TenderDekho Logo
Active GEM

Central Railway Hand Held Search Light Torch Tender 2026 IR - Tri-Colour LED, Micro Controller Based, ISI/IRS Standards 2025

Bid Publish Date

07-Oct-2026, 11:11 am

Bid End Date

19-Oct-2026, 7:00 pm

Progress

Issue07-Oct-2026, 11:11 am
AwardPending

Tender Overview

Central Railway, Indian Railways, invites bids for the supply of a Micro Controller Based Multi-Purpose Tri Colour Rechargeable LED Torch (hand held search light) under the IRS 2025 guidelines. The scope is restricted to the supply of goods, with data sheet submission mandatory to verify technical parameters. The contract allows a quantity variation of up to 25% during order placement and also within the currency period, at contracted rates. A key differentiator is the requirement to attach OEM authorization or self-OEM declarations and a specific Annexure-I, failing which bids will be rejected. The ATC mandates adherence to attached detailed specifications, with penalties for non-compliance. Location details are not provided in the tender metadata, but the procuring organization is Central Railway. This bid emphasizes close alignment between the offered torch’s technical sheet and carrier-grade performance per IRS contracts and the option clause governs supply scalability.

Technical Specifications & Requirements

  • Product name: Micro Controller Based Multi-Purpose Tri Colour Rechargeable LED Torch (hand held search light)
  • Core requirement: Tri-colour LED with rechargeable battery, MCU-based control, and compliance with IRS 2025 terms
  • Documentation: Upload Data Sheet; attach Annexure-I and OEM Authorization or Self-OEM Declaration
  • ** OEM rules**: If bidder is OEM, provide Self-OEM Declaration; non-submission leads to rejection
  • Compliance: Ensure material and performance per attached specification sheet; where conflicts arise, the attached sheet prevails
  • Warranty/Support: Per IRS 2025 conditions; warranty/AMC terms not separately specified in tender text
  • Delivery scope: Only supply of goods; no services explicitly included
  • ATC requirements: Manufacturer authorization from OEM/service provider with complete contact details

Terms, Conditions & Eligibility

  • Quantity variation: Up to 25% increase/decrease at contract placement and during currency period
  • Delivery timeline: As per original delivery order; extended period calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Data sheet compliance: Mandatory; mismatch may lead to bid rejection
  • Documentation: OEM authorization, Annexure-I, and data sheet must be submitted with bid
  • Warranty: Per IRS 2025 attached conditions
  • Past performance: Railway reserves the right to evaluate prior performance; explicit criteria documented in ATC

Key Specifications

  • Micro Controller Based control unit incorporated

  • Tri Colour LED output (multi-color capability)

  • Rechargeable battery with safe charging features

  • Data Sheet mandatory and must match offered parameters

  • OEM Authorization or Self-OEM Declaration required

Terms & Conditions

  • Quantity variation up to 25% during contract and currency period

  • Delivery period governed by original D.O. with option to extend using the specified formula

  • Mandatory Data Sheet, OEM Authorization, and Annexure-I; non-submission leads to rejection

Important Clauses

Payment Terms

Not specified in provided ATC

Delivery Schedule

Delivery starts from the last date of original delivery order; extended time calculated with formula and minimum 30 days

Penalties/Liquidated Damages

Not explicitly defined in tender text; penalties subject to IRS/ATC conditions

Bidder Eligibility

  • Must supply Micro Controller Based LED torches per IRS 2025

  • Must provide OEM authorization or be the OEM with declaration

  • Data Sheet must match offered product specifications

Advertisement

Tender Data

Bid Details

Quantity

1986

Bid Type

Single Packet Bid

Bid Validity

100 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Hand Held Search Light (Q2)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Jalgaon

Delivery Pincodes

425201

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rahul Babruwan Gaikwad425201,DRM OFFICE CENTRAL RAILWAY BHUSAWALJalgaonMaharashtra425201198645-

Authority Records

MINISTRY OF RAILWAYSCENTRAL RAILWAY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9987525.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Central Railway

Department

Indian Railways

Office Name

Central Railway Stores Deptt

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Data Sheet of the product offered

2

OEM Authorization / Manufacturer Authorization form

3

Annexure-I completed and attached

4

Self-OEM Declaration (if bidder is the OEM)

5

Bidder submission documents including GST, PAN, and financials (as applicable per ATC) if specified

6

Past performance certificates (railways/PSU experiences can be included)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the Central Railway torch tender in 2026?

Bidders must submit Data Sheet, Annexure-I, and OEM Authorization or Self-OEM Declaration with the bid. Ensure compliance with IRS 2025 terms and include OEM documentation to avoid rejection. The bid focuses on a microcontroller-based tri-colour rechargeable LED torch; delivery terms follow original DO with potential 25% quantity variation.

What documents are required for the hand held torch tender in Indian Railways?

Required documents include the product Data Sheet, OEM Authorization, Annexure-I, and Self-OEM Declaration if applicable. Also include GST, PAN, and potential financial statements per ATC. Data sheet must align with the offered model to pass technical verification.

What are the technical standards for the LED torch in this tender?

The tender mandates IRS 2025 conditions and a microcontroller-based tri-colour LED configuration. The attached specification sheet governs final parameters; if conflicts arise, the attached sheet prevails. Ensure data sheet matches offered features and include complete OEM certification.

When is the delivery timeline for the Central Railway torch contract?

Delivery begins from the last date of the original delivery order. If quantity increases or currency extension is exercised, the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What is required for OEM authorization in this tender?

Bidder must provide OEM authorization or a self-declaration if the bidder is the OEM, including name, designation, address, email, and phone. Without this, the offer may be summarily rejected per ATC clause.

What is the scope of supply for this tender in Central Railway?

Scope is strictly the supply of goods—specifically the microcontroller-based, tri-colour rechargeable LED torch. Services are not included, and compliance with the attached specification sheet is mandatory with data sheet alignment.

What is the impact if the data sheet does not match the product?

A mismatch between the Data Sheet and offered product parameters leads to bid rejection. Ensure the data sheet precisely reflects the actual model’s features, LED configuration, battery type, charging method, and MCU controls prior to submission.

What are the 25% quantity variation terms in this tender?

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during the currency period at contracted rates. The delivery period adjusts per the established formula with a 30-day minimum extension.

Advertisement