NC contacts for MOC contractor

As per specification document , Schedule of Quantity , Item No 76 at page-65, BOQ-4

20 each Delivery: 60 days
#77

MX0 22E 2 NO 2 NC contactor relay suitable for 220 V AC Coil Voltage

As per specification document , Schedule of Quantity , Item No 77 at page-65, BOQ-4

20 each Delivery: 60 days
#78

Auxilliary contact block 2NO and 2NC contacts suitable for MX0 22E

As per specification document , Schedule of Quantity , Item No 78 at page-65, BOQ-4

20 each Delivery: 60 days
#79

Supply of MX0 04E 4 NC contactor relay suitable for 220 V

As per specification document , Schedule of Quantity , Item No 79 at page-65, BOQ-4

5 each Delivery: 60 days
#80

Supply of MX0 04E Auxilliary contact block consisting of 4NC contacts

As per specification document , Schedule of Quantity , Item No 80 at page-65, BOQ-4

5 each Delivery: 60 days
#81

Supply of Flush Push Button with 1NO and 1NC 1 contact block

As per specification document , Schedule of Quantity , Item No 81 at page-65, BOQ-4

20 each Delivery: 60 days
#82

Supply of 4 pole Enclosure Box

As per specification document , Schedule of Quantity , Item No 82 at page-65, BOQ-4

10 each Delivery: 60 days
#83

Supply of 6 pole Enclosure Box

As per specification document , Schedule of Quantity , Item No 83 at page-65, BOQ-4

10 each Delivery: 60 days
#84

Utec make Washroom Panel UT TVB4500 HRT ADAPTER

As per specification document , Schedule of Quantity , Item No 84 at page-65, BOQ-4

20 each Delivery: 60 days
#85

Utec make Washroom Panel UT TVB4500 HRT MOTOR

As per specification document , Schedule of Quantity , Item No 85 at page-65, BOQ-4

20 each Delivery: 60 days
#86

Utec make Washroom Panel UT TVB4500 HRT CONNECTOR

As per specification document , Schedule of Quantity , Item No 86 at page-65, BOQ-4

20 each Delivery: 60 days
#87

Utec make Washroom Panel UT TVB4500 HRT RESET SWITCH

As per specification document , Schedule of Quantity , Item No 87 at page-65, BOQ-4

20 each Delivery: 60 days
#88

Utec make Washroom Panel UT TVB4500 HRT SENSOR EYE

As per specification document , Schedule of Quantity , Item No 88 at page-65, BOQ-4

10 each Delivery: 60 days
#89

Utec make Washroom Panel UT TVB4500 HRT PCB RESET BOARD

As per specification document , Schedule of Quantity , Item No 89 at page-65, BOQ-4

10 each Delivery: 60 days
#90

Utec make Washroom Panel UT TVB4500 HRT RUBBER ROLLER

As per specification document , Schedule of Quantity , Item No 90 at page-65, BOQ-4

20 each Delivery: 60 days
#91

Utec make Washroom Panel UT TVB4500 HRT ROLLER PLASTIC

As per specification document , Schedule of Quantity , Item No 91 at page-65, BOQ-4

20 each Delivery: 60 days
#92

Utec make Washroom Panel UT TVB4500 Motor for hand dryer

As per specification document , Schedule of Quantity , Item No 92 at page-66, BOQ-5

20 each Delivery: 60 days
#93

Utec make Washroom Panel UT TVB4500 Power Board

As per specification document , Schedule of Quantity , Item No 93 at page-66, BOQ-5

10 each Delivery: 60 days
#94

Utec make Washroom Panel UT TVB4500 Heater Element

As per specification document , Schedule of Quantity , Item No 94 at page-66, BOQ-5

10 each Delivery: 60 days
#95

Supply of 300 mm 900 rpm single phase heavy duty Exhaust fan

As per specification document , Schedule of Quantity , Item No 95 at page-66, BOQ-5

20 each Delivery: 60 days
#96

Supply of 200 mm 900 rpm single phase PVC Exhaust fan including louver

As per specification document , Schedule of Quantity , Item No 96 at page-66, BOQ-5

20 each Delivery: 60 days
#97

18_20W LED Batten with minimum 2000lumen and CCT 6000 K fixture 1PH

As per specification document , Schedule of Quantity , Item No 97 at page-66, BOQ-5

300 each Delivery: 60 days
#98

36_40W LED Batten with minimum 2000lumen and CCT 6000 K fixture 1PH

As per specification document , Schedule of Quantity , Item No 98 at page-66, BOQ-5

100 each Delivery: 60 days
#99

20 W 6500K LED Lamp bulb 1PH

As per specification document , Schedule of Quantity , Item No 99 at page-66, BOQ-5

