TenderDekho Logo
Active GEM

Bank Of Baroda Gold Purity Testing Meter Tender Chennai 2026 KARAT Meter V2

Bid Publish Date

25-Sep-2026, 6:04 pm

Bid End Date

16-Oct-2026, 4:00 pm

EMD

₹35,000

Value

₹35,00,000

Progress

Issue25-Sep-2026, 6:04 pm
AwardPending

Tender Overview

Bank Of Baroda invites bids for a Gold Purity Testing Meter (Karat Meter) V2 with an estimated value of ₹3,500,000 and an EMD of ₹35,000. The scope covers Supply, Installation, Testing, Commissioning, Training of operators and providing statutory clearances if required. The purchase allows a quantity variation of up to 25% at the contracted rates, with delivery time adjustments based on a formula. The bid requires a DD payable at Chennai for the EMD and submission of hard copies within 5 days post bid end date. The award mandates a functional service center in the consignee state (within 30 days if not existing) and a toll-free service line with an escalation matrix.

Technical Specifications & Requirements

  • Product/Service: Gold Purity Testing Meter (Kar at Meter) V2; procurement category: gold testing equipment.
  • Estimated value: ₹3,500,000; EMD: ₹35,000.
  • Scope: supply, installation, testing, commissioning, operator training; statutory clearances if required.
  • EMD/PBG process: DD payable to Bank of Baroda, Chennai; scanned DD proof uploaded; hard copy delivered within 5 days; post-award DD submission allowed in place of PBG within 15 days.
  • Service & Support: establish/maintain a service center in the consignee state within 30 days; Dedicated toll-free support; Escalation matrix for service requests.
  • Warranty: ensure timely servicing and defect rectification during warranty; service terms responsive to notifications.

Terms, Conditions & Eligibility

  • Quantity flexibility: up to 25% increase/decrease during contract; delivery period adjusts accordingly, minimum 30 days when extended.
  • Delivery/Installation: includes installation, testing, commissioning, and operator training; may require statutory clearances if applicable.
  • Payment terms: dependent on service center evidence and project milestones; PBG/DD accepted with delivery commitments.
  • Warranty/Support: mandatory after-sales service with established support channel and escalation matrix.

Key Specifications

  • Gold Purity Testing Meter (Karat Meter) V2

  • Estimated value ₹3,500,000; EMD ₹35,000

  • Scope: Supply, Installation, Testing, Commissioning, Operator Training

  • DD payable at Chennai for EMD; hard copy within 5 days

  • PBG optional; DD in place of PBG within 15 days after award

  • Service Center in consignee state within 30 days; toll-free support; escalation matrix

  • Warranty servicing and defect rectification during warranty period

Terms & Conditions

  • EMD of ₹35,000 via DD in favor of Bank of Baroda, payable at Chennai

  • Quantity can vary ±25% with contracted rates; delivery period adjusts

  • Service centers must exist in the consignee state or be established within 30 days

  • Dedicated toll-free service line and escalation matrix required

  • Scope includes installation, testing, commissioning, and operator training

  • Warranty servicing and timely defect rectification are required

Important Clauses

Payment Terms

DD-based EMD; post-award DD can substitute PBG; payment terms linked to service evidence and delivery milestones

Delivery Schedule

Delivery period linked to original delivery order; additional time calculated as (increased quantity / original quantity) × original delivery period with a minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; penalties would apply per standard contract terms for delayed delivery or non-performance

Bidder Eligibility

  • Functional service center requirement in the consignee state or establishment within 30 days of award

  • Dedicated toll-free service line and established escalation matrix

  • Ability to supply, install, test, commission, and train operators for gold testing equipment

  • DD-based EMD of ₹35,000 payable at Chennai; bid submission must include scanned DD proof

Advertisement

Tender Data

Bid Details

Quantity

5

Bid Validity

75 (Days)

Bid Type

Service

Evaluation

Item wise consignee wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

105

OEM Avg. Turnover

140

Warranty Period

3 days

Experience Required

3 Year (s)

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Gold Purity Testing Meter/ Karat Meter (V2) (Q3)

Advisory Bank

Bank Of Baroda

Pre-Bid & Qualification

Pre-Bid Date

03-10-2026 15:00:00

Pre-Bid Venue

Bank of Baroda, New No.41, Luz Church Road, Mylapore, Chennai-600 004

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9945970.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bank Of Baroda

Office Name

Chennai Zone

Grievance Contact

[email protected]

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

How to bid for Bank of Baroda gold testing meter tender in Chennai 2026

Bidders must submit the EMD of ₹35,000 via Demand Draft payable at Chennai, along with scanned proof and hard copies within 5 days. Include supply, installation, testing, commissioning, and operator training details. Provide service center evidence and escalation matrix; the bid allows up to 25% quantity variation at contracted rates.

What documents are required for karat meter procurement bid in Chennai

Submit GST registration, PAN, company profiles, financial statements, experience certificates for similar projects, OEM authorizations, technical bid documents, and the DD for ₹35,000 EMD. Include proof of service centers and escalation matrix; deliver hard copies within 5 days of bid end date.

What are the delivery and installation requirements for the karat meter bid

Scope includes Supply, Installation, Testing, Commissioning, and Operator Training. Delivery terms allow a ±25% quantity variation; delivery period scales with quantity and includes a minimum 30 days for extended delivery. Service center setup must be completed within 30 days of award.

What is the EMD amount and payment terms for this tender

EMD is ₹35,000 payable via Account Payee Demand Draft in favor of Bank of Baroda, payable at Chennai. Scanned DD proof must accompany the bid; hard copy must reach within 5 days. PBG may be substituted by DD after award, with hard copy delivery within 15 days.

What warranty and after-sales support are required for the meter

The bidder must ensure timely servicing and defect rectification during the warranty period following notification. A dedicated toll-free service line and escalation matrix must be provided, with a functional service center in the consignee state or established within 30 days of contract award.

What are the impact rules on quantity variation for this procurement

The purchaser may increase or decrease the quantity by up to 25% at contract placement. During the contract, increased quantity is allowed at contracted rates; delivery time extends using the specified formula with a minimum 30 days, ensuring updated delivery schedules.

Where will service centers and support be required for the meter

A functional Service Centre must exist in the State of the consignee; if absent, the bidder/OEM must establish one within 30 days of award. Payment release is contingent on submission of documentary evidence confirming the center's operation.

Advertisement