TenderDekho Logo
Closed GEM

Open Tender for 8 Ports POE Managed Access switch,24 Ports POE Managed Access switch,24 Ports 10G fiber core switch in FARIDABAD, HARYANA

Bid Publish Date

23-Dec-2025, 11:03 am

Bid End Date

13-Jan-2026, 5:00 pm

EMD

₹3,00,000

Value

₹1,49,99,747

Progress

Issue23-Dec-2025, 11:03 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

14908

Category

24 Ports 10G fiber core switch

Bid Type

Two Packet Bid

Categories 29

Nhpc Limited announces a tender for 8 Ports POE Managed Access switch, 24 Ports POE Managed Access switch, 24 Ports 10G fiber core switch, Handhelded Optical Time-Domain Reflectometer, Handheld Optical Power Meter, 12 Cores Single Mode Unitube Armourd Fiber Optic Cable, CAT 6 IO Module with Face Plate, Cat 6 Jack or Patch Panel 24 Port Loaded, Cat 6 UTP Patch Cord 1 Meter, Cat 6 UTP Patch Cord 2 Meter, Cat 6 UTP Patch Cord 3 Meter, OFC Dual Patch Cord LC-LC, MM, 3Mtr. , OFC Dual Patch Cord LC-LC, MM, 5 Mtr. , OFC Dual Patch Cord LC-SC, MM, 3 Mtr. , OFC Dual Patch Cord LC-SC, MM, 5 Mtr. , OFC Dual Patch Cord LC-LC, SM, 3 Mtr. , OFC Dual Patch Cord LC- LC, SM, 5 Mtr. , OFC Dual Patch Cord LC-SC, SM, 3 Mtr. , OFC Dual Patch Cord LC-SC, SM, 5 Mtr. , FIBER MODULE SFP, 10G, SINGLE MODE, LR, FIBER MODULE SFP, 10G, MULTIMODE, SR, SFP MODULE, 10G, COPPER RJ45, HDPE PIPE, CAT 6 UTP Cable Box 305 Mtr or higher, 9U wall mountable Networking Rack, Supply Laying Installation and Testing as per scope of work in FARIDABAD, HARYANA. Quantity: 14908. Submission Deadline: 13-01-2026 17: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

8 Ports POE Managed Access switch , 24 Ports POE Managed Access switch , 24 Ports 10G fiber core switch , Handhelded Optical Time-Domain Reflectometer , Handheld Optical Power Meter , 12 Cores Single Mode Unitube Armourd Fiber Optic Cable , CAT 6 IO Module with Face Plate , Cat 6 Jack or Patch Panel 24 Port Loaded , Cat 6 UTP Patch Cord 1 Meter , Cat 6 UTP Patch Cord 2 Meter , Cat 6 UTP Patch Cord 3 Meter , OFC Dual Patch Cord LC-LC, MM, 3Mtr. , OFC Dual Patch Cord LC-LC, MM, 5 Mtr. , OFC Dual Patch Cord LC-SC, MM, 3 Mtr. , OFC Dual Patch Cord LC-SC, MM, 5 Mtr. , OFC Dual Patch Cord LC-LC, SM, 3 Mtr. , OFC Dual Patch Cord LC- LC, SM, 5 Mtr. , OFC Dual Patch Cord LC-SC, SM, 3 Mtr. , OFC Dual Patch Cord LC-SC, SM, 5 Mtr. , FIBER MODULE SFP, 10G, SINGLE MODE, LR , FIBER MODULE SFP, 10G, MULTIMODE, SR , SFP MODULE ,10G ,COPPER RJ45 , HDPE PIPE , CAT 6 UTP Cable Box 305 Mtr or higher , 9U wall mountable Networking Rack , Supply Laying Installation and Testing as per scope of work

Authority Records

MINISTRY OF POWERNATIONAL HYDROELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8739125.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 26 Items Sign in for GEM prices

