TenderDekho Logo
Closed GEM

Gail Gas Limited Gas Meter RPD Meters Tender No Specified Uttar Pradesh 2026

Bid Publish Date

02-Apr-2026, 4:52 pm

Bid End Date

27-Apr-2026, 2:00 pm

EMD

₹28,700

Progress

Issue02-Apr-2026, 4:52 pm
Corrigendum18-Apr-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

193

Category

RPD Gas Meter G 10 2 inch as per technical specification and consignee mentioned in tender document

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements unspecified in excerpt; check ATC for any mandated OEM authorizations
  • Exact gas meter size range and EVC sensor integration defined in tender title; confirm IS/IEC standards in ATC
  • Geographic scope across GAIL Gas Limited zones; consignee-based pricing per SOW/SCC
  • EMD amount clearly listed as ₹28,700; verify payment mode in ATC
  • No technical specifications published here; rely on uploaded ATC and SOW for standards and testing
  • Delivery, installation, warranty, and penalties to be detailed in ATC and terms

Categories 6

Tender Overview

GAIL Gas Limited invites bids for a range of RPD Gas Meter G 10 2 inch up to G 1000 6 inch and G 40 1.5/2 inch, plus EVC with Pressure and Temperature sensor. The scope covers consignee-specific procurement across multiple geographical zones in Uttar Pradesh. EMD: ₹28,700. The estimated value and precise quantities are not disclosed in the provided data. This tender requires alignment with uploaded ATC terms and area-specific SOW/SCC details, and bidders must quote per consignee details. No technical specifications are published in the excerpt, increasing reliance on ATC clarity.

Key Specifications

  • Gas meters: sizes G 10 2 inch to G 1000 6 inch

  • EVC with Pressure and Temperature sensor

  • 17 total items in BOQ; quantities not disclosed

  • EMD: ₹28,700

  • Geographical scope across multiple zones; consignee-specific delivery

  • ATC-driven standards, OEM authorizations to be confirmed

Terms & Conditions

  • EMD amount is ₹28,700; submit with bid as specified in ATC

  • Geographical scope varies by consignee; verify SOW/SCC locations

  • Detailed terms, delivery, warranty, and penalties are in uploaded ATC

Important Clauses

Payment Terms

Payment schedule and milestones to be defined in ATC and SOW; verify against GeM portal submission

Delivery Schedule

Delivery timelines per consignee; exact dates to be specified in ATC

Penalties/Liquidated Damages

LD terms to be defined in ATC; typical penalties for late delivery and non-conformance

Bidder Eligibility

  • Experience in supplying gas meters or similar utility meters

  • Capability to service multiple geographical zones as per SOW/SCC

  • Compliance with OEM/IS/IEC standards as per ATC

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

RPD Gas Meter G 10 2 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 16 2 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 25 2 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G40 1.5 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 40 2 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 65 2 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 100 2 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 100 3 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 160 3 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 250 3 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 250 4 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 400 3 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 400 4 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 400 6 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 650 6 inch as per technical specification and consignee mentioned in tender document , RPD Gas Meter G 1000 6 inch as per technical specification and consignee mentioned in tender document , EVC with Pressure and temperature sensor as per technical specification and consignee mentioned in tender document

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9163996.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

RPD Gas Meter G 10 2 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 10 2 inch as per technical specification and consignee mentioned in tender document

5 pieces Delivery: 112 days
#2

RPD Gas Meter G 16 2 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 16 2 inch as per technical specification and consignee mentioned in tender document

35 pieces Delivery: 112 days
#3

RPD Gas Meter G 25 2 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 25 2 inch as per technical specification and consignee mentioned in tender document

37 pieces Delivery: 112 days
#4

RPD Gas Meter G40 1.5 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G40 1.5 inch as per technical specification and consignee mentioned in tender document

3 pieces Delivery: 112 days
#5

RPD Gas Meter G 40 2 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 40 2 inch as per technical specification and consignee mentioned in tender document

20 pieces Delivery: 112 days
#6

RPD Gas Meter G 65 2 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 65 2 inch as per technical specification and consignee mentioned in tender document

