TenderDekho Logo
GEM

Rural Development Department Bihar Nylon Life Jacket Tender Samastipur 2026 - MHA Q3 Advance Sample Compliance

Bid Publish Date

07-Jul-2026, 9:22 pm

Bid End Date

18-Jul-2026, 9:00 am

Progress

Issue07-Jul-2026, 9:22 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

30

Bid Type

Two Packet Bid

Key Highlights

  • Advance Sample(s) required for buyer approval before supply
  • Option clause allows ±25% quantity adjustment during contract
  • 7-day DIN submission window for Detailed Design Drawings post-award
  • Pre-dispatch inspection at seller premises; buyer bears external lab costs
  • Delivery/installation to buyer-provided address; modification per buyer drawings
  • No BOQ items listed; suggests framework or single-supply arrangement
  • Delivery period adjustments tied to approval delays with no LD for buyer delays

Categories 2

Tender Overview

The opportunity is from the Rural Development Department Bihar, for procuring Nylon Life Jackets (MHA) at Q3 level in Samastipur, Bihar (PIN 848101). The tender specifies an Advance Sample requirement for buyer approval before supply and includes an option clause enabling a ±25% quantity adjustment at contract award and during the contract period. Post-award, detailed design drawings must be submitted within 7 days, with buyer feedback provided within 7 days. Pre-dispatch inspection is mandated, with inspection costs borne by the buyer. The project scope emphasizes adherence to approved drawings and schedule impacts if the buyer delays approval. The BOQ shows no items listed, suggesting a framework or single-supply focus rather than a multi-item bill of quantities. A DELIVERY/INSTALLATION address will be provided by the buyer. This tender highlights rigorous approval workflows and flexible quantities to accommodate demand variability.

Technical Specifications & Requirements

  • Product category: Nylon Life Jacket (MHA), Q3 level, bulk supply readiness
  • Advance Sample(s): required for buyer approval before commencement of supply
  • Option Clause: quantity may increase/decrease by up to 25% at contract placement and during currency at contracted rates
  • Design Drawings: approved by buyer prior to fabrication; submittal within 7 days of award; buyer response within 7 days; modifications per buyer directives
  • Delivery/Installation: to buyer-provided address; installation scope if included must align with approved drawings
  • Inspection: pre-dispatch inspection at seller premises; buyer bears external inspection/testing costs; in-house testing facilities provided by seller at no charge
  • BOQ Status: 0 items listed; implies single-supply or framework arrangement
  • Compliance & Standards: not specified beyond approvals; emphasize adherence to buyer-specified specs and sample approvals

Terms, Conditions & Eligibility

  • Option Clause: quantity adjustments up to 25%; extended delivery time proportionally calculated with minimum 30 days; original period governs if under 30 days
  • Drawings Approval: Detailed Design Drawings must be approved or return modification list within 7 days of award
  • Delivery & Delays: delay due to buyer’s drawing approval extends delivery without LD
  • Financial Standing: bidder must not be in liquidation or similar proceedings (undesignated in data; bid undertaking required)
  • Pre-Dispatch Inspection: inspection at seller premises; inspection costs borne by Buyer; external labs or A&A agency to be decided by Buyer
  • Documentation: include standard bid submission materials as per T&C; GST, PAN, and experience evidence commonly required by T&Cs
  • Delivery Address: buyer-provided; installation, if within scope, to be completed at the buyer’s location
  • Warranty/Aftercare: not stated; ensure post-delivery support aligns with regulatory norms for MHA life jackets

Key Specifications

  • Nylon Life Jacket (MHA) – Q3 category

  • Advance Sample(s) required for buyer approval prior to supply

  • Delivery quantity flexibility up to 25% during contract

  • 7-day submission window for Detailed Design Drawings; 7-day buyer response

  • Pre-dispatch inspection conducted at seller premises; external testing costs borne by Buyer

Terms & Conditions

  • Advance sample approval required before fabrication

  • 25% quantity variation permitted during and after order

  • 7-day design drawing submission and 7-day buyer feedback window

  • Pre-dispatch inspection arranged by buyer; inspection costs paid by buyer

  • Delivery address to be provided by buyer; potential installation scope

Important Clauses

Delivery Schedule

Original delivery period plus calculated extension for increased quantity; minimum extension 30 days; extended period not to incur LD when approvals delay

Payment Terms

Not specified in data; typical T&Cs require bid security and compliance with delivery milestones; details to be confirmed during final offer

Penalties/Liquidated Damages

Not explicitly stated; LD provisions would be as per contract law and buyer’s standard terms; verify in final bid document

Bidder Eligibility

  • Not under liquidation or similar proceedings; provide undertaking

  • Proven experience in supplying safety equipment (nylon life jackets) to government entities

  • Financial stability demonstrated via audited statements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Nylon Life Jacket (MHA) (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Samastipur

