Calibration Services - Electrical, LIGHT METER UV; Voltage, Current, Power (AC/DC), Frequency, Powe
Indian Air Force
Bid Publish Date
30-Oct-2025, 5:26 pm
Bid End Date
01-Dec-2025, 3:00 pm
EMD
₹6,00,000
Location
Progress
Quantity
3307
Category
PROFILING AC POWER LINE
Bid Type
Two Packet Bid
Organization: Hindustan Petroleum Corporation Ltd, Mumbai, Maharashtra. Procurement scope: profiling AC power line, data collection from utility, pre- and post-mitigation data logging, soil resistivity, coating resistance, and related surveying, plus training of HPCL users. Estimated value: not disclosed; EMD: ₹6,00,000. Delivery location: Mumbai, Maharashtra. Contract flexibility: option to increase/decrease quantity up to 25% at contracted rates with a minimum delivery extension rule of 30 days. The tender emphasizes compliance with the buyer’s integrity pact and specific vendor document submissions. Unique aspect: integration of multiple data-logging and survey activities under a single procurement bundle for HPCL operations.
Profiling AC power line data collection
Pre- and post-mitigation DC/AC interference logging
Soil resistivity measurement
Coating resistance measurement
Computer simulation study
Training for HPCL users
Quantity may vary by ±25% with pricing held constant
Integrity Pact mandatory with bid submission
Invoices must reflect consignee GSTIN
Not explicitly stated; payment terms to be as per HPCL standard terms and ATC
Delivery must consider option clause; extended delivery time formula provided; minimum 30 days
Not specified in data; penalties likely governed by HPCL terms and contract
Compliance with Integrity Pact
Submission of PAN, GSTIN, cancelled cheque, EFT mandate
Invoice in consignee GSTIN
Experience in data logging, soil testing, and interference surveying (as per ATC)
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
Eastern Coalfields Limited
Office Of Dg (aero)
BANGALORE, KARNATAKA
Airports Authority Of India
TUTICORIN, TAMIL NADU
Indian Air Force
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 10 | PROFILING AC POWER LINE | As per tender document | 529 | each | riteshpanda | 700 |
| 20 | DATA COLLECTION FROM UTILITY | As per tender document | 1 | lumpsum | riteshpanda | 700 |
| 30 | PRE-Mitigation Data logging-DC Interference | As per tender document | 700 | each | riteshpanda | 700 |
| 40 | PRE-Mitigation Data logging -AC Interference | As per tender document | 200 | each | riteshpanda | 700 |
| 50 | SPLY AND INSTLN OF AC CORR COUPON | As per tender document | 90 | each | riteshpanda | 700 |
| 60 | MEASUREMENT SOIL RESISTIVITY | As per tender document | 600 | each | riteshpanda | 700 |
| 70 | COMPUTER SIMULATION STUDY | As per tender document | 1 | lumpsum | riteshpanda | 700 |
| 80 | Post-Mitigation Data logging -DC Interference | As per tender document | 673 | each | riteshpanda | 700 |
| 90 | Post-Mitigation Data logging -AC Interference | As per tender document | 185 | each | riteshpanda | 700 |
| 100 | CP LINE CURRENT MEASURMENT | As per tender document | 60 | each | riteshpanda | 700 |
| 110 | COATING RESISTANCE MEASUREMENT | As per tender document | 60 | each | riteshpanda | 700 |
| 120 | AC INTERFERENCE SURVEY REPORT | As per tender document | 1 | lumpsum | riteshpanda | 700 |
| 130 | IMPART TRAINING TO HPCL USERS | As per tender document | 1 | lumpsum | riteshpanda | 700 |
| 140 | LOPL-PROFILING AC POWER LINE | As per tender document | 18 | each | riteshpanda | 700 |
| 150 | LOPL-DATA COLLECTION FROM UTILITY | As per tender document | 1 | lumpsum | riteshpanda | 700 |
| 160 | LOPL-PRE-Mitigation Data logging -DC Interference | As per tender document | 40 | each | riteshpanda | 700 |
| 170 | LOPL-PRE-Mitigation Data logging -AC Interference | As per tender document | 25 | each | riteshpanda | 700 |
| 180 | LOPL-SPLY AND INSTLN OF AC CORR COUPON | As per tender document | 10 | each | riteshpanda | 700 |
| 190 | LOPL-MEASUREMENT SOIL RESISTIVITY | As per tender document | 35 | each | riteshpanda | 700 |
| 200 | LOPL-COMPUTER SIMULATION STUDY | As per tender document | 1 | lumpsum | riteshpanda | 700 |
| 210 | LOPL-Post-Mitigation Data logging -DC Interference | As per tender document | 40 | each | riteshpanda | 700 |
| 220 | LOPL-Post-Mitigation Data logging -AC Interference | As per tender document | 25 | each | riteshpanda | 700 |
| 230 | LOPL-CP LINE CURRENT MEASURMENT | As per tender document | 5 | each | riteshpanda | 700 |
| 240 | LOPL-COATING RESISTANCE MEASUREMENT | As per tender document | 5 | each | riteshpanda | 700 |
| 250 | LOPL-INTERFERENCE SURVEY REPORT | As per tender document | 1 | lumpsum | riteshpanda | 700 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
Signed Integrity Pact (as per Buyer policy)
GSTIN-based invoice details for consignor
Vendor Code Creation documents
Any additional ATC/document view referenced by HPCL
Extended Deadline
01-Dec-2025, 3:00 pm
Opening Date
01-Dec-2025, 3:30 pm
Key insights about MAHARASHTRA tender market
Bidders should prepare mandatory documents: PAN, GSTIN, cancelled cheque, and bank-verified EFT Mandate; sign and upload the Integrity Pact; ensure invoice issuance in the consignee name with its GSTIN. The tender allows up to 25% quantity variation and requires compliance with HPCL ATC terms. Submit vendor code creation documents for registration.
Required documents include PAN, GSTIN, cancelled cheque, and bank-certified EFT Mandate; a signed Integrity Pact; vendor registration details; and invoices to reference the consignee GSTIN. Ensure all documents align with ATC and HPCL supplier policies for bid submission.
Although formal specs are not listed, bidders should demonstrate capability to perform soil resistivity and coating resistance measurements using standard field-testing methods. Include calibration procedures, data logging workflows, and deliverables like field notes and final reports compatible with HPCL data integration.
Delivery periods follow the option clause: increased quantity triggers a time cushion calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. If the original period is under 30 days, the extension equals the original period.
The EMD is ₹6,00,000. While payment mode isn’t specified, bidders should prepare an EMD submission per HPCL ATC guidelines, typically via demand draft or online transfer, ensuring the remittance references the bid and is valid during tender evaluation.
The tender data does not specify warranty terms; bidders should reference HPCL ATC for warranty, service levels, and post-implementation support. Prepare a clear warranty statement and AMC options in your technical bid to address potential post-delivery requirements.
Invoices must be issued in the name of the consignee and reflect the consignee’s GSTIN. Align billing with delivery milestones, attach supporting delivery notes, and ensure GST compliance. Address any discrepancies promptly to avoid payment delays under HPCL terms.
Download and sign the Integrity Pact as per HPCL policy and upload the scanned copy with the bid. Ensure all terms are understood, including anti-corruption commitments, audit rights, and disclosure of conflicts of interest. Non-compliance can disqualify the bid.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS