TenderDekho Logo
Closed GEM

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Aroto Rotary Gear Pump G-25 Tender Sonbhadra UP 2026

Bid Publish Date

27-Sep-2026, 12:11 pm

Bid End Date

16-Oct-2026, 1:00 pm

Generate Docs

Progress

Issue27-Sep-2026, 12:11 pm
Corrigendum13-Oct-2026
AwardPending

Tender Overview

The procuring organization is Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow. The contract seeks an Aroto Rotary Gear Pump, Model G-25 with pump body CI Grade 25 and shaft & gear EN-8 H&G. Location: Sonbhadra, Uttar Pradesh 231205. With no BOQ items listed, the tender appears to cover a single pump specification, subject to quantity variation. The procurement emphasizes a standard terms framework, including option-based quantity adjustments up to 25%, and a delivery timeline tied to the original order. This structure signals a compact, equipment-specific supply contract with clear delivery dynamics and extension rules. The absence of specified start/end dates or value suggests a modular tender focused on the distinct pump model and its critical material composition, enabling rapid bid alignment for bidders with the exact gear pump capability. The unique differentiator is the explicit option clause governing quantity and delivery extension, impacting price risk and scheduling. Bidder readiness hinges on matching the G-25 configuration, material grades, and EN-8 gear metallurgy to ensure compatibility with UP electricity sector applications.

Technical Specifications & Requirements

  • Product/Category: Aroto Rotary Gear Pump, Model G-25
  • Pump Body Material: CI Gr. 25
  • Shaft & Gear Material: EN-8 H&G
  • Location/Delivery: Sonbhadra, Uttar Pradesh 231205
  • Key Clause: Quantity may vary up to 25% at contract time and during currency with rates unchanged
  • No BOQ items listed; no explicit estimated value or EMD provided
  • No start/end dates published; ATC documented in uploaded file
  • Emphasis on compliance with OEM-specific gear pump standards and material grades

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase or decrease bid quantity by up to 25% at contract placement and during the contract currency
  • Delivery Timing: Delivery period starts from the last date of original delivery order; extended delivery follows a calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • If extended, delivery time may be adjusted up to the original delivery period; bidders must comply
  • ATC/ATC Document: An uploaded bidder-specific terms document exists; bidders should review for additional clauses
  • No explicit EMD amount, start/end dates, or estimated value available in the provided data
  • Commercial terms require alignment to the option-based delivery and equipment specifications

Key Specifications

  • Product/service: Aroto Rotary Gear Pump, Model G-25

  • Materials: Pump body CI Gr. 25, Shaft & Gear EN-8 H&G

  • Delivery: Sonbhadra, Uttar Pradesh (231205)

  • Quantity variation: +/- 25% from bid quantity

  • Delivery timing rule: starts from last date of original delivery order; extended time formula with minimum 30 days

  • No BOQ items published; no explicit estimated value or EMD in data

  • ATC: Bid-specific terms document uploaded

  • Brand/OEM requirements: Not explicitly stated beyond model/specs; verify ATC

Terms & Conditions

  • Option-based quantity adjustments up to 25% at contract initiation and during currency

  • Delivery period linked to last date of original order with extended-time calculation

  • Review ATC document for any additional bidder obligations and certifications

Important Clauses

Payment Terms

Not specified in data; refer to ATC for any payment timing or installment details

Delivery Schedule

Delivery begins from the last date of the original delivery order; extended period uses (increased quantity/original quantity) × original period with minimum 30 days

Penalties/Liquidated Damages

Not provided; ATC may include LD terms; bidders should verify during submission

Bidder Eligibility

  • Capability to supply Aroto Rotary Gear Pump Model G-25 meeting CI Gr. 25 and EN-8 H&G specs

  • Experience in government/electricity sector equipment supply

  • Financial viability evidenced by recent statements and tax registrations

Advertisement

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

4

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

" Aroto Rotary Gear Pump, Model G-25, Material: Pump Body CI Gr. 25, Shaft & Gear EN-8 H&G, Wear Pl

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Sonbhadra

Delivery Pincodes

231219

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shatrughan Singh231219,Obra Thermal Power PlantSonbhadraUttar Pradesh231219430-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9950025.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 6

Advertisement

Corrigendum Updates

3 Updates
#1

Update

13-Oct-2026

Extended Deadline

16-Oct-2026, 7:30 am

Opening Date

17-Oct-2026, 7:30 am

#2

Update

10-Oct-2026

Extended Deadline

13-Oct-2026, 7:30 am

Opening Date

14-Oct-2026, 7:30 am

#3

Update

07-Oct-2026

Extended Deadline

10-Oct-2026, 7:30 am

Opening Date

11-Oct-2026, 7:30 am

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates showing relevant gear pump supply

4

Financial statements demonstrating financial capability

5

EMD/Security deposit documents (if applicable per ATC)

6

Technical bid documents confirming G-25 rotary gear pump specification

7

OEM authorization/arrangements for Aroto gear pump model G-25

8

Any ISI/ISO/brand-specific certifications referenced in ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Aroto Rotary Gear Pump G-25 tender in Sonbhadra UP?

bidders must submit GST, PAN, experience certificates, financials, and EMD as per ATC. Ensure OEM authorization for Model G-25, CI Gr. 25 body, EN-8 H&G gears. Review delivery terms, including 25% quantity variation and minimum 30 days extension, and comply with any ATC-specific clauses.

What documents are required for UP electricity gear pump procurement 2026?

Required documents include GST certificate, PAN, experience certificates in gear pump supply, financial statements, EMD documents if applicable, technical bid confirming G-25 specification, and OEM authorization. ATC may specify additional materials; ensure bid package is complete.

What are the technical specifications for G-25 gear pump in UP tender?

Specifications specify Aroto Rotary Gear Pump Model G-25 with pump body CI Gr. 25 and shaft & gear EN-8 H&G. Ensure the pump matches these materials and geometry; no additional dimension data provided in data—verify with ATC if required for installation.

When is the delivery deadline under the option clause for 25% variation?

Delivery timing begins from the last date of the original order; extended time is computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Ensure planning aligns with potential 25% quantity changes at contract and during currency.

What is required to prove eligibility for UP government gear pump bids?

Prove eligibility with relevant experience certificates, financial competence, GST registration, and PAN. OEM authorization for G-25 is essential; ATC may require ISI/ISO certifications or brand-specific compliance depending on the document uploaded.

How to handle ATC terms for Aroto Gear Pump bid in UP 2026?

Carefully review the uploaded ATC document; it may specify payment terms, warranty expectations, and additional technical or delivery terms. Ensure your bid aligns with any extra clauses, brand requirements, or testing protocols stated in the ATC.

What is the role of quantity variation in the UP tender?

The purchaser reserves a ±25% quantity adjustment; bids should price flexibly for this range. During currency of contract, additional quantity may be ordered at contracted rates; plan inventory and production capacity accordingly, considering lead times and install compatibility.

Advertisement