Delivery Pincodes

848132

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Alok Kumar Gupta848132,panchayat office chandchour kariharaSamastipurBihar8481323015-

Authority Records

RURAL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9572897.pdf

Main Document

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Panchayati Raj Department Bihar Nylon Life Jacket (MHA) Q3 Tender Jamui 811301 Advance Sample 2026

Panchayati Raj Department

JAMUI, BIHAR

Posted: 20 June 2026
Closed: 30 June 2026
GEM

Nylon Life Jacket (MHA)

N/a

North Goa, GOA

Posted: 18 December 2024
Closed: 25 January 2025
GEM

Nylon Life Jacket (MHA)

Indo Tibetan Border Police (itbp)

Posted: 22 November 2024
Closed: 13 December 2024
GEM

Nylon Life Jacket (MHA)

Indian Coast Guard

ERNAKULAM, KERALA

Posted: 4 March 2025
Closed: 28 March 2025
GEM

Nylon Life Jacket (MHA)

South Eastern Coalfields Limited

KORBA, CHHATTISGARH

Posted: 4 October 2025
Closed: 15 October 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
ADVANCE SAMPLE Agree to provide Advance Sample(s) for buyer's approval before commencement of supply No

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply of safety equipment

4

Financial statements and solvency undertakings

5

EMD/ bid security (as per T&C provisions)

6

Technical bid documents demonstrating nylon life jacket specifications

7

OEM authorizations or approvals (if applicable)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for nylon life jacket tender in Samastipur Bihar 2026?

Bidders must submit standard bid documents (GST, PAN, experience certificates, financials) along with technical specs for Nylon Life Jackets (MHA) and an Advance Sample for buyer approval. The contract allows a 25% quantity variation and requires Detailed Design Drawings within 7 days of award. Pre-dispatch inspection is buyer-borne for external labs, with delivery to a buyer-provided address.

What are the eligibility criteria for Rural Development Bihar life jacket tender in 2026?

Eligible bidders must not be under liquidation, provide an undertaking of financial stability, demonstrate prior experience supplying safety equipment to government bodies, and furnish GST and PAN. The supplier must also submit Technical bids showing compliance with nylon life jacket standards and participate in the advance sample approval process.

What documents are required for the nylon life jacket procurement in Bihar?

Required documents include GST registration, PAN card, experience certificates for similar jackets, financial statements, an EMD/security deposit as per T&C, technical compliance documents for jacket specifications, and OEM authorizations if applicable. These must accompany the bid submission along with the advance sample proposal.

What standards or certifications are expected for the jackets in this tender?

The tender specifies ISI/MHA compliance expectations implicitly through the Advance Sample and Design Approval process, with emphasis on buyer-approved specifications. Vendors should ensure jackets meet safety, material, and fit requirements as per buyer-approved drawings and any applicable Indian safety norms during final submission.

When is the 7-day design drawing submission required after award?

Within 7 days of contract award, the successful bidder must submit Detailed Design Drawings for buyer approval. The buyer will respond with approval or a list of modifications within the next 7 days; supply must align with approved drawings and modifications.

What is the delivery policy if drawings approval is delayed by the buyer?

If the buyer delays approval of drawings, the delivery period is reset to reflect the delay, with no liquidated damages for the period of delay. The original delivery period remains the governing baseline once approvals are finalized.

How does the 25% quantity option affect the procurement of nylon jackets in this tender?

The purchaser may increase or decrease the ordered quantity by up to 25% at contract placement and during the contract currency at contracted rates. The extended delivery period is calculated by a formula based on increased quantity, with a minimum extension of 30 days.

What is the pre-dispatch inspection process for the jackets in Bihar tender?

Pre-dispatch inspection occurs at the seller’s premises, conducted by the buyer or their authorized agent or an external lab. Inspection costs for external testing are borne by the buyer; in-house testing facilities are provided by the seller at no cost.

Similar Tenders

5 found
Urgent

Synthetic Life Jacket (NDRF)

Indian Army

📍 NAGPUR, MAHARASHTRA

Est: ₹1.5 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Synthetic Life Jacket (NDRF)

Fire And Rescue Services Department

📍 CHENNAI, TAMIL NADU

EMD: ₹36,000
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Life Jacket as per IS 6685

South Eastern Coalfields Limited

📍 KORBA, CHHATTISGARH

Est: ₹49,897
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Bullet Resistant Jackets (V4) ISI Marked to IS 17051,Bullet Resistant Helmet (MHA)

Indian Air Force

📍 SOUTH ANDAMAN, ANDAMAN & NICOBAR

EMD: ₹30,000
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Bullet Resistant Jackets (V4) ISI Marked to IS 17051,Bullet Resistant Jackets (V4) ISI Marked to IS

Power Grid Corporation Of India Limited

📍 ANANTHNAG, JAMMU & KASHMIR

EMD: ₹4.4 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM