TenderDekho Logo
Closed GEM

Tender Notice for Bulk Milk Cooler Unit in HYDERABAD, TELANGANA

Bid Publish Date

23-Apr-2025, 4:56 pm

Bid End Date

09-Jun-2025, 5:00 pm

EMD

₹13,000

Generate Docs

Progress

Issue23-Apr-2025, 4:56 pm
Technical14-05-2025 12:58:10
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

3

Bid Type

Two Packet Bid

Categories 5

Public procurement opportunity for Telangana State Dairy Development Cooperative Fed Bulk Milk Cooler Unit (Q4) in HYDERABAD, TELANGANA. Quantity: 3 issued by. Submission Deadline: 09-06-2025 17: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Bulk Milk Cooler Unit (Q4)

Authority Records

ANIMAL HUSBANDRY AND FISHERIES DEPARTMENTTHE TELANGANA STATE DAIRY DEVELOPMENT COOPERATIVE FEDERATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7766067.pdf

Main Document

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

6 Updates
#1

Update

28-May-2025

Extended Deadline

09-Jun-2025, 5:00 pm

Opening Date

09-Jun-2025, 5:30 pm

#2

Update

24-May-2025

Extended Deadline

30-May-2025, 5:00 pm

Opening Date

30-May-2025, 5:30 pm

#3

Update

14-May-2025

Extended Deadline

26-May-2025, 3:00 pm

Opening Date

26-May-2025, 3:30 pm

#4

Update

08-May-2025
#5

Update

08-May-2025

Extended Deadline

19-May-2025, 5:00 pm

Opening Date

19-May-2025, 5:30 pm

#6

Update

05-May-2025

Extended Deadline

16-May-2025, 5:00 pm

Opening Date

16-May-2025, 5:30 pm

Technical Results

S.No Seller Item Date Status
1
Gemak Engineering Solutions   Under PMA
Make : NA Model : GES/BMC 1KL/OT/1P/SC14-05-2025 12:58:10
2
IDMC LIMITED   Under PMA
Make : IDMC LIMITED Model : IDMC Make BMC 1KL OPEN TYPE09-06-2025 11:01:59
3
KRISHNA DEFENCE AND ALLIED INDUSTRIES LIMITED   Under PMA
Make : KRISHNA ALLIED INDUSTRIES PVT LTD Model : KDBMCOHT100007-06-2025 17:22:52
4
M/S UMADEVI ENGINEERING INDUSTRIES   Under PMA
Make : NA Model : GES/BMC 1KL/OT/1P/SC07-06-2025 16:52:07
5
VENTURE STEELS PRIVATE LIMITED   Under PMA
Make : Venture Model : Venture 7 Segment LED Type Bulk Milk Cooler 110009-06-2025 14:42:14

Financial Results

Rank Seller Price Item
L1
M/S UMADEVI ENGINEERING INDUSTRIES( MSE Social Category:OBC )    Under PMA
Item Categories : Bulk Milk Cooler Unit
L2
Gemak Engineering Solutions   Under PMA
Item Categories : Bulk Milk Cooler Unit
L3
VENTURE STEELS PRIVATE LIMITED   Under PMA
Item Categories : Bulk Milk Cooler Unit
L4
IDMC LIMITED   Under PMA
Item Categories : Bulk Milk Cooler Unit
L5
KRISHNA DEFENCE AND ALLIED INDUSTRIES LIMITED   Under PMA
Item Categories : Bulk Milk Cooler Unit

Frequently Asked Questions

Key insights about TELANGANA tender market

What are the eligibility requirements for GEM/2025/B/6163925?

The eligibility requirements include being a registered entity, demonstrating prior experience in supplying similar equipment, and compliance with local procurement policies. Additionally, financial stability and capability must be proven through recent financial statements and previous contract executions.

What technical specifications must the Bulk Milk Cooler Units comply with?

The technical specifications for the Bulk Milk Cooler Units include a minimum capacity of 1000 liters, automatic temperature control systems, and an energy-efficient design. The units should also be manufactured from durable, food-grade materials, adhering to safety and regulatory standards.

What is the process for submitting documents for the tender?

The submission process requires bidders to submit their proposals electronically via the designated procurement platform, including a completed bid form and all necessary technical and financial documentation. It's crucial to adhere to submission deadlines to ensure consideration.

What is the Earnest Money Deposit (EMD) requirement for this tender?

While specific details regarding the Earnest Money Deposit (EMD) are contingent upon the tender documentation, typically, it comprises a small percentage of the total bid amount, intended to secure the bidder's commitment. It's vital to check the tender guidelines for exact figures and submission methods.

Are there any benefits for Micro, Small, and Medium Enterprises (MSEs) participating in this tender?

Yes, the tender includes special provisions for MSEs, providing them with advantages in the evaluation process. Such benefits can result in additional weightage during bid assessment, reflecting the government’s initiative to support and promote local businesses and startups within procurement processes.