#1

8 Ports POE Managed Access switch

8 Ports POE+ Managed Access switch with 05 years warranty

6 nos Delivery: 150 days
#2

24 Ports POE Managed Access switch

24 Ports POE+ Managed Access switch with 05 years warranty

10 nos Delivery: 150 days
#3

24 Ports 10G fiber core switch

24 Ports 10G fiber core switch with 05 years warranty

4 nos Delivery: 150 days
#4

Handhelded Optical Time-Domain Reflectometer

Handhelded Optical Time-Domain Reflectometer (OTDR)

1 nos Delivery: 150 days
#5

Handheld Optical Power Meter

Handheld Optical Power Meter

1 nos Delivery: 150 days
#6

12 Cores Single Mode Unitube Armourd Fiber Optic Cable

12-Cores Single Mode Unitube Armourd Fiber Optic Cable

6,325 mtr Delivery: 150 days
#7

CAT 6 IO Module with Face Plate

CAT 6, IO Module with Face Plate

300 nos Delivery: 150 days
#8

Cat 6 Jack or Patch Panel 24 Port Loaded

Cat-6 Jack/Patch Panel 24 Port Loaded

10 nos Delivery: 150 days
#9

Cat 6 UTP Patch Cord 1 Meter

Cat 6 UTP Patch Cord ( 1 Meter )

1,250 nos Delivery: 150 days
#10

Cat 6 UTP Patch Cord 2 Meter

Cat 6 UTP Patch Cord ( 2 Meter )

1,250 nos Delivery: 150 days
#11

Cat 6 UTP Patch Cord 3 Meter

Cat 6 UTP Patch Cord ( 3 Meter )

750 nos Delivery: 150 days
#12

OFC Dual Patch Cord LC-LC, MM, 3Mtr.

OFC Dual Patch Cord LC-LC, MM, 3Mtr.

100 mtr Delivery: 150 days
#13

OFC Dual Patch Cord LC-LC, MM, 5 Mtr.

OFC Dual Patch Cord LC-LC, MM, 5 Mtr.

100 nos Delivery: 150 days
#14

OFC Dual Patch Cord LC-SC, MM, 3 Mtr.

OFC Dual Patch Cord LC-SC, MM, 3 Mtr.

100 nos Delivery: 150 days
#15

OFC Dual Patch Cord LC-SC, MM, 5 Mtr.

OFC Dual Patch Cord LC-SC, MM, 5 Mtr.

100 nos Delivery: 150 days
#16

OFC Dual Patch Cord LC-LC, SM, 3 Mtr.

OFC Dual Patch Cord LC-LC, SM, 3 Mtr.

100 nos Delivery: 150 days
#17

OFC Dual Patch Cord LC-LC, SM, 5 Mtr.

OFC Dual Patch Cord LC-LC, SM, 5 Mtr.

100 nos Delivery: 150 days
#18

OFC Dual Patch Cord LC-SC, SM, 3 Mtr.

OFC Dual Patch Cord LC-SC, SM, 3 Mtr.

100 nos Delivery: 150 days
#19

OFC Dual Patch Cord LC-SC, SM, 5 Mtr.

OFC Dual Patch Cord LC-SC, SM, 5 Mtr.

100 nos Delivery: 150 days
#20

FIBER MODULE SFP, 10G, SINGLE MODE, LR

FIBER MODULE SFP, 10G, SINGLE MODE, LR

20 nos Delivery: 150 days
#21

FIBER MODULE SFP, 10G, MULTIMODE, SR

FIBER MODULE SFP, 10G, MULTIMODE, SR

20 nos Delivery: 150 days
#22

SFP MODULE ,10G ,COPPER RJ45

SFP MODULE ,10G ,COPPER RJ45

30 nos Delivery: 150 days
#23

HDPE PIPE

HDPE PIPE

4,000 mtr Delivery: 150 days
#24

CAT 6 UTP Cable Box 305 Mtr or higher

CAT 6 UTP Cable Box (305 Mtr or higher)

120 nos Delivery: 150 days
#25

9U wall mountable Networking Rack

9U wall mountable Networking Rack

10 nos Delivery: 150 days
#26

Supply Laying Installation and Testing as per scope of work

Supply, Laying, Installation and Testing as per scope of work

1 lot Delivery: 150 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer