Bid Publish Date
12-Aug-2026, 10:45 pm
Bid End Date
27-Aug-2026, 11:00 am
Location
Progress
The Indian Coast Guard (Department of Defence) invites bids for the supply of ATU EVAPORATOR equipment at Visakhapatnam, Andhra Pradesh. The procurement requires a goods-only supply with a 3-year warranty from final acceptance or post-installation completion. Key constraints include prompt design Drawings submission within 5 days of award and Buyer approval or modification list within 7 days; delivery timeline will be adjusted if drawing approvals are delayed, with no liquidated damages for Buyer delays. OEM warranty certificates must accompany delivery, and the bidder must demonstrate Indian installation, commissioning, training, troubleshooting, and maintenance support capability with valid service centers near consignee locations. The BOQ shows zero items, signaling potential design-focused or single-supply scope.
Delivery timeline adjustments without LD if drawing approvals are delayed
3-year OEM warranty from acceptance/installation date
Submission of Detailed Design Drawings within 5 days of award
Provide service center details and in-India after-sales support
Only supply of Goods; alignment with approved drawings
Delivery period will be refixed if Buyer delays in approving Detailed Design Drawings; no LD applied for Buyer-delayed approval
3-year warranty from final acceptance or after completion of installation; OEM warranty certificates required at delivery; in-India service network mandatory
Submit Detailed Design Drawings within 5 days; Buyer to approve or list modifications within 7 days; supply must follow approved drawings
Demonstrated ability to deliver goods with in-India after-sales support
OEM authorization and warranty provision for supplied product
Compliance with Buyer-approved Detailed Design Drawings and modifications
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
50 %
Warranty Period
3 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ATU EVAPORATOR
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Visakhapatnam
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Visakhapatnam | Visakhapatnam | - | - | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
OEM authorization letter confirming product and brand ownership
Detailed Design Drawings (DD) submitted within 5 days of award
Buyer-approved modification list or approval notes within 7 days
OEM warranty certificates to be submitted at the time of delivery
Proof of established Installation, Commissioning, Training, Troubleshooting and Maintenance service network in INDIA
List of Service Centres near consignee destinations
Any bidder qualifies supporting documents demonstrating prior similar supply experience (if requested)
Key insights about ANDHRA PRADESH tender market
Bidders must submit Detailed Design Drawings within 5 days of award and obtain Buyer approval or modification list within 7 days. Provide OEM warranty certificates at delivery, and demonstrate in-India service capability with near-consignee service centers. Goods-only supply with drawings aligned to approved design conditions.
Submit OEM authorization, Detailed Design Drawings within 5 days, Buyer-approved modification list within 7 days, OEM warranty certificates at delivery, and documentation proving Indian installation/commissioning and maintenance capability with service center details near consignee locations.
A 3-year warranty from final acceptance or after installation/commissioning, whichever is applicable, plusOEM warranty certificates at delivery. After-sales support must be available nationwide in India with service centers near consignee locations.
If Buyer delays approval, the delivery period will be refixed accordingly, and no liquidated damage will be charged for the period of delay attributable to the Buyer. Bidder must monitor drawing approvals and adjust timelines.
Provide a well-established Installation, Commissioning, Training, Troubleshooting and Maintenance service group in India, with verified Service Centers near consignee destinations; upload these details with the bid submission.
Submit Detailed Design Drawings within 5 days; upon Buyer approval, deliver strictly per the approved drawings and incorporate any communicated modifications. Non-conformity may affect acceptance and warranty eligibility.
Scope is limited to Only supply of Goods; the bidder must include all cost components in the bid price and ensure the product matches the designed conditions and approved drawings.
Service centers must be located within India with verifiable proximity to consignee destinations in Visakhapatnam and other Indian locations; bidders must upload center details with the bid.