20 pieces Delivery: 112 days
#7

RPD Gas Meter G 100 2 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 100 2 inch as per technical specification and consignee mentioned in tender document

2 pieces Delivery: 112 days
#8

RPD Gas Meter G 100 3 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 100 3 inch as per technical specification and consignee mentioned in tender document

11 pieces Delivery: 112 days
#9

RPD Gas Meter G 160 3 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 160 3 inch as per technical specification and consignee mentioned in tender document

14 pieces Delivery: 112 days
#10

RPD Gas Meter G 250 3 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 250 3 inch as per technical specification and consignee mentioned in tender document

3 pieces Delivery: 112 days
#11

RPD Gas Meter G 250 4 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 250 4 inch as per technical specification and consignee mentioned in tender document

1 pieces Delivery: 112 days
#12

RPD Gas Meter G 400 3 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 400 3 inch as per technical specification and consignee mentioned in tender document

7 pieces Delivery: 112 days
#13

RPD Gas Meter G 400 4 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 400 4 inch as per technical specification and consignee mentioned in tender document

3 pieces Delivery: 112 days
#14

RPD Gas Meter G 400 6 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 400 6 inch as per technical specification and consignee mentioned in tender document

4 pieces Delivery: 112 days
#15

RPD Gas Meter G 650 6 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 650 6 inch as per technical specification and consignee mentioned in tender document

6 pieces Delivery: 112 days
#16

RPD Gas Meter G 1000 6 inch as per technical specification and consignee mentioned in tender document

RPD Gas Meter G 1000 6 inch as per technical specification and consignee mentioned in tender document

2 pieces Delivery: 112 days
#17

EVC with Pressure and temperature sensor as per technical specification and consignee mentioned in tender document

EVC with Pressure and temperature sensor as per technical specification and consignee mentioned in tender document

20 pieces Delivery: 112 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar gas-meter supply

4

Financial statements or turnover proof

5

EMD payment receipt/document

6

Technical bid document or compliance statement

7

OEM authorization letter (if required by ATC)

Corrigendum Updates

2 Updates
#1

Update

18-Apr-2026
#2

Update

15-Apr-2026

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid on the gas meters tender in Uttar Pradesh 2026

Bidders must submit GST, PAN, experience certificates, financial statements, EMD ₹28,700, and OEM authorizations as per the uploaded ATC. Ensure GB compliance against 17 BOQ items and consignee-specific SOW. Review delivery, payment, and warranty terms in SOW/SCC before price submission.

What documents are required for GAIL Gas meter procurement in UP

Required documents include GST certificate, PAN, company financials, experience certificates for similar meters, EMD submission, technical bid/compliance, and OEM authorization if mandated by ATC. Ensure bidder eligibility aligns with multi-zone consignee delivery requirements.

What are the technical specifications for RPD gas meters in UP tender

Technical specs are provided in the ATC/SOW; this excerpt lists meter sizes G 10 2 inch to G 1000 6 inch and EVC with pressure/temperature sensor. Verify exact dosages, connection standards, thread types, and calibration requirements in the uploaded ATC for compliance.

When is the delivery schedule for UP gas meter tender in 2026

Delivery timelines are defined in the ATC and SOW/SCC; bidders must align with consignee-specific delivery requirements. Final dates will be published in the uploaded ATC and must be honored to avoid penalties per LD terms.

What are the payment terms for the GAIL UP gas meter supply contract

Payment terms appear in the ATC; typical arrangements involve milestone-based payments after delivery and acceptance. Confirm any advance, milestones, and post-delivery payment conditions within the SOW and GeM portal bid response.

What is the EMD amount and submission for this tender UP

EMD is ₹28,700; submit with bid as per ATC instructions. Ensure payment method aligns with GeM portal requirements and attach EMD receipt to the technical bid package.

What standards or certifications are required for UP gas meters

Standards are defined in the ATC/SOW; bidders must provide OEM authorizations and any required certifications. Review IS/IEC compatibility, calibration, and factory testing requirements in the uploaded ATC to ensure compliance.

How to verify consignee details for GAIL UP tender

Consignee details are in the SOW/SCC and ATC; bidders must quote per location. Cross-check each zone’s delivery address, installation site, and commissioning requirements before final submission.