100 each Delivery: 60 days
#100

12W LED Spot light round warm white downlights CCT-3000K 1PH

As per specification document , Schedule of Quantity , Item No 100 at page-66, BOQ-5

50 each Delivery: 60 days
#101

18_20W LED Spot light round white downlights CCT-3000K 1PH

As per specification document , Schedule of Quantity , Item No 101 at page-66, BOQ-5

50 each Delivery: 60 days
#102

50W Mono Colour 1PH

As per specification document , Schedule of Quantity , Item No 102 at page-66, BOQ-5

30 each Delivery: 60 days
#103

indoor type 2x2 feet recessed mounted min 36W LED 1PH

As per specification document , Schedule of Quantity , Item No 103 at page-66, BOQ-5

70 each Delivery: 60 days
#104

indoor type 4x1 feet surface mounted min 45W LED luminaire 1PH

As per specification document , Schedule of Quantity , Item No 104 at page-67, BOQ-6

50 each Delivery: 60 days
#105

250W LED flood light luminaire with IP65 protection

As per specification document , Schedule of Quantity , Item No 105 at page-67, BOQ-6

5 each Delivery: 60 days
#106

350 W LED Flood Light luminaire with IP 66 protected for Highmast

As per specification document , Schedule of Quantity , Item No 106 at page-67, BOQ-6

15 each Delivery: 60 days
#107

120W LED pressure die-cast aluminum housing street light Luminaire

As per specification document , Schedule of Quantity , Item No 107 at page-67, BOQ-6

10 each Delivery: 60 days
#108

LED Indication lamp Red-50 Nos, Yellow-50 Nos, Green-50 Nos

As per specification document , Schedule of Quantity , Item No 108 at page-67, BOQ-6

150 each Delivery: 60 days
#109

Supply of LED Indication lamp Blue-30 Nos

As per specification document , Schedule of Quantity , Item No 109 at page-67, BOQ-6

30 each Delivery: 60 days
#110

LED Indication lamp suitable for operation on AC or DC universal multi voltage

As per specification document , Schedule of Quantity , Item No 110 at page-67, BOQ-6

60 each Delivery: 60 days
#111

LED Indication lamp White-20 Nos, Blue-20 Nos 1P

As per specification document , Schedule of Quantity , Item No 111 at page-67, BOQ-6

40 each Delivery: 60 days
#112

Supply of 18W LED PLL lamp 4pin-4p-18-CDC

As per specification document , Schedule of Quantity , Item No 112 at page-67, BOQ-6

100 each Delivery: 60 days
#113

Supply of 1000W Halogen Lamp DE

As per specification document , Schedule of Quantity , Item No 113 at page-67, BOQ-6

20 each Delivery: 60 days
#114

flexible LED striplight with capacity of 4.8WattsMetre minimum

As per specification document , Schedule of Quantity , Item No 114 at page-67, BOQ-6

200 meter Delivery: 60 days
#115

Supply of LED Driver Suitable for LED Striplight mentioned in Item no 114

As per specification document , Schedule of Quantity , Item No 115 at page-67, BOQ-6

40 nos Delivery: 60 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
ABHISHEK INTEGRATIONS LIMITED   Under PMA
-13-10-2025 20:36:18
2
Industrial Traders   Under PMA
-13-10-2025 19:53:28
3
KRISHNA ELECTRICAL AGENCY   Under PMA
-14-10-2025 12:45:50
4
REWINDER TECHNO ELECTRICALS   Under PMA
-14-10-2025 10:26:15
5
UDAYA TECHNOLOGIES PRIVATE LIMITED   Under PMA
-14-10-2025 12:53:22
6
YASH ENERGY PRIVATE LIMITED   Under PMA
-14-10-2025 11:05:36

Financial Results

Rank Seller Price Item
L1
KRISHNA ELECTRICAL AGENCY(MII)( MSE Social Category:OBC )    Under PMA
Item Categories : Supply of square 12X20 mm size of PVC , ISI Marked casing -capping,Supply of 1.5 sq.mm. PVC insulat
L2
Industrial Traders (MII)   Under PMA
Item Categories : Supply of square 12X20 mm size of PVC , ISI Marked casing -capping,Supply of 1.5 sq.mm. PVC insulat
L3
YASH ENERGY PRIVATE LIMITED (MII)   Under PMA
Item Categories : Supply of square 12X20 mm size of PVC , ISI Marked casing -capping,Supply of 1.5 sq.mm. PVC insulat
L4
ABHISHEK INTEGRATIONS LIMITED (MII)( MSE Social Category:General )    Under PMA
Item Categories : Supply of square 12X20 mm size of PVC , ISI Marked casing -capping,Supply of 1.5 sq.mm. PVC insulat

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.